Loading...
Wal-Mart Punchlist and Tof OIPM.Note Wal-Mart Punchlist and Tof O Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Wal-Mart Punchlist and Tof O Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Grant Beck Wal-Mart Punchlist and Tof O 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Grant: Attached is one of latest punchlist that I found in the Wal-Mart file. I am not sure if all items on the list have been addressed, we can remove the painting of the light poles and the fence, they are now complete. I did send the e-mail to Many Crisostomo of Bird Construction. I believe I sent you a copy cc Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <DC90029353CCCD468AA2A2858FFCD8F554E1A4@server1.ci.yelm.wa.us> Wal-Mart Punchlist and Tof O.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007 Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007 Grant Beck EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant grantb@ci.yelm.wa.us Grant Beck 458-8408 Community Development Grant Beck Grant Beck Grant Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc August 13, 2007 The following are a few minor issues that need to be addressed and completed for the Yelm Wal-Mart. Sewer Onsite: The pump Lag-Float is operating both pumps at the same time. The lead float does nothing. This needs to be corrected. The aluminum lid on the pump end of the step tank is cracked and must be replaced. The green lids on the step tank must be secured down with stainless steel screws. Sewer Offsite: The gate valve box at the intersection of Grove Road and 100th must be cleaned out. Civil items: Near the east entrance form the guard rail to the first light pole, the grade on the back of sidewalk needs to be brought up to 1” and out 1’ of back of walk grade. Parking lot lamp that is on the ground behind the sound barrier wall at the end of the 510 loop and the west end of sound wall needs to be placed somewhere within the confines of Wal-Mart. Electrical cover on light pole # 14 – 240, at the west end of the parking lot near the intersection of 510 loop and State Route 507. .doc WAL-MA~1.DOC Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc 05-0091 Punchlist Letter 091307.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 September 13, 2007 Allen Seay Wal-Mart Stores 2001 Southeast 10th Street Bentonville, AR 72716-0550 Dear Allen: The Community Development Department has been coordinating civil punch list items since your opening on July 18th. These comments were originally sent to you in a letter dated July 9, 2007. As a follow, up please see our comments below. The bold statement after each comment is the status as we understand them today. Sewer At station 117+00 a concrete pad is needed on the valve box. This pad should be 6” thick by 24” square. Completed The Air Release Assemblies at station 11+00 needs an insulated lid, screws in the lid and toning wire. Completed The Air Release Assembly at station +70 needs an insulated lid, screws in the lid and a traffic bearing ring and cover. Completed The End of Line Clean-Out at station 130 +10 needs to have the blow-off and toning wire brought up as high as possible and the lid needs to be labeled “Sewer” not “Water” Completed At station 167+25 (Yelm Avenue East) the End of Line Clean Out (including the toning wire) needs to be extended up as high as possible. Rocks need to be removed from this stand pipe and a 3’-4’ valve extension added to the valve. Completed At station 53+00 the gate valve stand-pipe seems to be separated and the valve nut cannot be accessed. This needs to be corrected. Completed The power disconnect must be drilled to allow the use of a City of Yelm pad lock when the disconnect is in the “ON” position. Completed The Pump Control Panel must be equipped with a surge arrester pursuant to City of Yelm specifications. Completed The Carson (valve) box at SR 507 (Yelm Avenue East) must be raised to finish grade. Completed The Public Works Department – Sewer Division must be supplied with test results from a certified Man-Hole Vacuum tester for the testing done to the manholes on site. Completed All traffic bearing lids 30” or larger must be aluminum per City of Yelm Specifications. Completed Due to the installation and lid size, the green lid from the ‘solids’ end of the STEP tank could not be removed. Completed The “J” Box in the STEP Tank must have the lid secured with stainless steel Phillips head screws, rather than “square” drive screws. Completed A written tank warranty will be required. Completed The pump system installed is a “duplex” system (two pumps) but only one “on-off” float was installed. A float for each pump is required. Completed Water All on-site and off-site issues with the potable water infrastructure have been addressed. Completed Civil Improvements to SR 507 and the SR 510 Yelm Loop must be inspected and approved by the Washington State Department of Transportation, including all paving, striping, and the traffic signal, which must be operational before opening. Not Completed at this time per Wsdot Inspector. Improvements to 103rd Street must be inspected and approved by Thurston County. Not Completed at this time per County Inspector. The corner located at SR 507 and SR 510 Loop needs to be completed. Completed All plastic packaging needs to be removed from extruded domes. Completed The sidewalk on SR 507 from the guard rail to SR 510 Loop needs to be brought up to the concrete surface area. Completed The broken sidewalk panel adjacent to the tire and lube exit, marked with red spray paint, must be replaced. Completed The broken curb panel adjacent to the tire and lube exit, marked in red spray paint, must be replaced. Completed All sidewalk areas need to be cleaned. Completed All street signage must be installed. Completed The remaining sections of the perimeter wall must be installed. Completed After the parking lot is striped, confirmation is required that the required number of parking stalls, including the ratio of compact stalls to regular stalls, have been installed and that the required emergency vehicle parking stall within 75 feet of door has been striped and signed. Not Completed All required landscaping must be installed. Completed The bus shelter near the intersection of SR 507 and SR 510 must be installed and confirmation provided that the bus stop is ADA compliant. Not Complete The corner enhancement must be complete. Completed A financial guarantee must be in place for the maintenance of the stormwater system, perimeter and parking lot landscaping and the building must be in place. Not Completed The chain link fence on SR 507 must be painted green to match the street lights. Not Completed The Street Lights must be painted green. Not Completed - This comment was addressed in separate emails with Pacland and Contractor but was not listed on previous letter. Documentation The following items are not required for the opening of the store, but within 45 days of the issuance of a certificate of occupancy. Water line and sewer line and STEP tank easements must be recorded, including a general access easement across the property to access the City owned improvements covered by the easements. Bill of Sale for all water and sewer system infrastructure to be dedicated to the City, including water mains, sewer trunk lines, and STEP tanks. Dedication of all water and sewer system infrastructure to be maintained by the City, including water mains, sewer trunk lines, and STEP tanks. The stormwater maintenance and operations agreement must be recorded. As-built plans must be submitted to the Community Development Department. Dedication of the SR 510 Loop Right of Way area. New Comment missed from the first letter. While City staff will continue to monitor your progress, it would be appropriate for you to schedule a final inspection when you believe that all punch list items have been addressed. Sincerely, Grant Beck, Director Community Development Department c. Mike Beach, PACLAND Alton Lewis, Bird Construction Lori Cole, Architects BCRA Page 2 of 3 (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc 05-009~4.DOC 05-0091 Punchlist Letter 091307.doc