05-0201 Civil Eng Approval 091305
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
September 13, 2005
Brown’s Car Care
Mike Brown
16510 106th Ave SE
Yelm, WA 98589
RE: Civil Engineering Approval - Yelm Auto Mall
City of Yelm Project SPR-05-0201-YL
Location: Parcel B of BLA 02-8324
Mr. Brown:
The City of Yelm has completed the final review of the proposed parking lot expansion located on Parcel B of BLA 02-8324. Your application included:
Civil Engineering Construction Documents (2 pages dated Sept 1, 2005)
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice.
This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed before or during the construction process.
After the signed drawings are returned to you, you will need to provide 4 sets to the Community Development Department for the construction inspectors.
You must schedule a required preconstruction meeting with the City and its inspectors before your construction begins.
Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required.
A request from the engineer of record must be presented for any changes requested to the plans.
The engineering review invoice must be paid in full before the preconstruction meeting.
If this project is expecting to install lights that were not shown on the land use plan or civil engineering plans it will be required to submit an illumination plans that meets the
requirements of the City of Yelm Municipal Code.
This project has not resubmitted the Landscape and Irrigation plans to the Community Development Department. Please resubmit these plans for approval.
If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us.
Community Development Department
Respectfully,
James Gibson P.E.
Development Review Engineer
cc. Jerry Wakefield, Apex Engineering
enc.