Response Ltr for DOH Comments arch 10, 2008 Subject: Forrester Heights -Water Booster Pump Station City of Yelm Water System ID #99350 Forrester Heights Boaster Pump Station ODW Project #07-1101 Dear r. Gibson: This letter is a response to the Forrester Heights Booster Pump Station review performed by the DOH Office of Drinking Water (ODW). a understand that the City of Yelm would like the opportunity to review and respond to this letter. The review letter from ODW, dated January 7, 2008, is attached. 1. Please clarify the operating sequence of the pumps. It would be a good idea to have the pumps alternate in lead/lag position. This will reduce wear on an individual pump and extend the pump life. Response: a operating sequence of the pumps has been clarified in the protect report. The three larger pumps wits alternate feaditag position to equalize run time an ail pumps. 2. OD recommends this system installs an autodial system that notifies the office or operator if an alarm is sounded at the booster station. The visual and auditory alarms onsite may not be noticed very quickly. Response: The plans and report have been updated to include the remote terminal unit to connect to the City of Yelm SCAQA system. 3. Please include a sample tap at the booster station, a common suction side pressure gauge, and check valves on the discharge side of the pumps. Response: Al- of the above are included in the plans and report. 4~. Please include a map showing the location of the pump station and the development being served with respect to the service area and the Urban Growth Area. 42Ut7 Gth Avenue SE, Srtfte 3C9 Lacey, lNA 98503 (360) 292-~23Q Fax (3G0! 292-7231 Seaftie Evereft Tacoma Lacey Portland Eugene San Francisco Saeraenenfo Los Angeles Pasadena Irvine San Diego Phoenix Denver Sf. Louis r. Jim Gibson March 10, 2008 Page 2 of 2 Response: We have i`ncfuded a map from the 2002 City of Yelm Water System Plan, in Appendix E of the Protect Report, which shows the location of the project in relation to the service area and the urban Gra h Area. 5. Based on a review of the City of Yelm's current Water System Plan (WSP} (approved in 2002}, ODW was not able to find where this booster station project was identified. Please clarify if this project was included in the 2002 WSP. WAC 246-290-110 (3} requires project reports submitted for approval must be addressed in the WSP. If it is not addressed in the WSP then additional requirements will apply, Response: a have added a paragraph to the report (page 1) with more detailed information from the 2002 after System Plan about where this type of project is addressed. We have also attached to this tatter the section of the 2002 WSP that clarifies the approval process for this type of protect. e appreciate yaur timely review to these revised plans so that this project can be completed as soon as possible. Thank you, and please give a or Clint Pierpoint a call, if you have any questions. Sincerely, g w -h~~~ Ben Enfield Design Engineer 406050.10 ,~~~ `sm~i~. h, Q~ a 4n '~, ~~ +~~, -:;~' ;fly "F 18F9 t' ~._.~~e~ C~~,-s~Fi~~~~S~f C~II~IEC@~~i~'t~I~S~E~ ~EGI~h~AL APE i B~~S ~~ ~~ ~i.~.3, ~3ip~rrsi~a, i•~~~k~es~~e~~a ?~~~~-7`fi.~.3 January 7, 2005 l~licholas Taylor FF Consulting Engineers 4'00 6th Avenue, Suite 309 Lacey, Washington 95503 Subject: City of Yelm Water System, ID #99350, Thurston County; Forrester Heights Booster Pump Station, (~D~'V Project #07-1101 Dear r, Taylor: The Qffice of Drinking Water (t~DW} has completed its review of the above project received on October 29, 2007. is project is for a new booster pump station that will serve approximately 24 single-family residential lots. The following comments must be addressed before I can complete my review. 1. Please clarify the operating sequence ofthe pumps. It would be a good idea to have the pumps alternate in lead/Iag position., This will reduce wear on an individual pump and extend the pump life. 2. ODW recd ends installation of an autodial system that notifies the office or operator if an alarm is sounded at the booster station. The visual and auditory alarms onsite may not be noticed very quiekly. 3. Please include a sample tap at the booster station, a common suctian side pressure gauge, and check valves on the discharge side of the pumps. 4. Please include a map showing the location of the pump station and the development being served with respect to the service area and Urban Carowth Area. 5. Based on a review of the City of Yelm's current Water System Plan (WSP) (approved in 2002), I was not able to find where this booster station project was identified, Please clarify if this project was included in the 2002 V~ISP. WAC 246-290-I 10 (3) requires project reports submitted for approval must e addressed in the WSP. If it is not addressed in the WSJ then additional requireanents will apply. ~rF Nicholas Taylor January '7, 2005 Page 2 12egnlations establishing a schedule of face for review of planning, engineering, and construction documents were adapted 3uly 1, 2004, (WAC 246-290-990. Axz itemized invoice for $1,206 is enclosed. if you have any questions please contact zne at (360.) 236-3035 ar by e-mail at regina.grim~a do.wa.gov, Enclosures cc: Edward Smith, Gity of Yelm Forrester Heights, LLC Jim Goode, Thurston County Health Department Linda l~ildahl, C}DW Bonnie Waybright, OD 'Nasbirrgtott Sfat~ Det+artmenP of f~h~isiou ~ Em~irvrnrtr,tal S1cvIHt C_?~rce of D; ir,R-itrg }Nrucr y~ TC~: EDW SMITH CITY OF YELM YELM, CITY OF I'O BOA 479 YELM A 98597 I~~'I'~ DFSC t'TIC~N 1 p 1 I $1206.00 Payment due within 30 days. Interest shall accrue at I°ro per month after 3o days. ake C ec s Paya Ie tai a art ent f ealth eturn Ln~v~r ~mrkia~>r~ to. Department of Health pC? 13ox 1099 Cllympia, wA 9&507-1099 ---------------~G-------------------------------------~-----------------------------------------~------------ Qffice of Drinking Water Engineering, Planning, and Sanitary SunTey Re~riew Form itiAME fM~OICE ANINBE ~ ~~`~ iNS~QICE DATS Ah10UN"~' y <. i~(?N Fnnt~ #'331-332 CQS'I' AM(?i7NT EtUx'It t0: Department of Health Revenue Section PQ B~7X 1(}99 Qlympia, WA 98507-1099 For persons with disabilities, this docuinel~t is available on request i~ other formats. To submit a request, please call 1-800-5?5-0127 ~TT~e~~en~~~o~~~il~~oo f~~~ ~~° ~i~ i~~g ~t~r ~~~~ ~n~il~eering, ~'lanning, and unitary ul-vey Re~jiew Fon7I 2 044229 00878 C TE 7 ~. L?ISTRIBUTIC) FACILITIES DESIGN D CO STRUCTIQN STA S INTRQDUGTION Design and construction standards are based on D©H design guidance and other documents generally accepted by engineering professionals as containing damental criteria for design and construction of water utility projects. The water system standards are at least as stringent as those discussed in WAC Chapter 246-29Q and do not deviate from department design guidance unless adequately justified. 1. FRQJECT RE W PROCED S 2. PQLICIES REQUIRE NTS FQ OUTS E P S e City has established policies and requirements for development 1 extension of the water system. by autside parties. Qutside parties or "developers" making alterations to the system will be required to abide by the policies and requirements included in the following documents. City of Yelm Development Guidelines City of Yelm and Thurston County Joint Growth llrianagement Plan City of Yelm 7-1 Comprehensive 2402 Water Plan City of Yelm t?rdinances: Chapter 13, Water and Sewer e above palicies include various requirements of system performance and development standards included but not limited to right of way, looping requirements, minimum fire flow requirements, Coordinated Water System Plans and level of service standards according to the growth management act. 3. DESIGN ST S (Performance Standards and Sizing Criteria) The hydraulic evaluation criteria are based on maintaining system pressure and velocity, as defined in the DOH WAC 246-290-230 and in (raup A Public kl'ater Systerrzs Waterwarks Standards. The following criteria were used to evaluate the distribution system. The future City distribution system shows the major line sizes required for meeting the performance standards. Water Line sizes for projects within the "skeleton" system will be deternuned on a case-by-case basis. 4. C®NSTIti1CTIQN ST S (Materials and Methods) The City's development standards specifically address the accepted materials and construction methods regarding the water system. ~s includes equipment and terial for: The City's development standards and details are included in the appendix. 5. CONS UCTION CER CATIQN ®LLQ- PACED S The City ensures that water system distribution projects are constructed in accordance with the water utility's construction dards by inspecting the construction, observing testing and collecting Bac-T test results. A DOH Construction leport for Public Water System Projects should be completed at the end of each water system project, These can be obtained from the DOH's regional engineer. City of Yel 7-2 Comprehensive 2002 Water Plan Construction recards are to be submitted at the end of the project. Currently the data is filed with . the Public Works Department. There is no procedure for updating the City system map in a -- systematic way, It is recommended that, prior to project co lesion and acceptance, the system. map be updated for future use in comprehensive water plan updates, City of Yelm %-3 Comprehensive 2002 Water Plan