Loading...
05-0017 Water Review no 2 040207 From: Edward Smith Sent: Monday, April 02, 2007 1:27 PM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Plan Review, Public Works.doc Burnett Commerical Park Phase 2 Plan Review #2 ????????? City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date: 2/ April /2007                                                   Page  1  1  of   1     Location:                    Department:  Water   Contractor:                                                      Rep:   1.         The developer is responsible for the cost of the fire hydrant locks and the City of Yelm will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrants locks. 2.         Note one has the main stubbed out, but there is not a Double Check Valve Assembly, FDC and PIV installed there from phase one. 3.         Can the water meter tap go on the existing stub out, that was for the fire sprinkler system? This would save a road cut. 4.         These buildings will be required to have a back flow device’s after the water meters.                 Reviewed by:    John I, Edward Smith, Kevin R. Signed by:         Edward Smith