Loading...
05-0201 Civil Eng Approval 091305 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   September 13, 2005 Brown’s Car Care Mike Brown 16510 106th Ave SE Yelm, WA 98589 RE: Civil Engineering Approval - Yelm Auto Mall City of Yelm Project SPR-05-0201-YL Location: Parcel B of BLA 02-8324 Mr. Brown: The City of Yelm has completed the final review of the proposed parking lot expansion located on Parcel B of BLA 02-8324. Your application included: Civil Engineering Construction Documents (2 pages dated Sept 1, 2005) We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed before or during the construction process. After the signed drawings are returned to you, you will need to provide 4 sets to the Community Development Department for the construction inspectors. You must schedule a required preconstruction meeting with the City and its inspectors before your construction begins. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. A request from the engineer of record must be presented for any changes requested to the plans. The engineering review invoice must be paid in full before the preconstruction meeting. If this project is expecting to install lights that were not shown on the land use plan or civil engineering plans it will be required to submit an illumination plans that meets the requirements of the City of Yelm Municipal Code. This project has not resubmitted the Landscape and Irrigation plans to the Community Development Department. Please resubmit these plans for approval. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, James Gibson P.E. Development Review Engineer cc. Jerry Wakefield, Apex Engineering enc.