Loading...
Transmittal 02-07-07 001_- -- _- - - -~ __ _ ~' Transportation EngineeringNorthWest, LLC TRANSMITTAL Transportation Engineering/Opera[ions ~ Impact Studies ~ Design ~ Transportation Planning/Forecasting ~ LETTER Date: February 2, 2007 To: Tami Merriman City of Yelm 105 Yelm Avenue W Yelm, WA 98597 From: Jeff Schramm, TENW ^ Urgent X For Submittal Regat'ding: Burnett Commercial Park Phase 2 -Updated Traffic Analysis Tami, I hacc enclosed _7 copies of the L`pdated "1'xaffie Lnpac[Analy~s-is for Phase 3 of the Burnett Commexdal Park and a Cll with the LOS files One cope includes' [he rnrixe appendices and the orhex does not 1 hacc also mailed a full cope with appendices [o Candace Crame[' at Shea & Carr. Thanks, icff e Candace Ceamer (1 copy with appendices) Shea & Cara Inc. 3434 Hcxiragc Coutt SW, Swim 301 Ohmpia, U/;A 98502 e Sret-e Chamberlain (1 copy-mirhon[ appendices) 'lhc SC.1 Group 4200 C'" dre, Suire 301 l.acc~, W.A 98503 c Rob Holcomb (1 wpc wiihuut appatdicc+) IiPIT Coneuhing I~:ngincers 4300 C`" :Ace, Suim 309 ]acct-, W;A 98503 RECEIVED FEB 07 2117 Transportation Engineering North West LLC 816-6°i S[ree[ South ~ Kirkland, WA 98033 Offce az Mobile (206) 396-8286 r Fax (425) 8898369