eru caluclationsDaily Usage (gpd/student)
Annual Usage (gpd/student)
Average Daily Usage (gpd/student)
Existing Design Capacity (students)
Design Capcity (students)
Additional Daily Water Usage (gpd)
Additional Water ERU
Water Connection Fee
Sewer Usage (gpd)
Sewer ERU
Pre-purchased Sewer ERU's
Additional Sewer ERU
Sewer Connection Fee
14.47 Average from submitted by District
2,604.69 Daily Usage * 180 school days
7.14 Annual usage / 365 days
750
1,325
4,103 Additional students * average daily usage
17 Rounded down
$ 25,500.00
9,455 Design capacity *average daily usage
39.00 Rounded down
25.00
14.00
$ 73,766.00