Punchlist for Wal-mart #1 Public Works docIPM.Note
Punchlist for Wal-mart #1 Public Works.doc
Steve Harrington
Edward Smith
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Punchlist for Wal-mart #1 Public Works.doc
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Edward Smith
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington; Grant Beck
Tim Peterson
Punchlist for Wal-mart #1 Public Works.doc
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
Wal-mart punchlist from the water department
_____
City of Yelm
Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 8/June/2007 Page
1
of
1
Location: Wal-mart Department: Water
Contractor: Wood & Sons Rep: Mike or Roland
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until
the City of Yelm has received the payment in full for the fire hydrant locks.
Wal-mart _on site
2. The fire hydrant at station 3 + 00 needs to be turned straight with the road.
3. The fire hydrant at station 5 + 50 needs to be turned straight with the road.
4. Need to vacuum out the two gate valve housings in the area of station 17 + 00. These are the fire hydrant and fire sprinkler systems gate valves.
5. At station 14 + 00, need to finish putting together the gate valve housing and vacuum it out. The landscaping is not done yet.
Wal-mart 0ff site
1. Straighten the fire hydrant to be inline with the side walk or the road. This is next to the tree storage area by 507.
2. Turn the fire hydrant so the storz’s is facing the parking lot. This is the hydrant east of the last entrance on 507.
3. The blow off at station 230 +15 is too low and needs a bigger box.
4. The irrigation meter box and double check valve assembly box needs to be fixed, the lids do not sit right, thy may be a trip hazard.
A. Need too make sure we have all the well removable reports.
B. The Bacterial test has been done.
C. Back flow test have been done
Punch list done by:
Signed by: Edward Smith
<DC90029353CCCD468AA2A2858FFCD8F50513D1@server1.ci.yelm.wa.us>
Punchlist for Wal-mart %231 Public Works.doc.EML
Edward Smith
Edward Smith
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
Public Works
Tim Peterson
Tim Peterson
tim
Deonne Hardy
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne
deonne@ci.yelm.wa.us
deonne
Deonne Hardy
Deonne Hardy
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
Jim Gibson
Jim Gibson
Kevin Ray
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin
kevin@ci.yelm.wa.us
kevin
Kevin Ray
Kevin Ray
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
Steve Harrington
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant
grantb@ci.yelm.wa.us
Grant Beck
Grant Beck
Grant Beck
image001.gif
.gif
image001.gif
image001.gif
image/gif
image001.gif@01C7A9D6.F5A5AE80
image002.gif
.gif
image002.gif
image002.gif
image/gif
image002.gif@01C7A9D6.F5A5AE80
image003.gif
.gif
image003.gif
image003.gif
image/gif
image003.gif@01C7A9D6.F5A5AE80
image004.gif
.gif
image004.gif
image004.gif
image/gif
image004.gif@01C7A9D6.F5A5AE80