Re Status on Wal-mart Revised Step TankIPM.Note
Re: Status on Wal-mart Revised Step Tank ???
Re:
Steve Harrington
Mike Beach
Steve Harrington
SMTP
mbeach@pacland.com
Status on Wal-mart Revised Step Tank ???
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Microsoft Mail Internet Headers Version 2.0
Received: from psmtp.com ([64.18.0.48]) by server1.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.3959);
Thu, 16 Jul 2009 16:57:05 -0700
Received: from source ([66.162.141.202]) by exprod5mx253.postini.com ([64.18.4.10]) with SMTP;
Thu, 16 Jul 2009 18:55:45 CDT
Content-class: urn:content-classes:message
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01CA0670.EE00000F"
X-MimeOLE: Produced By Microsoft Exchange V6.5
Subject: Re: Status on Wal-mart Revised Step Tank ???
Date: Thu, 16 Jul 2009 16:55:43 -0700
Message-ID: <0F31CAB046FF094C8452BD677F563E9BF68E92@MAIL.PacificLandDesign.com>
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
Thread-Topic: Status on Wal-mart Revised Step Tank ???
Thread-Index: AcoGbvaC4TDTq/6XRC6/krWcM4wMwwAAaAUc
From: "Mike Beach" <mbeach@pacland.com>
To: <steveh@ci.yelm.wa.us>,
<jimd@ci.yelm.wa.us>
Cc: <grantb@ci.yelm.wa.us>
X-pstn-neptune: 0/0/0.00/0
X-pstn-levels: (S:90.95362/99.90000 CV:99.9000 FC:95.5390 LC:95.5390 R:95.9108 P:95.9108 M:97.0282 C:98.6951 )
Return-Path: mbeach@pacland.com
X-OriginalArrivalTime: 16 Jul 2009 23:57:05.0859 (UTC) FILETIME=[1F3C3130:01CA0671]
------_=_NextPart_001_01CA0670.EE00000F
Content-Type: text/plain;
charset="utf-8"
Content-Transfer-Encoding: base64
------_=_NextPart_001_01CA0670.EE00000F
Content-Type: text/html;
charset="utf-8"
Content-Transfer-Encoding: base64
------_=_NextPart_001_01CA0670.EE00000F--
Mike Beach
SMTP
mbeach@pacland.com
Grant Beck
Steve Harrington; Jim Doty
Status on Wal-mart Revised Step Tank ???
Steve, Walmart has put the project out to bid and will be ready to start
in about 2 weeks, pending City approval. I've notified the tank designer
to update the plans per our last conversation and the one
constructibility issue (per the City comment letter). The other items
are mostly procedural, eg. the pre-construction meeting. I'll type a
response letter and hope to a get revised plan from DR Strong early next
week. Then hopefully the City will be able to work with us as I would
hate to see it delayed longer.
Thanks.
Mike Beach
PACLAND
606 Columbia Street NW, Suite 106
Olympia, WA 98501
Office: (360) 786-9500
Fax: (360) 786-5267
________________________________
From: Steve Harrington
To: Mike Beach; Jim Doty
Sent: Thu Jul 16 16:41:41 2009
Subject: Status on Wal-mart Revised Step Tank ???
Mike- What is the status on these plans? The window of opportunity to
begin the project is now. Can we expect a submittal of revised step
tank plans soon, with all the items from the requirement letter
addressed? Please respond soon, so we can plan for this project to be
completed this summer.
Thanks,
Steve
<0F31CAB046FF094C8452BD677F563E9BF68E92@MAIL.PacificLandDesign.com>
Re%3A Status on Wal-mart Revised Step Tank %3F%3F%3F.EML
Steve Harrington
urn:content-classes:message
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
steveh
steveh@ci.yelm.wa.us
SMTP
steveh@ci.yelm.wa.us
Jim Doty
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JIMD
jimd
jimd@ci.yelm.wa.us
SMTP
jimd@ci.yelm.wa.us
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT
Grant Beck
grantb@ci.yelm.wa.us
SMTP
grantb@ci.yelm.wa.us