Final Punchlist - Civil and UtilitiesIPM.Note
Final Punchlist - Civil and Utilities
Steve Harrington
Grant Beck
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT
Final Punchlist - Civil and Utilities
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT
'Mike Beach'; 'alewis@bird.ca'; 'lcole@bcradesign.com'; Jim Gibson; Tami Merriman; Gary Carlson; Tim Peterson; Kevin Ray; Jon Yanasak; Steve Harrington
'allen.seay@wal-mart.com'
Final Punchlist - Civil and Utilities
Allen -
Attached please find the final civil, water, and sewer punchlist for the Yelm Wal-Mart. Please be sure to contact us when it looks like everything has been addressed for a final walk-through,
hopefully several days prior to the planned opening next week.
Grant
*******************************
Grant Beck, Director
City of Yelm
Community Development Department
P.O. Box 479
Yelm, WA 98597
360.458.8408
360.458.3144 (FAX)
grantb@ci.yelm.wa.us
<DC90029353CCCD468AA2A2858FFCD8F53296E2@server1.ci.yelm.wa.us>
Final Punchlist - Civil and Utilities.EML
Grant Beck
Grant Beck
11.0
664250301-11072007
05-0091 Punchlist Letter
05-0091 Punchlist Letter
'allen.seay@wal-mart.com'
SMTP
allen.seay@wal-mart.com
allen.seay@wal-mart.com
'allen.seay@wal-mart.com'
allen.seay@wal-mart.com
'Mike Beach'
SMTP
mbeach@pacland.com
Mike Beach
'Mike Beach'
Mike Beach
mbeach@pacland.com
'alewis@bird.ca'
SMTP
alewis@bird.ca
alewis@bird.ca
'alewis@bird.ca'
alewis@bird.ca
'lcole@bcradesign.com'
SMTP
lcole@bcradesign.com
lcole@bcradesign.com
'lcole@bcradesign.com'
lcole@bcradesign.com
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
Tami Merriman
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tami
tamim@ci.yelm.wa.us
tamim
Tami Merriman
Tami Merriman
TAMI
Gary Carlson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gary
garyc@ci.yelm.wa.us
gary
Gary Carlson
Gary Carlson
GARY
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
Public Works
Tim Peterson
Tim Peterson
tim
Kevin Ray
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin
kevin@ci.yelm.wa.us
kevin
Public Works
Kevin Ray
Kevin Ray
kevin
Jon Yanasak
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Jony
jony@ci.yelm.wa.us
jony
Public Works
Jon Yanasak
Jon Yanasak
jony
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
Steve Harrington
STEVEH
05-0091 Punchlist Letter.pdf
(360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 July 9, 2007 Allen Seay Wal-Mart Stores
2001 Southeast 10th Street Bentonville, AR 72716-0550 Dear Allen: The Community Development Department has been coordinating civil punch list items prior to your planned opening on July
18th. While I believe many of these items have been noted by either your contractor or engineer of record, I wanted to make sure everything is in one place for your ease of reference
as you prepare for your grand opening. The following issues need to be addressed prior to issuance of a certificate of occupancy for the Yelm Wal-Mart. SEWER ?? At station 117+00 a concrete
pad is needed on the valve box. This pad should be 6” thick by 24” square. ?? The Air Release Assemblies at station 11+00 needs an insulated lid, screws in the lid and toning wire. ??
The Air Release Assembly at station +70 needs an insulated lid, screws in the lid and a traffic bearing ring and cover. ?? The End of Line Clean-Out at station 130 +10 needs to have
the blow-off and toning wire brought up as high as possible and the lid needs to be labeled “Sewer” not “Water” ?? At station 167+25 (Yelm Avenue East) the End of Line Clean Out (including
the toning wire) needs to be extended up as high as possible. Rocks need to be removed from this stand pipe and a 3’-4’ valve extension added to the valve. ?? At station 53+00 the gate
valve stand-pipe seems to be separated and the valve nut cannot be accessed. This needs to be corrected. ?? The power disconnect must be drilled to allow the use of a City of Yelm pad
lock when the disconnect is in the “ON” position. ?? The Pump Control Panel must be equipped with a surge arrester pursuant to City of Yelm specifications.
Page 2 of 3 ?? The Carson (valve) box at SR 507 (Yelm Avenue East) must be raised to finish grade. ?? The Public Works Department – Sewer Division must be supplied with test results
from a certified Man-Hole Vacuum tester for the testing done to the manholes on site. ?? All traffic bearing lids 30” or larger must be aluminum per City of Yelm Specifications. ?? Due
to the installation and lid size, the green lid from the ‘solids’ end of the STEP tank could not be removed. ?? The “J” Box in the STEP Tank must have the lid secured with stainless
steel Phillips head screws, rather than “square” drive screws. ?? A written tank warranty will be required. ?? The pump system installed is a “duplex” system (two pumps) but only one
“onoff” float was installed. A float for each pump is required. WATER ?? All on-site and off-site issues with the potable water infrastructure have been addressed. CIVIL ?? Improvements
to SR 507 and the SR 510 Yelm Loop must be inspected and approved by the Washington State Department of Transportation, including all paving, striping, and the traffic signal, which
must be operational before opening. ?? Improvements to 103rd Street must be inspected and approved by Thurston County. ?? The corner located at SR 507 and SR 510 Loop needs to be completed.
?? All plastic packaging needs to be removed from extruded domes. ?? The sidewalk on SR 507 from the guard rail to SR 510 Loop needs to be brought up to the concrete surface area. ??
The broken sidewalk panel adjacent to the tire and lube exit, marked with red spray paint, must be replaced. ?? The broken curb panel adjacent to the tire and lube exit, marked in red
spray paint, must be replaced. ?? All sidewalk areas need to be cleaned. ?? All street signage must be installed. ?? The remaining sections of the perimeter wall must be installed. ??
After the parking lot is striped, confirmation is required that the required number of parking stalls, including the ratio of compact stalls to regular stalls, have been
Page 3 of 3 installed and that the required emergency vehicle parking stall within 75 feet of door has been striped and signed. ?? All required landscaping must be installed. ?? The
bus shelter near the intersection of SR 507 and SR 510 must be installed and confirmation provided that the bus stop is ADA compliant. ?? The corner enhancement must be complete. ??
A financial guarantee must be in place for the maintenance of the stormwater system, perimeter and parking lot landscaping and the building must be in place. ?? The chain link fence
on SR 507 must be painted greet to match the street lights. DOCUMENTATION The following items are not required for the opening of the store, but within 45 days of the issuance of a certificate
of occupancy. ?? Water line and sewer line and STEP tank easements must be recorded, including a general access easement across the property to access the City owned improvements covered
by the easements. ?? Bill of Sale for all water and sewer system infrastructure to be dedicated to the City, including water mains, sewer trunk lines, and STEP tanks. ?? Dedication of
all water and sewer system infrastructure to be maintained by the City, including water mains, sewer trunk lines, and STEP tanks. ?? The stormwater maintenance and operations agreement
must be recorded. ?? As-built plans must be submitted to the Community Development Department. While City staff will continue to monitor your progress, it would be appropriate for you
to schedule a final inspection when you believe that all punch list items have been addressed, several days prior to your scheduled opening, if possible. Sincerely, Grant Beck, Director
Community Development Department c. Mike Beach, PACLAND Alton Lewis, Bird Construction Lori Cole, Architects BCRA
.pdf
05-009~1.PDF
05-0091 Punchlist Letter.pdf