Loading...
05-0017 Water Review No. 3 051807 From: Edward Smith Sent: Friday, May 18, 2007 11:53 AM To: Tim Peterson Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington Subject: Burnett Commerical Park Plan Review #3 Public Works.doc Burnett Commercial Park Phase 2 City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date:   18/May/2007                                                                          Page  1    of   1     Location: Burnett Commercial Park Phase 2 #3                                                                                          Department:  Water   Contractor:                                                                                           Rep: 1.         The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2.         Explain notes 10 and 11 or draw the line from the water main to the assembly’s. 3.         Are they going to use note 9?     Reviewed by:  Edward Smith Signed by:    Edward Smith