Loading...
Here are the Outstanding Civil Punch List ItemsIPM.Note Here are the Outstanding Civil Punch List Items Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Here are the Outstanding Civil Punch List Items Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH 'Alton Lewis'; 'rrantz@bird.ca'; 'ray skinner' Here are the Outstanding Civil Punch List Items 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Please find attached punchlist. Hope this does it for ya. Let me know when all is complete and I will for the items to be re-inspected by the proper dept. Thanks, Steve Harrington Engineering / Civil Inspector <DC90029353CCCD468AA2A2858FFCD8F528F8CB@server1.ci.yelm.wa.us> Here are the Outstanding Civil Punch List Items.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007 Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007 'Alton Lewis' SMTP alewis@bird.ca 'Alton Lewis' Alton Lewis alewis@bird.ca 'rrantz@bird.ca' SMTP rrantz@bird.ca 'rrantz@bird.ca' rrantz@bird.ca rrantz@bird.ca 'ray skinner' SMTP rskinner@bird.ca 'ray skinner' ray skinner rskinner@bird.ca Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc August 13, 2007 The following are a few minor issues that need to be addressed and completed for the Yelm Wal-Mart. Sewer Onsite: The pump Lag-Float is operating both pumps at the same time. The lead float does nothing. This needs to be corrected. The aluminum lid on the pump end of the step tank is cracked and must be replaced. The green lids on the step tank must be secured down with stainless steel screws. Sewer Offsite: The gate valve box at the intersection of Grove Road and 100th must be cleaned out. Civil items: Near the east entrance form the guard rail to the first light pole, the grade on the back of sidewalk needs to be brought up to 1” and out 1’ of back of walk grade. Parking lot lamp that is on the ground behind the sound barrier wall at the end of the 510 loop and the west end of sound wall needs to be placed somewhere within the confines of Wal-Mart. Electrical cover on light pole # 14 – 240, at the west end of the parking lot near the intersection of 510 loop and State Route 507. .doc WAL-MA~1.DOC Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc