Loading...
RE State Route 510 Extension and Connection to 103rd (2)IPM.Note RE: State Route 510 Extension and Connection to 103rd RE: Steve Harrington Mike Beach Steve Harrington SMTP mbeach@pacland.com State Route 510 Extension and Connection to 103rd EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Microsoft Mail Internet Headers Version 2.0 Received: from psmtp.com ([64.18.0.119]) by server1.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.3959); Tue, 23 Sep 2008 08:03:01 -0700 Received: from source ([66.162.141.202]) by exprod5mx233.postini.com ([64.18.4.10]) with SMTP; Tue, 23 Sep 2008 07:58:28 PDT Content-class: urn:content-classes:message MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----_=_NextPart_001_01C91D8C.D5E5DFC8" Subject: RE: State Route 510 Extension and Connection to 103rd X-MimeOLE: Produced By Microsoft Exchange V6.5 Date: Tue, 23 Sep 2008 07:58:27 -0700 Message-ID: <0F31CAB046FF094C8452BD677F563E9BD95EBD@MAIL.PacificLandDesign.com> In-Reply-To: <0F31CAB046FF094C8452BD677F563E9BD95E4A@MAIL.PacificLandDesign.com> X-MS-Has-Attach: X-MS-TNEF-Correlator: Thread-Topic: State Route 510 Extension and Connection to 103rd thread-index: Acj5exqzcIq9jL4FQcirDFUvuKBkUQAAFz+wAAQGd7AH1dtvsAEqZohA References: <0F31CAB046FF094C8452BD677F563E9BD95AF3@MAIL.PacificLandDesign.com> <DC90029353CCCD468AA2A2858FFCD8F57E8131@server1.ci.yelm.wa.us> <0F31CAB046FF094C8452BD677F563E9BD95E4A@MAIL.PacificLand esign.com> From: "Mike Beach" <mbeach@pacland.com> To: "Steve Harrington" <steveh@ci.yelm.wa.us>, "Grant Beck" <grantb@ci.yelm.wa.us> X-pstn-neptune: 0/0/0.00/0 X-pstn-levels: (S:99.90000/99.90000 CV:99.9999 R:95.9108 P:95.9108 M:97.0282 C:98.6951 ) Return-Path: mbeach@pacland.com X-OriginalArrivalTime: 23 Sep 2008 15:03:01.0187 (UTC) FILETIME=[78D94930:01C91D8D] ------_=_NextPart_001_01C91D8C.D5E5DFC8 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_001_01C91D8C.D5E5DFC8 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_001_01C91D8C.D5E5DFC8-- Mike Beach SMTP mbeach@pacland.com Steve Harrington; Grant Beck State Route 510 Extension and Connection to 103rd Gentlemen, I have not heard from you for quite some time on this….please let me know if there is something we can do. Thanks. Mike Beach PACLAND 606 Columbia Street NW, Suite 211 Olympia, WA 98501 Office: (360) 786-9500 Fax: (360) 786-5267 TURNING VISIONS INTO REALITY *Confidentiality Disclaimer* This communication is the property of PACLAND and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. ________________________________ From: Mike Beach Sent: Wednesday, September 17, 2008 9:34 AM To: 'Steve Harrington' Subject: RE: State Route 510 Extension and Connection to 103rd Steve, I haven’t heard anything in quite some time on the STEP tank drawings….can you let me know where the City is with this? Thanks, Mike Beach PACLAND 606 Columbia Street NW, Suite 211 Olympia, WA 98501 Office: (360) 786-9500 Fax: (360) 786-5267 TURNING VISIONS INTO REALITY *Confidentiality Disclaimer* This communication is the property of PACLAND and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. ________________________________ From: Steve Harrington [mailto:steveh@ci.yelm.wa.us] Sent: Friday, August 08, 2008 12:19 PM To: Mike Beach Subject: RE: State Route 510 Extension and Connection to 103rd Thank you, ________________________________ From: Mike Beach [mailto:mbeach@pacland.com] Sent: Friday, August 08, 2008 10:33 AM To: Steve Harrington Cc: Grant Beck Subject: RE: State Route 510 Extension and Connection to 103rd Steve, The 510 documents are being put together to be sent out to contractor’s for bid in the near future. As you know, this project is required to complete a SWPPP along with an NOI (in which requires a 30 day comment period) to the WADOE. We have prepared the SWPPP and are sending to WMT for review next week. I assume they will review and submit the NOI to DOE within the next two weeks. The public notice will run next week and the following week and then the 30 day comment period will start. Meanwhile, we will be lining up a contractor. I’ll keep you updated on the progress. Thanks, Mike Beach PACLAND 606 Columbia Street NW, Suite 211 Olympia, WA 98501 Office: (360) 786-9500 Fax: (360) 786-5267 TURNING VISIONS INTO REALITY *Confidentiality Disclaimer* This communication is the property of PACLAND and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. ________________________________ From: Steve Harrington [mailto:steveh@ci.yelm.wa.us] Sent: Friday, August 08, 2008 10:21 AM To: Mike Beach Cc: Grant Beck Subject: State Route 510 Extension and Connection to 103rd Mike: When can we expect the pre-con to take place and work to begin on the State Route 510 Extension Project? We need to complete this portion in the time frame in which was given for completion. If I am not mistaken, the time is drawing near? The summer season would be a great time to get this done. What-ever you need to do to get this portion going, please do so. I also have the step sewer plans for Wal-Mart in review right now. We would expect that work on this would begin this summer also. Please keep us posted on the progress of these projects Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <0F31CAB046FF094C8452BD677F563E9BD95EBD@MAIL.PacificLandDesign.com> <0F31CAB046FF094C8452BD677F563E9BD95AF3@MAIL.PacificLandDesign.com> <DC90029353CCCD468AA2A2858FFCD8F57E8131@server1.ci.yelm.wa.us> <0F31CAB046FF094C8452BD677F563E9BD95E4A@MAIL.PacificLandDesign.com> <0F31CAB046FF094C8452BD677F563E9BD95E4A@MAIL.PacificLandDesign.com> RE%3A State Route 510 Extension and Connection to 103rd-3.EML Steve Harrington urn:content-classes:message Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH steveh Steve Harrington SMTP steveh@ci.yelm.wa.us Grant Beck EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT Grant Beck Grant Beck SMTP grantb@ci.yelm.wa.us