The City of Yelm has completed the second review of the proposed subdivision. Your application
included:
Construction Documents dated Jan 10, 2007
Landscape Plan dated Jan 10, 2007
F~esubmittal Letter dated Jan 12, 2007
V1ie have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE
Stormwater anual and general standards of civil engineering practice. The following comments
need to e addressed before the plans may be approved for construction. Our comments are
summarized below:
~~~~ ~~s-~~~s
{~~~) ~t5s-~a~
u±u~tu.ca<vetrn.~c°tt. [t~
°I . An "End of Line dean ut'p is required at the end of this ainlin per C?Y Development
guidelines -See dra~ring ~-.
Street Li kiting Plan (18 oft ~:
11. ova light I~lo. from Station 1~-7 to feet inside the property line. This change needs to
be made due to the relocation of the cul-de-sac.
Irrigation Ian;
~. lrrigafiion is required for areas that can not e reached with a 75' hose bib reach from the
houses. ~fhis irrigation can be sprinkler system, drip irrigation or other means as long as it is
approved by ity. Please add irrigation stars as needed.