Loading...
Punchlist for Wal-mart #1 Public Works docIPM.Note Punchlist for Wal-mart #1 Public Works.doc Steve Harrington Edward Smith Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Punchlist for Wal-mart #1 Public Works.doc EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington; Grant Beck Tim Peterson Punchlist for Wal-mart #1 Public Works.doc 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server Wal-mart punchlist from the water department _____ City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Public Works Inspection Report Date: 8/June/2007 Page 1 of 1 Location: Wal-mart Department: Water Contractor: Wood & Sons Rep: Mike or Roland 1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. Wal-mart _on site 2. The fire hydrant at station 3 + 00 needs to be turned straight with the road. 3. The fire hydrant at station 5 + 50 needs to be turned straight with the road. 4. Need to vacuum out the two gate valve housings in the area of station 17 + 00. These are the fire hydrant and fire sprinkler systems gate valves. 5. At station 14 + 00, need to finish putting together the gate valve housing and vacuum it out. The landscaping is not done yet. Wal-mart 0ff site 1. Straighten the fire hydrant to be inline with the side walk or the road. This is next to the tree storage area by 507. 2. Turn the fire hydrant so the storz’s is facing the parking lot. This is the hydrant east of the last entrance on 507. 3. The blow off at station 230 +15 is too low and needs a bigger box. 4. The irrigation meter box and double check valve assembly box needs to be fixed, the lids do not sit right, thy may be a trip hazard. A. Need too make sure we have all the well removable reports. B. The Bacterial test has been done. C. Back flow test have been done Punch list done by: Signed by: Edward Smith <DC90029353CCCD468AA2A2858FFCD8F50513D1@server1.ci.yelm.wa.us> Punchlist for Wal-mart %231 Public Works.doc.EML Edward Smith Edward Smith 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim Public Works Tim Peterson Tim Peterson tim Deonne Hardy EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne deonne@ci.yelm.wa.us deonne Deonne Hardy Deonne Hardy Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg Jim Gibson Jim Gibson Kevin Ray EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin kevin@ci.yelm.wa.us kevin Kevin Ray Kevin Ray Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh Steve Harrington Steve Harrington Grant Beck EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant grantb@ci.yelm.wa.us Grant Beck Grant Beck Grant Beck image001.gif .gif image001.gif image001.gif image/gif image001.gif@01C7A9D6.F5A5AE80 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C7A9D6.F5A5AE80 image003.gif .gif image003.gif image003.gif image/gif image003.gif@01C7A9D6.F5A5AE80 image004.gif .gif image004.gif image004.gif image/gif image004.gif@01C7A9D6.F5A5AE80