Loading...
05-0458 Review letter no 2 Signed 020207.doc1=ebruary 2, 2007 ark Steepy 6CPF Consulting Engineers 4200 Otn Ave SE Suite 309 Lacey, U19A 98503 City of Yelm Q L,G LJ~lf) ~Ytt E (x1't eYtt C?5` Y~lu~ Aue.ue ~~t ~'.t~..Bo x'79 Yelrrc, WA ,9&597 F~arrester eig is se 1 - - 5- 45 -YL econ evie caf ~iuil Site ~o structio cacu eats r. Steepy: The City of Yelm has completed the second review of the proposed subdivision. Your application included: Construction Documents dated Jan 10, 2007 Landscape Plan dated Jan 10, 2007 F~esubmittal Letter dated Jan 12, 2007 V1ie have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater anual and general standards of civil engineering practice. The following comments need to e addressed before the plans may be approved for construction. Our comments are summarized below: ~~~~ ~~s-~~~s {~~~) ~t5s-~a~ u±u~tu.ca<vetrn.~c°tt. [t~ °I . An "End of Line dean ut'p is required at the end of this ainlin per C?Y Development guidelines -See dra~ring ~-. Street Li kiting Plan (18 oft ~: 11. ova light I~lo. from Station 1~-7 to feet inside the property line. This change needs to be made due to the relocation of the cul-de-sac. Irrigation Ian; ~. lrrigafiion is required for areas that can not e reached with a 75' hose bib reach from the houses. ~fhis irrigation can be sprinkler system, drip irrigation or other means as long as it is approved by ity. Please add irrigation stars as needed. ~earua~ ~, zoos Page 2 of 2