Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Punchlist
,., L~~~ ~~ ,'~ ~' Augt,st 29, 2007 ;' ' Steve Harrington 4zoa 5ixt1, Ave sE, s~~~te 301 City of Yelm Lacey, WA 985D3 Community Development Department (3soa 493-soot 105 Yelm Avenue West (36©) 493-2476 Fax Yejm, WA 98597 sca@scaconsultinggroup.corn www.thescagroup.com RE: Forrester Heights (Palisades West} Subdivision SUB 05.0458•YL bear Steve: ~ ~~~~~g$~~~ ~~~ ~~ -:_d ~~ ~~o ~~ ~~ .~- The following items have been acknowledged and addressed accordingly per your inspection iefter of August 17, 2007. Please proceed with approval of the final plat. Water 1. Hydrant locks have been purchased. 2. The booster pump station design has been submitted to the Gity for approvai. We have already requested final plat approval prior to having it operational and have received Ciiy permission to proceed. 3. Damaged meter box has been replaced. 4. The irrigation control box on Lot 21 has been relacated to mainkain 10' separation from sewer box. 5. Sewer box lid has been replaced on Lot 22. 6. Same as #4 on Lot 23. , 7. Same as #5 on Lot 7. 8. Same as #5 on Lot 13. 9. Sewer valve has been exposed on Lot 17. 10. Same as #4 on Lot 21. 11. Same as #5 on Lot 22. 12. Same as #4 on Lot 23. Civil 1. ADA ramp has been repaired. 2. Grade at back of walk an Lot 24 has been adjusted. Landscape 1. Storm pond and planter strips have been hydroseeded. 2. Debris has been removed. 3. Acknowledged. 4. Acknowledged. Please call if you have any ques~isn's.~~hank you. Very truly yours, FH1. LLC ~ SLCInt K:ITEXTV++Project Files++12005 PF1050171CorreslHarringtpn082907.tlgc DESIGN/GUILD CIVIL AND TRANSPORTATION ENGINEERING PLANNING SURVEYING