08-0030 Mechanical Summary 0212082006
2006 Washington State NorimsYdential Energy Code Compliance Foms
State Nonresidential Energy Code Compliance Form
July 2007
Project Info
Project Address 1304 YELL AVE
Date 2]7/2008
BUILDING ,X
For Building Dept Use
3 - Fill out this line an PRJ -SUM
Applicant Name: SOUND HEATING s A/c INC
Applicant Address 5526 184TH s 8 PUPAS LUP NA
Applicant Phone: 253 -e75-3350
Project Description ROOF TOP KNITS FOR SHELL FREEZE PROTECTION
Briefly describe mechanical
system type and features.
0 Includes Plans IDrawings must contain notes requireing compliance with commissioning requirements - Section 1416
Simple System 0 Complex System 0 Systems Analysis
Compliance Option (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple s complex systems. )
Equipment Schedules The following Information is required to be incorporated with the mechanical equipment schedules on the
plans_ For projects without plans, fill in the required information below.
Coolin g Equipment Schedule
Equip.
ID
Brand Name'
Model No.'
Capacity2
Muth
Total CFM
OSA CFM
or Econo?
SEER
or EER
IPLV3
Location
RTU
1611
YORK
DJ036NOSP
100K
1200
LCONO
100
79
80.500
Heatin g Equipment Schedule
Equip.
ID
Brand Name'
Model No.'
Capacity2
Btufh
TOW CFM
OSA cfm
or Econo?
Input Btuh
Output Btuh
Efflcienc a
RTU
1611
YORK
DJ036NOSP
100K
1200
LCONO
100
79
80.500
Fan Equipment Schedule
Equip.
ID
Brand Name'
Model No.'
CFM
SP'
HPIGHP
Flow Controls
Location of Service
' If available. 2 As tested according to Table 14 -1A through 14 -1 G. 3 If required. ° Cop, HSPF, Combustion Efficiency, or AFIIE, as
applicable. s Flow control types: variable air volume(VAV), constant volume (CV), of variable speed (VS).
2006 Washington State Nonresidential Energy Code Compliance Form
System Description
See Section 1421 for full description
of Simple System qualifications.
If Heating /Cooling D Constant vol? [] Air cooled? ❑ Packaged sys? [] X20,000 Btuh?
or Cooling Only. 0 Split system ? --Q Economizer included?
if Heating Only: ] 5000 cfm? X70 / outside air?
Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the
Complex System or Systems Analysis Options must be used.
=R�nce Heating Only
<6000 Yes
drn?
No
No
4- 84,000
Btuh?
'M 00b> -No or
o—Ln Ad3acent to
Yes
Reference No
5ec�on1423
Total CE
wo econor
<240,OOO 1
or 10%
Yes
054,000
Use Complex I
Systems
(section 1430)
Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which
Complex Systems Complex Systems requirements are applicable to this project,
2006 Washington State Nonresidential Energy Code Compliance Form
Permit Plans r
Mechanical cklist
2048 Wmehinl;Wn State Non residenbal Energy Code Cornpillsnce Farm Revised July 2007
Project Address 1.304 rases Ave
Da4e 2/7%2008
The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the
Washington State Nonresidential Energy Code.
Applicability
(yes, no, n.a.)
Code
I Section
Component
Information Required
Location
on Plans
Building Department
Notes
HVAC REQUIREMENTS (Sections 1401 -1424)
1411
Equipment performance
a.
1411.4
Pkg. elec. htg.& clg.
List heat pumps on schedule
yes
1411.1
Minimum efficiency
Equipment schedule with type, capacity, efficiency
Mi
n.a.
1411.1
Combustion htg.
Indicate intermittent ignition, flueldraft damper & jacket loss
1412
HVAC controls
yes
1412.1
Temperature zones
Indicate locations on plans
Ml
yes
1412.2
Deadband control
Indicate 5 degree deadband minimum
Mi
n.a.
1412.3
Humidity control
Indicate humidistat
yes
1412.4
Automatic setback
Indicate thermostat with night setback and 7 dill. day types
Mi
a .
1412.4.1
Dampers
Indicate damper location and auto, controls & max. leakage
a.
1412.4.2
Optimum Start
Indicate optimum start controls
a.
1412.5
Heat pump control
Indicate microprocessor on thermostat schedule
a.
1412.6
Combustion htg.
Indicate modulating or staged control
a.
1412.7
Balancing
Indicate balancing features on plans
1412.8
Ventilation Control
Indicate demand control ventilation for high- occupancy areas
n. a.
1422
Thermostat interlock
Indicate thermostat interlock on plans
yes
1423
Economizers
Equipment schedule
mi
1413
Air economizers
yes
14131
Air Econo Operation
Indicate 100% capability on schedule
a •
1413.1
Wtr Econo Operation
Indicate 100% capacity at 45 degF db & 40 deg F wb
a.
14132
Water Econo Doc
Indicate clg load & water econoe & clg tower performance
a.
1413.3
Integrated operation
Indicate capability for partial cooling
a.
1413.4
Humidification Indicate direct evap or fog atomization wl air economizer
1414
Ducting systems
no
1414.1
Duct sealing
Indicate seating necessary
a.
1414.2
Duct insulation
Indicate R -value of insulation on duct
. a.
1415.1
Piping insulation
Indicate R -value of insulation on piping
Completion Requirements
a .
1416.2.1
Commissioning
Provide commissioning plan
a.
1416.2.2 -3
Sys. Bal & Func.Test
Indicate air and water system balancing & functional testing
a •
1416. 2.4
Commissioning
Indicate O &M manuals, record drawings, staff training
yes 1
1416.2.5
Comm. Report
Indicate requirements for prelim. & final commissioning report
M-1
n.a. 1
1434 ISeparate
air sys.
Indicate separate systems on plans
Mechanical
Summary Form
Completed and attached. Equipment schedule with types,
input/output, efficiency, cfm, hp, economizer
SERVICE WATER
HEATING
AND HEATEV
POOLS ec Ions
1440
Service water htg.
a.
1441
Elec. water heater
Indicate R -10 insulation under tank
a .
1442
Shut -off controls
indicate automatic shut -off
a.
1443
Pipe Insulation
Indicate R -value of insulation on piping
. a.
1452
Heat Pump COP
Indicate minimum COP of 4.0
a.
1452
Heater Efficiency
Indicate pool heater efficiency
a .
1453
Pool heater controls
Indicate switch and 65 degree control
a.
1454
Pool covers
Indicate vapor retardant cover
no
1454 1
Pools 30+ degrees
Indicate R -12 pool cover
2006
State Nonresidential Energy Cade Compbonde Fo£n4
State Nonresidential Energv Code Compliance f=orm
Revised .luty 2007
Project Info
Project Address 1304 Yela Ave
Date 2/7/2008
building A
For Building Dept. Use
Relm We
Applicant Name: sound Beating i A/C Inc
Applicant Address: 5526 184th St E Puyallup Ma
Applicant Phone: 253 - 875 -3356
Project Description roof top unit and duct for 2,1741 sq ft T.I.
Briefly describe mechanical
system type and features.
0 Includes Plans (Drawings must contain notes requireing compliance with commissioning requirements - Section 1416
Q simple System 0 Complex System 0 Systems Analysis
Compliance Option (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple 8 complex systems.)
Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the
plans. For projects without plans, fill in the required information below.
Coolin g Equipment Schedule
Equip.
IO
Brand Name'
Model No.'
Capacity
Btulh
Total CFM
OSA CFM
or Econo?
SEER
or EER
IPLV3
Location
RTU 1
YORE
Iis06omioP -- -
59 H5H
2000
.YES
13.4 SEER
ROOF
Heatin g Equipment Schedule
Equip-
ID
Brand Name'
Model No.'
Capacity
Btuih
Total CFM
OSA cfm
or Econo?
input Btuh
Output Btuh
E ffiCiency s
NoTONE
QTWR116
110
0.50
LOCAL SWITCH
TOILET ROODS
Fan E ui ment Schedule
Equip.
ID
Brand Name'
Model No.'
CFM
Sp'
HP /BHP
Flow Controt5
Location of Service
Er 1 -2
NoTONE
QTWR116
110
0.50
LOCAL SWITCH
TOILET ROODS
'If available. z As tested according to Table 14 -1A through 14 -1 G. 3 If required. ° COP. HSPF, Combustion Efficiency, orAFUE, as
applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). RECEIVED
2006 Washington State Nonresidential Energy Code Compliance Form
d i
System Description
See Section 1421 for full description
of Simple System qualifications.
If Heating /Cooling
or Cooling Only:
Constant vol?
Split system?
J Air cooled? Packaged sys? 11 <20,000 Btuh?
61 Economizer included?
If Heating Only: <5000 cfm?
❑ <70% outside air?
Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the
Complex System or Systems Analysis Options must be used.
START
<70% OSA
No
<- 84,000
Btuh?
I Ca '[u moors
<20,000 N
f tub? �utdoor ,
Yes
Deference No
Section 1423
<240,000
7 or 10°1
Y
Simple System Yes
<54,000
Use Complex
Systems
(section 1430)
Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which
Complex Systems Complex Systems requirements are applicable to this project.
2006 Washington State Nonresidential Energy Code Compliance Form
Mechanical Permit Plans Checklist
2 O179 Weahingtvn State Now"denbal. Energy Code Compliance Forms Revised July 2007
ProjactAddress 1344 Ye1m Ave
Date 2/7/'2008
The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the
Washington State Nonresidential Energy Code.
Applicability
(yes, no, n.a.)
Cottle
I Section
Component
Information Required
Location
on Plans
Building Department
Notes
HVAC REQUIREMENTS (Sections 1401.1424)
1411
Equipment performance
. a .
1411.4
Pkg. elec. htg.& clg.
List treat pumps on schedule
yes
1411.1
Minimum efficiency
Equipment schedule with type, capacity, efficiency
M1
n.a.
1411.1
Combustion Mg.
Indicate intermittent ignition, flueldraft damper & jacket loss
1412
HVAC controls
yes
1412.1
Temperature zones
Indicate locations on plans
141
yes
1412.2
Headband control
Indicate 5 degree deadband minimum
MI
n. a.
1412.3
Humidity control
Indicate humidistat
yes
1412.4
Automatic setback
Indicate thermostat with night setback and 7 dill. day types
M-1
yes
1412.4,1
Dampers
Indicate damper location and auto. controls & max. leakage
rs1:
a.
1412.4.2
Optimum Start
Indicate optimum start controls
a.
1412.5
Heat pump control
Indicate microprocessor on thermostat schedule
. a.
1412.6
Combustion htg.
Indicate modulating or staged control
yes
1412.7
Balancing
Indicate balancing features on plans
Ki
1412.8
Ventilation Control
Indicate demand control ventilation for high - occupancy areas
. a .
1422
Thermostat interlock
indicate thermostat interlock on plans
yea
1423
Economizers
Equipment schedule
M1
1413
Air economizers
yes
1413.1
Air Econo Operation
Indicate 100% capability on schedule
M1
yes
1413.1
Wtr Econo Operation
Indicate 100% capacity at 45 degF db & 40 deg F wb
n.a.
1413.2
Water Econo Doc
Indicate clg load & water econoe & clg tower performance
n.a.
1413.3
Integrated operation
Indicate capability for partial cooling
1413.4
lHumidification Indicate direct evap or Fog atomization wl air economizer
1414
Ducting systems
yes
1414.1
Duct sealing
Indicate sealing necessary
M-1
yes
1414.2
Duct insulation
Indicate R -value of insulation on duct
M1
a .
1415.1
- - -
Piping insulation
Indicate R -value of insulation on piping
Completion Requirements -
Yes
1416.2.1
Commissioning
Provide commissioning plan
M1
yes
1416.21-3
Sys.Bal & Func.Test
Indicate air and water system balancing & functional testing
M1
yes
1416.2.4
Commissioning
Indicate O &M manuals, record drawings, staff training
yes
1416.2.5
Gomm. Report
Indicate requirements for prelim. & final commissioning report
n. A.
1434
Separate air sys.
Indicate separate systems on plans
Mechanical
Summary Form linputJoutput,
Completed and attached. Equipment schedule with types.
efficiency. cfm, hp. economizer
SERVICE WATER
HEATING
AN[) HEATEI)
POOLS (Sections
1440
Service water htg.
a.
1441
Elec, water heater
Indicate R -10 insulation under tank
a •
1442
Shut -off controls
Indicate automatic shut -off
a.
1443
Pipe Insulation
Indicate R -value of insulation on piping
a •
1452
Heat Pump COP
Indicate minimum COP of 4.0
. a .
1452
Heater Efficiency
Indicate pool heater efficiency
a •
1453
Pool heater controls
Indicate switch and 65 degree control
a.
1454
Pool covers
Indicate vapor retardant cover
a.
1454
Pools 90+ degrees
Indicate R -12 pool cover