Loading...
Follow up Approval LetterApril 4, 2003 Bill Hertel 10101 SE 270th Place Kent, WA 98031 Re: Site Plan Approval for Case # SPR-02-8314-YL, Prairie Auto Glass Dear Mr. Hertel: It has been some time since we have heard from you, and wanted to follow up with the Site Plan Approval for Prairie Auto Glass. Under normal circumstances, all conditions of approval must be met before a business receives Certificate of Occupancy. The Prairie Auto Glass business was operating in violation of Yelm Municipal Code Chapter 17, and Site Plan Approval was required to bring the site into compliance with City regulations. In light of the Yelm Avenue construction project, some leeway for the required improvements was granted, to allow for the road construction to be completed. Now that the road construction is complete, the Site Plan Review Conditions of Approval must be met. I have listed below, the conditions that are not complete at this time. Please complete the following conditions, and request an inspection by the Community Development Department by June 30, 2003. 3. Sewer System Conditions of Approval: Upon completion of the onsite installation as per the City’s Development Guidelines, the S.T.E.P. sewer equipment shall be deeded to the City, and an easement provided for maintenance. Incomplete. 5. Parking Conditions of Approval: The applicant shall create a paved parking area, meeting the City of Yelm Development Guideline standards, with a minimum of 7 parking stalls. The parking bays inside the structure do not count towards this requirement. Incomplete. 6. Building Department Conditions of Approval: Design Guidelines II, Pedestrian Access. All pedestrian paths must correspond with federal, state and local codes for handicap access, and ADA requirements. All buildings shall have a paved pedestrian path from street sidewalk to the main entry, and provide pathways through parking lots. Incomplete. 7. Fire Conditions of Approval The applicant shall submit fire flow calculations for all existing and proposed hydrants. All hydrants must meet minimum City standards. Incomplete. The applicant shall submit a fire hydrant plan to the Community Development Department for review and approval. Incomplete. 8. Landscaping Conditions of Approval: The applicant shall include a landscape plan to the Community Development Department with civil plan submittal, for review and approval. Incomplete. The applicant shall provide for Type II landscaping around the building. Incomplete. The applicant shall provide for Type IV landscaping in the parking areas. Incomplete. The applicant shall provide a letter signed by the tenants of the two homes on the site, agreeing to allow the business to operate without the required landscape buffers. Incomplete. Completed landscaping shall be approved by the Community Development Department at the completion of installation of the utilities and parking. Incomplete. 10. Other Conditions of Approval: Commercial signage is governed by Yelm Municipal Code, Chapter 15.24. The business owner shall be required to bring his signage into compliance with City codes within 30 days of receipt of this letter. The owner of Prairie Auto Glass should contact Mr. Gary Carlson, City of Yelm Building Official at 360-458-8407, to discuss sign code requirements. If you have any questions, please do not hesitate to call. I can be reached at (360) 458-8496. Sincerely, Tami Merriman Assistant Planner cc: Mr. Norman Gorton, Prairie Auto Glass Jim Gibson, Development Services Engineer Gary Carlson, Building Official