Loading...
RE Wal-Mart 3705 Yelm Backflow Assembly (34)IPM.Note RE: Wal-Mart 3705 Yelm Backflow Assembly Steve Harrington Jim Gibson Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON RE: Wal-Mart 3705 Yelm Backflow Assembly EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON 'Roland Gorgas'; 'Ryan Rantz'; Steve Harrington; Kevin Ray; Tim Peterson; Gary Carlson 'Mike Beach'; 'Alton Lewis' RE: Wal-Mart 3705 Yelm Backflow Assembly After reviewing the civil plans and the previous comment letter dated December 20, 2005. It appears that the City required the RPBA to be installed behind the domestic meter and a Double Check Valve behind the irrigation meter. ( See comment no 6 in the attached letter). The civil plans on sheet C3.0 require a “2” backflow prevention” for the domestic meter, but does not call out what exactly that is. The landscape irrigation meter calls out a DDCV and references the landscape plans for the detail. Even though I approved the plans without the exact back flow device called out on the plans you can see that the requirement and location was clearly made during the review of the plans and we will want this to be installed as requested. If you have any questions please do not hesitate to contact me. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 <mailto:jimg@ci.yelm.wa.us> jimg@ci.yelm.wa.us _____ From: Mike Beach [mailto:mbeach@pacland.com] Sent: Thursday, March 01, 2007 11:17 AM To: Alton Lewis; Jim Gibson Cc: Roland Gorgas; Ryan Rantz; Steve Harrington Subject: RE: Wal-Mart 3705 Yelm Backflow Assembly Originally all of the backflow assembly equipment was to be located inside the building per the approved drawings. Has that changed? This would eliminate the need to find a location outside of the building as well as another vault/structure to house the equipment. Jim, can this be located as originally shown on the architectural plans? Mike Beach PACLAND <http://www.pacland.com> 606 Columbia Street NW, Suite 106 Olympia, WA 98501 Office: (360) 786-9500 Fax: (360) 786-5267 TURNING VISIONS INTO REALITY _____ From: Alton Lewis [mailto:alewis@bird.ca] Sent: Wednesday, February 28, 2007 1:32 PM To: Jim Gibson; Mike Beach Cc: Roland Gorgas; 'Ryan Rantz'; Steve Harrington Subject: RE: Wal-Mart 3705 Yelm Backflow Assembly Importance: High Jim/Mike, 2nd try here on this issue. See the drawing for what the City is requiring. Issue's are if this will fit in the area that is presently designated for the backflow device, and also it appears this product needs a heat block because it is above ground. Let me hear back on this As Soon As Possible. Alton . -----Original Message----- From: Alton Lewis [mailto:alewis@bird.ca] Sent: Tuesday, February 20, 2007 9:01 AM To: Jim Gibson (jimg@ci.yelm.wa.us); (mbeach@pacland.com) Cc: Roland Gorgas; 'Ryan Rantz' Subject: Wal-Mart 3705 Yelm Backflow Assembly Jim, Installed the backflow assembly as submitted. Then had the backflow assembly tested as required. Roland w/Wood and Son's took this paperwork up to Public Works to get our meter released and then was told by Kevin Ray that we had installed the incorrect type of backflow assembly. Kevin produced a Wal-Mart Preliminary worksheet date Sept. 8, 2005 that says a Reduced Pressure Backflow Assembly is required. Have you a product requirement for the Reduced Pressure Backflow Assembly that Kevin Ray is referring to. If so please provide the information to myself and Pacland. Thanks Alton Lewis Bird Construction Wal-Mart, Yelm Project site # 360-400-3229 Fax # 360-400-1564 <DC90029353CCCD468AA2A2858FFCD8F5194099@server1.ci.yelm.wa.us> RE%3A Wal-Mart 3705 Yelm Backflow Assembly-4.EML Jim Gibson Jim Gibson 11.0 05-0091 Onsite Review #2 122005 05-0091 Onsite Review _2 122005 'Mike Beach' SMTP mbeach@pacland.com Mike Beach 'Mike Beach' Mike Beach 'Alton Lewis' SMTP alewis@bird.ca Alton Lewis 'Alton Lewis' Alton Lewis 'Roland Gorgas' SMTP astrofreak03@yahoo.com Roland Gorgas 'Roland Gorgas' Roland Gorgas 'Ryan Rantz' SMTP rrantz@bird.ca Ryan Rantz 'Ryan Rantz' Ryan Rantz Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh (360) 458-8423 Community Development Steve Harrington SMTP steveh@ci.yelm.wa.us Steve Harrington Kevin Ray EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin kevin@ci.yelm.wa.us kevin Public Works Kevin Ray Kevin Ray Kevin Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim Public Works Tim Peterson SMTP tim@ci.yelm.wa.us Tim Peterson Tim Gary Carlson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gary garyc@ci.yelm.wa.us gary Community Development Gary Carlson Gary Carlson GARY 05-0091 Onsite Review #2 122005.pdf (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 December 20, 2005 Bill Dunning PE Pacland 606 Columbia St NW Olympia, WA 98501 RE: Wal-Mart – COY Project Number SPR-05-0091-YL Second Review of Civil Onsite Construction Documents Mr. Dunning: The City of Yelm has completed the initial review of the proposed Wal-Mart store. Your application included: • Civil construction documents • Drainage and Erosion Control Report We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual, MDNS, the staff review the preliminary land use and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Erosion and Sedimentation Plan: 1. The catchbasin socks should be installed as soon as the catch basins have been constructed not after paving. 2. The temporary erosion ponds have a bottom elevation at 340.00. If the ground water level is at 340.00 what kind of protection will the ground water have? Grading and Storm Drainage Plan: 3. The roof drains design notes to see architect plans, and when the architect plans say see civil plans. Please make sure the additional information is placed on one of the sets of plans. 4. The 8 foot screening wall details are not shown. The architect’s plans do not have them either. 5. I am reviewing the stormwater system now. I will try to get you any comments by Tuesday. I do not expect any thing significant but I just have to review it. Utility Plan, (Sheet 6. Please show the irrigation and domestic meters larger on the plan. Also the backflow prevention needs to be installed directly behind the meter not in the building. If you want a secondary protection inside the building that is ok however the City requires backflow December 20, 2005 Page 2 of 3 at the meter. The backflow device should be a RPBA on the domestic and Double Check valve at the irrigation meter. 7. A 10” water valve needs to be installed at the hydrant tee located at approx. Sta. 10+00. I did not see this on the plans. 8. The fire department connection, fire hydrant and indicator valve are located as the City of Yelm prefers. Please do not move the FDC to the building. 9. The water details shown on the plans are not the most current versions. 10. The step tank is shown in a low spot behind the building. The nearest CB inlet is 341.60 and the rim of the step tank is 341.30. The step tank must have positive drainage away from the accesses. 11. The City of Yelm has a policy that all grease interceptors shall be 1,500 gallons or larger. Also it appears that the 1500 gallon grease interceptor you are currently proposing is not large enough for the use. The sewer department is requiring a min of 4,500 gallon size for the larger unit. 12. A hose bib will be required to be within 50 feet of the STEP Tank(s) for maintenance. I was not able to locate it on the civil or architects drawings. 13. The step line from the tank to the sewer main should be 2” in size. 4” is much too big and will cause increased maintenance for the city. Site Lighting Plan (Sheet 21): 14. Please submit a copy of the lighting plan with the projected photogramic numbers shown on it for review. Water and Sewer Profiles and Detail (Sheets 22 thru 25): 15. The City of Yelm requires sand to be used a bedding material for water and sewer pipes. Please change the plan spec. to reflect this. Landscape Plan Sheet 38): 16. Need City of Yelm Street Tree Planting detail 4-19 from Development Guidelines, for Type III street trees. 17. Street tree planting requires 1 accent tree for every 3 street trees. 18. The parking islands in the southwest area of the parking lot are missing the required landscaping trees. 19. Are the existing trees to remain at the NW corner? Show how many and what size. Also the landscaping needs to be continued to the property corner. 20. C-8.1 shows a decorative landscape wall. It calls for cultured stone or brick veneer per owner. The land use approval calls for a river rock wall, is that the landscape wall described above? 21. The landscape plan calls out 20’ trellis element. Is there a detail for that? 22. Land Use approval #11: The landscape buffer along the frontages of SR 507 and SR 510 Yelm Loop shall provide parking lot screening according to the design guidelines applicable to the gateway district. The screening shall incorporate a combination of the following design elements: • Screen walls of river rock no less than 3 feet in height and segments not less than 20 feet in length. • Landscaping typical of type II • Decorative fence or trellis December 20, 2005 Page 3 of 3 • Appropriate transit facilities for Intercity Transit along the SR 510 Yelm Loop frontage. There are no plans submitted for the transit facility. The decorative screen wall that is located in this area may need to be moved to the north if it interferes with the transit facility. There needs to be an accessible path from the transit station to parking and store frontage. 23. What is the 12’ x 90’ bale/pallet enclosure? Please add details for enclosure and screening for this enclosure? Conditions of Approval: 24. Currently, the Conditions of Approval are being appealed. When the appeal is completed please verify that the plans are meeting all the Conditions of Approval issued by staff or the Hearing Examiner. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. Mike Beach, Pacland .pdf 05-009~2.PDF 05-0091 Onsite Review #2 122005.pdf