Loading...
FW Please find the Wal-Mart Inspection Request with the correct datesIPM.Note FW: Please find the Wal-Mart Inspection Request with the correct dates FW: Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Please find the Wal-Mart Inspection Request with the correct dates Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH 'Alton Lewis'; 'rrantz@bird.ca'; 'astrofreak03@yahoo.com' Please find the Wal-Mart Inspection Request with the correct dates 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Just to let you know I did send out the request. _____ From: Steve Harrington Sent: Thursday, June 28, 2007 8:45 AM To: Edward Smith; Jon Yanasak; Nisha Box; Kevin Ray; Deonne Hardy Cc: Grant Beck; Gary Carlson; Jim Gibson; Tami Merriman; Tim Peterson Subject: Please find the Wal-Mart Inspection Request with the correct dates Sorry, I made a mistake on the dates. Please find the attached request with the correct dates. Thank you, Steve Harrington <DC90029353CCCD468AA2A2858FFCD8F528F80B@server1.ci.yelm.wa.us> FW%3A Please find the Wal-Mart Inspection Request with the correct dates.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Final construction inspection for the Wal-Mart Commercial Final construction inspection for the Wal-Mart Commercial 'Alton Lewis' SMTP alewis@bird.ca 'Alton Lewis' Alton Lewis alewis@bird.ca 'rrantz@bird.ca' SMTP rrantz@bird.ca 'rrantz@bird.ca' rrantz@bird.ca rrantz@bird.ca 'astrofreak03@yahoo.com' SMTP astrofreak03@yahoo.com 'astrofreak03@yahoo.com' astrofreak03@yahoo.com Final construction inspection for the Wal-Mart Commercial.doc WAL-MART We have been contacted to do a final construction inspection for the WAL-MART Commercial site located between SR 510 Loop and Old McKenna Rd. off SR 507. This will be the final construction inspection before the WAL-MART Project can be approved by City Council.  I would like to request the following information be directed to Steve Harrington and copy to Jim Gibson on the email.  Steve will be collecting the different punchlist and forwarding one complete list to the developer.  The following is a list of the needed inspections: Public Works:             Sewer Department - sewer system             Water Department - water system, cross control             Street Department - sidewalks and anything else they might notice Community Development Department             Landscaping – Nisha, the developer has requested that the hydroseed be done after all inspections of the irrigation system so it does not wash out any hydroseed.             All remaining items - Steve We would like to respond to the General Contractor with a list by July 6, 2007.  Could you please give your list to Steve by July 5, 2007 so he can compile them and send it out on the July 6, 2007. Thank you for your help.  We are trying to make sure no other items are missed during project closeout. Steve Harrington City of Yelm, Engineering Civil Inspector PO Box 479 Yelm,WA. 98597 Ph. 360.458.8423 Fx. 360.458.3144 steveh@ci.yelm.wa.us .doc Final construction inspection for the Wal-Mart Commercial.doc Final construction inspection for the Wal-Mart Commercial.doc