05-0201 Civil Eng #2 080105
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
August 1, 2005
Brown’s Car Care
Mike Brown
16510 106th Ave SE
Yelm, WA 98589
RE: Second Review - Yelm Auto Mall
City of Yelm Project SPR-05-0201-YL (note revised project number)
Location: Parcel B of BLA 02-8324
Mr. Brown:
The City of Yelm has completed the second review of the proposed parking lot expansion located on Parcel B of BLA 02-8324. Your application included:
Civil Engineering Construction Documents (2 pages)
Stormwater Drainage Report Summary (1 page)
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following
comments need to be addressed before the plans may be approved for construction. Our comments are summarized below:
Stormwater Report:
The stormwater pond must be rehabilitated as part of this project. This shall include removing overgrown vegetation, replanting grass in the swale and adding riprap as required at the
inlet and outlets of the stormwater system. Add a note to the plans showing this requirement to be completed.
Landscape Plan:
A landscape plan is required showing how the landscaping requirements are being met. The landscaping plan must be approved by Community Development Department before the plans will
be approved for construction.
Conditions of Approval:
The plans will need to address all land use conditions of approval that pertain to the construction plans.
Please review and revise the plans to address the above referenced comments. If you are confident the above comments have been addressed you may submit the following information:
One full size mylar set of plans (city to retain)
One full size set of plans for applicants records (returned to applicant)
One half size set of construction plans (city to retain)
One CD with AutoCAD drawings (city to retain)
The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly
expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us.
Community Development Department
Respectfully,
James Gibson P.E.
Development Review Engineer
cc. Jerry Wakefield, Apex Engineering
enc.