20190259 2707EngineeringPlansSTRUCTURAL NOTES
NOTE: Contractor is responsible for aligning solid
/
blocking/posts directly below all imposing point load locations
CONTRACTOR, OWNER, AND FRAMER ARE TO
THOROUGHLY REVIEW THESE DOCUMENTS AND THEIR
above at floor framing. Where additional posts are called out at
beam lines the Contractor is responsible for installing matching
solid blocking/posts between the top of the floor beam and the
RELATIONSHIP TO THE ARCHITECTURAL PLANS- IF
underside of the floor sheathing at the load locations above.
CAUTION
THERE ARE ANY QUESTIONS, OR DISCREPANCIES
.XGX I OX 10 W.W.M.F. or
ABOUT THE NOTES, DETAILS, OR PLANS, CONTACT
PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS. BRACE PER
RECOMMENDATIONS.
THE ENGINEER OF RECORD AT THOMPSON
RIM BOARD
ENGINEERING (360) 918-8079.
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING PLACEMENT OF TRUSSES.
These structural notes supplement the drawings. Any discrepancy
found among the drawings, these notes, and the site conditions
11 b rted to the Engineer who shall correct such
CONTRACTOR IS REQUIRED TO FIELD VERIFY ALL CONDITIONS AND ALL
ELEVATIONS.
sha e repo
discrepancy in writing. Any work done by the Contractor after
discovery of such discrepancy shall be done at the Contractor's
risk. The Contractor shall verify and coordinate the dimensions
among all drawings prior to proceeding with any work or
fabrication. The Contractor is responsible for all bracing and
shoring during construction. All construction shall conform to the
applicable portions of the latest edition of the 2015 International
Building Code except where noted.
Construction Stability:
The design, adequacy and safety of erection bracing, shoring
and all temporary supports is the sole responsibility of the
Contractor, and has not been considered by the Engineer of
Record. The Contractor shall provide the bracing necessary to
provide stability to the structure prior to the completed
application of the lateral resisting system. During
construction, the Contractor shall keep loads within the
design roof and floor load limits indicated below.
Design Criteria:
1. Live Load = 25 PSF (Snow)
40 PSF (Floors)
2. Dead Load = 15 PSF (Roofs)
12 PSF (Floors)
10 PSF (Partition Load)
10 PSF (Wood Walls)
150 PCF (Concrete)
3. Wind : 2015 IBC
a. Basic wind speed = 110 mph
b. Ultimate design wind speed = 85 mph (3 -sec gust)
C. Risk category = "II"
d. Exposure category = "B"
e. Internal pressure coefficient = +0.55/-0.55
4. Earthquake: 2015 IBC
a. Risk category = II
b. Importance factor "I" = 1.0
c. Spectral response acceleration parameter Ss = 1.327
d. Spectral response acceleration parameter S1 = 0.545
e. Site classification = "D"
f. Spectral response acceleration parameter Sds = 0.885
g. Spectral response acceleration parameter Shc = 0.545
h. Seismic design category "D2"
i. Seismic response coefficient CS = 0.127
j. Response modification factor = 6.5
k. Basic force resisting system = bearing walls -"K"
1. Design procedure = Simplified analysis
5. Soil = 1500 PSF, Assumed Bearing Capacity
Foundation
1. All footings shall be founded on native undisturbed soil.
2. Optional: A continuous 4" diameter perforated footing
drain shall be placed around the entire perimeter of the
foundation and installed as shown on the drawings. The
footing drain shall be sloped and terminated at an
approved location down hill of the structure.
3. Pressure -treated Mud -sills: Use 1/2" diameter X 10" ASTM
A307 anchor bolts at 72" on center with pressure treated
2x nominal thickness plates, unless otherwise noted on
the foundation plan.
4. All anchor bolts shall use 3" square x 1/4" thick steel
plate washers.
5. Contractor may step foundation footings, but shall not
step foundation walls short of floor diaphragm unless
otherwise noted/detailed on the foundation plan.
NOTE:
WITH THE EXCEPTION OF APPROPRIATE BRACING MEASURES, DO NOT BACKFILL
AGAINST CONCRETE WALLS FOR A MINIMUM OF 14 DAYS AND ONLY AFTER THE
CONCRETE SLAB FLOOR IS IN PLACE, FLOOR FRAMING SYSTEM IS INSTALLED,
SHEATHED, AND COMPLETELY NAILED OFF!
(2) 1 Gd'5 @ I G" O.C.
MANUFACTURED RIM BOARD
EDGE NAILING
FLOOR JOISTS
\ II{
/
(2) 1 Gd'5 @ I G" O.C.
(2) 8d'5 @EACH JOIST'
EXTERIOR WALL FRAMING
W/ 3x3x I /4" PLATE WA511-1ER TYP•
GL8
2 P.T. SILL PLATE
.XGX I OX 10 W.W.M.F. or
Lr MP'VAT-ED Vi'�-ctR
EDGE NAILING
EDGE NAILING
MANUFACTURED
RIM BOARD
-
FLOOR J015 T 5
(OWN'; R5 OPTION)
EDGE NAILING
J
FINISHED GRADE VV/
(SEE PLAN)
'ST
5% 51 -OPE AWAY
I
HDR
-HEADER
2x6 P.T. 51LL PLATE���
FOUNDATION VENTS;
P R E SSUR_ T REATE D
W/ A.5.5 PER PLAN
o
� '
- BEAD,?
W/ 3x3x 114" PLATE WA511ER TYP.
- -
( I ) #4 BAR CONT.
#4 5AR5 CONT.
#4 15AR5 CONT.
W/ 24" LAPS
(1) BELOW VENT5 -�,
I
-1 r
( 1) BELOW VENTS:
FOUNDATION VENTS
,
m
(1) @ MID -HT.
(PER CODE) 1/ 150
I
,, a
4" 0 PERFORAT ED
4 VERTS @ 32 O.C.
f
'k
FOOTING DRAINS
(I) #4 BAR CONT.
#4 BARS CONT.
NATIVE UND15TU1,?,5ED
W/ 24" LAP5
(1) BELOW VENT5
-
501 L
-
12"
(1) @ MID -HT. -
FOUNDATION /
FLOOR SECTION
DETAIL
NATIVE UND15TUR15ED
G"
501L
4" O PERFORATED
1 2"
FOUNDATION
/ SLAB
SECTION DETAIL
FOOTING DRAINS
-
8„
-
NATIVE UNDI5TURBED
SOIL
15"
FOUNDATION
/ FLOOR SECTION
DETAIL
a. Risk category = II
b. Importance factor "I" = 1.0
c. Spectral response acceleration parameter Ss = 1.327
d. Spectral response acceleration parameter S1 = 0.545
e. Site classification = "D"
f. Spectral response acceleration parameter Sds = 0.885
g. Spectral response acceleration parameter Shc = 0.545
h. Seismic design category "D2"
i. Seismic response coefficient CS = 0.127
j. Response modification factor = 6.5
k. Basic force resisting system = bearing walls -"K"
1. Design procedure = Simplified analysis
5. Soil = 1500 PSF, Assumed Bearing Capacity
Foundation
1. All footings shall be founded on native undisturbed soil.
2. Optional: A continuous 4" diameter perforated footing
drain shall be placed around the entire perimeter of the
foundation and installed as shown on the drawings. The
footing drain shall be sloped and terminated at an
approved location down hill of the structure.
3. Pressure -treated Mud -sills: Use 1/2" diameter X 10" ASTM
A307 anchor bolts at 72" on center with pressure treated
2x nominal thickness plates, unless otherwise noted on
the foundation plan.
4. All anchor bolts shall use 3" square x 1/4" thick steel
plate washers.
5. Contractor may step foundation footings, but shall not
step foundation walls short of floor diaphragm unless
otherwise noted/detailed on the foundation plan.
NOTE:
WITH THE EXCEPTION OF APPROPRIATE BRACING MEASURES, DO NOT BACKFILL
AGAINST CONCRETE WALLS FOR A MINIMUM OF 14 DAYS AND ONLY AFTER THE
CONCRETE SLAB FLOOR IS IN PLACE, FLOOR FRAMING SYSTEM IS INSTALLED,
SHEATHED, AND COMPLETELY NAILED OFF!
(2) 1 Gd'5 @ I G" O.C.
MANUFACTURED RIM BOARD
EDGE NAILING
FLOOR JOISTS
\ II{
/
W/ A.5.5 PER PLAN
(5EE PLAN)
EXTERIOR WALL FRAMING
W/ 3x3x I /4" PLATE WA511-1ER TYP•
GL8
2 P.T. SILL PLATE
.XGX I OX 10 W.W.M.F. or
Lr MP'VAT-ED Vi'�-ctR
EDGE NAILING
EDGE NAILING
W/ A. 5.5 PER PLAN
EACH
(OWN'; R5 OPTION)
W/ 3x3x 114" PLATE WASHER TYP.
FINISHED GRADE VV/
'ST
5% 51 -OPE AWAY
I
HDR
-HEADER
F T G
FOUNDATION VENTS;
P R E SSUR_ T REATE D
#4 VERTB @ 48" O.C.
(PER CODE) I / 150
� '
- BEAD,?
( I ) #4 BAR CONT.
#4 5AR5 CONT.
#4 15AR5 CONT.
W/ 24" LAPS
(1) BELOW VENT5 -�,
I
a e ii
( 1) BELOW VENTS:
,
(1) @ MID -HT. I)
(1) @ MID -HT.
4" 0 PERFORAT ED
FOOTING DRAINS
l
-1
NATIVE UND15TU1,?,5ED
G"
501 L
12"
FOUNDATION /
FLOOR SECTION
DETAIL
SHORING, BRACING, AND COMPACTION DURING THE BACKFILL PROCESS IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR!
Concrete & Reinforcing Steel:
1. All concrete work shall be per the 2015 IBC Chapter 19.
Tolerances shall be per IBC Chapter 19, Section 07.
Mixing, placement, and inspection shall be per Sections
03, 04, 05, and 06.
2. Cement: ASTM C150, normal -Type I or I-II.
3. Coarse or fine aggregate: ASTM C33.
4. All reinforcing shall be ASTM A615 Grade 40 for #4 bars
or smaller and Grade 60 for #5 bars or larger.
5. Use 24" elbow bars at all footing and stemwall corners
and intersections at horizontal continuous reinforcement.
6. Admixtures: Water reducers -ASTM C494, Type A. Air
entrainment -ASTM C260 and ASTM C494, with no chlorides.
7. Concrete shall be in accordance with ASTM 150. Do not use
calcium chloride, fly ash or related materials.
f'c = 2500 PSI @ 28 day -5-1/2 sack mix -3/4" maximum size
aggregate. Slump = 5" maximum, 6% max Air entrained.
Carpentry:
1. Structural 4X framing shall be #2 Doug -Fir.
2. 6X columns/beams/headers shall be #1 Doug -Fir.
3. 2X rafters/joists shall be #2 Douglas -fir, kiln dried,
and stored in a dry area prior to installation.
4. Roof/Floor joists/trusses shall be by Trus -joist, Boise
Cascade, Louisiana Pacific, or other approved
manufacturer.
S. Roof trusses shall be by a pre -approved manufacturer and
constructed according to the specifications of the Truss
Plate Institute. Contractor and Truss Manufacturer are
responsible for all bracing of the trusses including end
wall bracing and all other bracing between the building
and the trusses unless specifically shown otherwise on
the drawings. Girder trusses shall have a minimum of
bearing studs equal to the number of plies of girder
truss. All girder trusses shall have LGT ties each end
of truss that matches the number of plies in truss unless
otherwise noted in plans or truss package.
6. Manufactured beams/columns (PSL/LVL) shall have the
following properties:
(Fb = 2,800 psi)
(Fv = 285 psi)
(E = 2,000,000 psi)
(Fcl = 650 psi)
7. Glue laminated beams shall be 24F -V4 for simple spans,
and 24F -V8 for cantilevered or continuous beams and have
the following properties:
(Fb = 2,400 psi)
(Fv = 240 psi)
(E = 1,800,000 psi)
(Fcl = 650 psi)
8. Continuous and cantilevered beams shall not be cambered.
All other Glu -laminated beams shall be cambered for
L/480. See framing plans for any exceptions.
9. Floor sheathing shall be 39" T&G. Sheathing at floors
shall be laid with the face grain perpendicular to
supports and end joints staggered 4'-0" on center.
Provide 1/8" space between panel edges as required by
sheathing manufacturer's specifications. Floor sheathing
shall be nailed with 10d box nails at 6" o.c. edges and
10" o.c. in the field unless otherwise noted on the
drawings.
10. Sheathing at roofs shall be laid with face grain
perpendicular to supports and end joints staggered 4'-0"
on center. Provide 1/8" space between panel edges as
required by sheathing Manufacturer's. Roof sheathinc
shall be nailed with 8d box nails at 6" o.c. edges anc
12" o.c. in the field unless otherwise noted on the
drawings.
2xG P.T. SILL PLATE
W/ A.5.5 PER PLAN
UNLESS OTHER` it i SE NOTED
EXTERIOR WALL FRAMING
W/ 3x3x I /4" PLATE WA511-1ER TYP•
GL8
5EE BUILDING SECTIONS
.XGX I OX 10 W.W.M.F. or
Lr MP'VAT-ED Vi'�-ctR
EDGE NAILING
EDGE NAILING
FI6 R MEBH
EACH
(OWN'; R5 OPTION)
ixrtir
FINISHED GRADE VV/
'ST
5% 51 -OPE AWAY
I
HDR
-HEADER
F T G
- FOOTING
P R E SSUR_ T REATE D
8},
- BEAD,?
#4 VERT5 @ 48" O.C.
#4 15AR5 CONT.
-
(1) #4 BAR CONT.
( 1) BELOW VENTS:
,
W/ 24" LAPS
(1) @ MID -HT.
I.
, 4" O PERFORATED
_ FOOTING DRAINS
NATIVE UND15TUR15ED
G"
501L
1 2"
FOUNDATION
/ SLAB
SECTION DETAIL
P.T. POST VVI FC5T BASE
PFR, PLAN
"OPTIONAL"#3 TIES @ 3" O.C.
-
j-- FINISNED GRADE OR
1 2"O "50NO'
CONS BLAB
TUBE PLIN T `'i
-=
3"
VE UNDi5TURBED I
i 1s
1 II
I
I
F
I
Z;
rr-
ti t....,
�l
U
low
>r N
L.>
i 4
lriL4,af2" AA
i)
I � 1
I i
I �
ATTENTION:
49 �t
ZTRUCTURAL DETAIL
DI ON THIS SHEET.
I- (
�'�1 Iii='
OI
FOUNDATION/MAIN FLOOR FRAMING PLAN
ALL ENGINEERING CALLOUTS ON THESE PLANS
MUST BE STRICTLY FOLLOWED! NO EXCEPTIONS!
ANY CHANGES OR MODIFICATIONS MUST BE PRE -
APPROVED BY THE ENGINEERI OF RECORD!
!' BBREV � ONS.
U.O.N.
UNLESS OTHER` it i SE NOTED
GL8
GLU-LAM, SEt,%1A
LVL
Lr MP'VAT-ED Vi'�-ctR
D5L
D0USLE
EACH
ixrtir
'ST
- JOIST
HDR
-HEADER
F T G
- FOOTING
P R E SSUR_ T REATE D
8},
- BEAD,?
THOMPSON ENGINEERING, INC. T140
8270 28TH COURT STE. 201 LACEY WA 98516 ��' 0�
� � Q. of easy A
PHONE: (360) 918-8079 email: fthompsonengineering@yahoo.com � ��A�� ��o� p
SCALE: DRAWN BY:
DATE: PROJECT #19-097 REVISED:
Ix
RON DEERING HOMES -RESIDENTIAL PLAN 2707' Rj471Eo
�rONpL
DRAWING NUMBER:
FOUNDATION PLAN, NOTES & DETAILS ISHEET Sl OF 3
OPTIONAL 11-2.5 PLACEMENT @ 32" O.C.
TOP OF TKU55 / BLKG t SIDE OF STUD
SIMPSON LU2 1-2.5 PLACEMENT @ 48" O.C. - TKU55 TO BLKG.
HANGERS (SLOT SHEAT RING TO PASS)
EA. END OF 2x6
BLKG.
HANGER5 DY TKU55 MFGR.
EDGE NAILING TO
2x VENTED ELKS.
a
H- I CLIPS @21 " O.C.
DRG / SHEAR WALL
ROOF FRAMING DETAIL
DRG / SNEAK WALL
UPPER WALL - LOW ROOF SHEAR TRANSFER - MONO TRUSS 3/4" = 1'-U"
EQUAL
SIMPSON STRAP
SEE PLAN FOR
SIZE $ LOCATION
6d NAILS @
EACH HOLE
WALL FRAMING or
BEAM - SEE PLAN
STRAPPING DETAIL
EQUAL
DRAG TRU55 —
ADJACENT S.W.
�pC " LONG 2x NAILER TO
SIDE OF TKU55
BOTTOM CHORD - (2) ROWS
I Gd SINKERS @ " O.C.
EA. STAGGERED ROW
SHEAR WALL STRAP - WALL TO TRUSS - NAILER BLK 3/4" = 1'-0"
JOISTS
A-35 CLIPS @ � O.
RI M TO WALL
EDGE NAILIN
I
_-„ ,-1 UPPER FLOOR FRAMING DETAIL
J55 - 5EE PLAN
�d'5 @" O.C.
I (-�ROOF - SHEAR WALL CONNECTION 3/4" = 1'-0"
A-34 CLIP EA. RAFTER
OVER FPAMING 2,6 NAILEP, PLT.
KAF T ERS i w/ (4) 1 Gd'_ PER
t i RAFTER
OVER -FRAMED RAFTERS:
10' SPAN or LESS = 2x4'5 @ 24" O.C.
OVER I O' SPAN TO 1 2'-G" SPANS = (2) 2xG'5 @ 24" O.C.
OVER 1 2'-G" SPAN TO 1 4'-G" SPANS = (3) 2xG'5 @ 24" O.C.
OPTION: #2 D.P. 2x 1 2'5 MAY.. SPAN = I ?'-G"
ROOF FRAMING DETAIL
'4" O.C.
OVER FRAMING RAFTERS - ROOF CONNECTION 3/4''
TYPICAL AT ALL EXTERIOR
WALLS UNLESS OTHERWISE NOTED!
(8>) 10 d'5 EA.
51DE OF 5PLICE
N
8d box
N
N
TOP VIEW
4" 4" 4" TYP
I i I I
16d sinker
SIDE VIEW
�� u
NOTE: L,-0 MINIMUM BETWEEN 5PLICE5
IN FLOOR FRAMING DETAIL
4TYP1ICALL TOP PLATE SPLICE
D
UPPER SHEAR 1
(2) 1 Gd'5 @ I G'
TO RIM JOIST S
(2) 6d NAILS
PER JOIST
LOWER 5HE/
UPPER FLOOR FRAMING DETAIL
--Td" ►..AT" TT"T 1F%fNA1TXT - -- ,. i _i n I
EDGE NAILING
FLOOR - SHEAR WALL CONNECTION 3/4" = 1'-0"
IJI nLU(_r\IN(_
3/4" TSG 5HEATHING
EDGE NAIL
5HEAKWA'
UPPER FLOOR FRAMING DETAIL
FLOOR BLOCKING - SHEAR WALL CONNECTION 3/4" = 1'-0"
o'O
.K JOI
)E OF
TYPICAL SHEAR -WALL NOTES HOLDOWN SCHEDULE
All wall sheathing shall be 15/32" CDX plywood, 7/16" OSB, or as Hold-downs shall be Simpson "Strong Tie" and shall be installed
called out below, with exterior exposure glue and span rated "SR per the manufacture's recommendation. Equivalent holdowns by
24/0" or better. (5/8" T1-11 siding is an acceptable United Steel Products Company "Kant -Sag" that have ICBG approval
substitution except where 5/8" or thicker sheathing is may be substituted in lieu of Simpson holdowns. All floor
specifically called out in the schedule below). Sheathing may be systems shall be blocked below member that holdowns are attached
installed either horizontally or vertically. Wall studs must be
spaced at 16" on center. to. This block shall be equal to or larger than the member the
holdown is attached to and be placed as a "squash block".
All nails shall be per table below. Nail size and spacing at
all sheathing edges shall be as required in shear -wall schedule All double OR triple studs (ALLOWED PER HOLDOWN SCHEDULE BELOW)
below. shall be nailed together with (2) rows 10d's staggered at 4" on
center each row for each layer.
Nail Type
Diameter (inches)
Length (inches)
8d box
0.113
2-1/2
lOd box
0.128
3
16d sinker
0.148
3-1/4
8d common
0.131
2-1/2
10d common
0.148
3
HTT4 attaches to concrete foundation with a Simpson SSTABI6 bolt
12" minimum into concrete. HTT4 attaches to double 2X
studs with (18) 16d SINKER nails in wall above.
Capacity = 4235# DF/SP, 3640# SPF/HF
LSTHD8/LSTHD8RJ--embeds a minimum of 8 inches into concrete
ALL SHEARWALL FRAMING LUMBER SHALL BE DOUG -FIR SPECIES MATERIAL. foundation and to a 4X6 stud with (20) 16d sinker
nails in wall above.
SHEAR -WALL SCHEDULE
V\ 6 sheathing nailed with 8d box at 6" on center all edges
\ = 260 plf.
ADDITIONAL SHEAR WALL NOTES:
* Blocking is required at all horizontal free -edges of
sheathing. Sheathing edge nailing is required at all
holdown posts.
* Intermediate framing is to be minimum 2x members with
nailing at 12" on center.
* Double 2x studs nailed together with (2) rows of 10d's
at 4"o.c. may be used in place of a single 3x stud,
unless otherwise required in holdown schedule below.
UPPER FLOOR FRAMING PLAN
MAIN FLOOR SHEARWALLS & HOLDOWNS PLAN
IIII IIID III�II THOMPSON ENGINEERING, INC. Tho
8270 28TH COURT, STE. 201 LACEY, WA 98516 �-�' �'`I,o
PHONE: (360) 918-8079 email: rthompsonengineering@yahoo.com ,SO
�F �AS„`�oy o
SCALE: DRAWN BY: 4 = Z
ATTENTION: DATE: PROJECT919-097 REVISED:
ALL ENGINEERING CALLOUTS ON THESE PLANS R34471��.
MUST BE STRICTLY FOLLOWED! NO EXCEPTIONS! RON DEERING HOMES -RESIDENTIAL PLAN 2707 FSS; 1
ANY CHANGES OR MODIFICATIONS MUST BE PRE- DRAWING NUMBER:
APPROVED BY THE ENGINEERI OF RECORD! FRAMING/SW's & HD's PLAN, NOTES & DETAILS SHEET S2 OF 3
c2f 61-1 fzp0g/lAlA4_X_--'
cp
V
+
�12�11
14
it
b_
UPPER ROOF FRAMING PLAN
UPPER FLOOR SHEARWALLS & HOLDOWNS PLAN
TIKU55-1-5 @ 24" O.C.
51MF)5ON5TRAF
(HE FLAN FOP, 51ZE
ROOF SHEATHINGLOCATIONS
EDGE NAILING
KIM J5T.. \G
VENTED 2x DILI<
(2) 2x or 3x MEMDFIP, LLJ 51 M P50N
TYP. @ 5TKAF5 H- I CLIPS @ O.C.
(1) 2x STUD O.K. W/ 5KGSHEAR WALL
L5TA M5TA STRAPS or HAM SEE PLAN
STRAPPING DETAIL ROOF FRAMING DETAIL
HOLDDOWN STRAP BETWEEN FLOORS 3/4" 1'-0" PIZT
RUSS - WALL CONNECTION 3/4" = l'-0"
2X4 OUTLOOKS @ O.C. F,00f SHEATHING
(2) 1 Od!5 PER EDGE NAILING
I x2 TRIM
5IMP50N STRAP
(HE FLAN f OK 51ZE
LOCATIONS2x FLY RAFTER
MAX
—Icy J
RIM J5T. EDGE NAILING
GABLE TKU55 SHEATHING
:JOINT TO OVERLAP TOP
PLATES 1-1/2" MINIMUM
FLOOR MEMBER51MP50N A-35 CLIPS @ O.C.
SEE PLAN NOTE: ONLY FOR GABLE SHEATHING
THAT DOES NOT OVERLAP AND EDGE NAIL TOt
WALL PLATES
&STRAPPING
DETAIL ROOF FRAMING DETAIL
&PIEND TRUSS -WALL CONNECTION 3/4" 1'-0"
HOLIDDOWN STRAP TO RIM BEAM JOIST 3/4'' 1'-0"
1 0 1
THOMPSON ENGINEERING, INC. \1 T 11 0
8270 28TH COURT, STE. 201 LACEY, WA 98516 4fOV WAS41
PHONE: (360) 918-8079 email: rthompsonengineeringgyahoo.com
Cc, 0
SCALE:
I DRAWN BY: IT
ATTENTION: DATE: PROJECT #19-097 REVISED:
ALL ENGINEERING CALLOUTS ON THESE PLANS
34471
MUST BE STRICTLY FOLLOWED! NO EXCEPTIONS! RON DEERING HOMES -RESIDENTIAL PLAN 2707 1
101MIL
ANY CHANGES OR MODIFICATIONS MUST BE PRE- DRAWL
APPROVED BY THE ENGINEERI OF RECORD! ROOF FRAMING PLAN & DETAILS LSHE EWT V198 R'