Wal-Mart Punchlist and Tof OIPM.Note
Wal-Mart Punchlist and Tof O
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Wal-Mart Punchlist and Tof O
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Grant Beck
Wal-Mart Punchlist and Tof O
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Grant: Attached is one of latest punchlist that I found in the Wal-Mart file. I am not sure if all items on the list have been addressed, we can remove the painting of the light poles
and the fence, they are now complete. I did send the e-mail to Many Crisostomo of Bird Construction. I believe I sent you a copy cc
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<DC90029353CCCD468AA2A2858FFCD8F554E1A4@server1.ci.yelm.wa.us>
Wal-Mart Punchlist and Tof O.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007
Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant
grantb@ci.yelm.wa.us
Grant Beck
458-8408
Community Development
Grant Beck
Grant Beck
Grant
Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc
August 13, 2007
The following are a few minor issues that need to be addressed and completed for the Yelm Wal-Mart.
Sewer Onsite:
The pump Lag-Float is operating both pumps at the same time. The lead float does nothing. This needs to be corrected.
The aluminum lid on the pump end of the step tank is cracked and must be replaced.
The green lids on the step tank must be secured down with stainless steel screws.
Sewer Offsite:
The gate valve box at the intersection of Grove Road and 100th must be cleaned out.
Civil items:
Near the east entrance form the guard rail to the first light pole, the grade on the back of sidewalk needs to be brought up to 1” and out 1’ of back of walk grade.
Parking lot lamp that is on the ground behind the sound barrier wall at the end of the 510 loop and the west end of sound wall needs to be placed somewhere within the confines of Wal-Mart.
Electrical cover on light pole # 14 – 240, at the west end of the parking lot near the intersection of 510 loop and State Route 507.
.doc
WAL-MA~1.DOC
Wal-Mart Punchlist Stuff from latest walk thru Aug.10, 2007.doc
05-0091 Punchlist Letter 091307.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
September 13, 2007
Allen Seay
Wal-Mart Stores
2001 Southeast 10th Street
Bentonville, AR 72716-0550
Dear Allen:
The Community Development Department has been coordinating civil punch list items since your opening on July 18th. These comments were originally sent to you in a letter dated July
9, 2007. As a follow, up please see our comments below. The bold statement after each comment is the status as we understand them today.
Sewer
At station 117+00 a concrete pad is needed on the valve box. This pad should be 6” thick by 24” square. Completed
The Air Release Assemblies at station 11+00 needs an insulated lid, screws in the lid and toning wire. Completed
The Air Release Assembly at station +70 needs an insulated lid, screws in the lid and a traffic bearing ring and cover. Completed
The End of Line Clean-Out at station 130 +10 needs to have the blow-off and toning wire brought up as high as possible and the lid needs to be labeled “Sewer” not “Water” Completed
At station 167+25 (Yelm Avenue East) the End of Line Clean Out (including the toning wire) needs to be extended up as high as possible. Rocks need to be removed from this stand pipe
and a 3’-4’ valve extension added to the valve. Completed
At station 53+00 the gate valve stand-pipe seems to be separated and the valve nut cannot be accessed. This needs to be corrected. Completed
The power disconnect must be drilled to allow the use of a City of Yelm pad lock when the disconnect is in the “ON” position. Completed
The Pump Control Panel must be equipped with a surge arrester pursuant to City of Yelm specifications. Completed
The Carson (valve) box at SR 507 (Yelm Avenue East) must be raised to finish grade. Completed
The Public Works Department – Sewer Division must be supplied with test results from a certified Man-Hole Vacuum tester for the testing done to the manholes on site. Completed
All traffic bearing lids 30” or larger must be aluminum per City of Yelm Specifications. Completed
Due to the installation and lid size, the green lid from the ‘solids’ end of the STEP tank could not be removed. Completed
The “J” Box in the STEP Tank must have the lid secured with stainless steel Phillips head screws, rather than “square” drive screws. Completed
A written tank warranty will be required. Completed
The pump system installed is a “duplex” system (two pumps) but only one “on-off” float was installed. A float for each pump is required. Completed
Water
All on-site and off-site issues with the potable water infrastructure have been addressed. Completed
Civil
Improvements to SR 507 and the SR 510 Yelm Loop must be inspected and approved by the Washington State Department of Transportation, including all paving, striping, and the traffic signal,
which must be operational before opening. Not Completed at this time per Wsdot Inspector.
Improvements to 103rd Street must be inspected and approved by Thurston County. Not Completed at this time per County Inspector.
The corner located at SR 507 and SR 510 Loop needs to be completed. Completed
All plastic packaging needs to be removed from extruded domes. Completed
The sidewalk on SR 507 from the guard rail to SR 510 Loop needs to be brought up to the concrete surface area. Completed
The broken sidewalk panel adjacent to the tire and lube exit, marked with red spray paint, must be replaced. Completed
The broken curb panel adjacent to the tire and lube exit, marked in red spray paint, must be replaced. Completed
All sidewalk areas need to be cleaned. Completed
All street signage must be installed. Completed
The remaining sections of the perimeter wall must be installed. Completed
After the parking lot is striped, confirmation is required that the required number of parking stalls, including the ratio of compact stalls to regular stalls, have been installed and
that the required emergency vehicle parking stall within 75 feet of door has been striped and signed. Not Completed
All required landscaping must be installed. Completed
The bus shelter near the intersection of SR 507 and SR 510 must be installed and confirmation provided that the bus stop is ADA compliant. Not Complete
The corner enhancement must be complete. Completed
A financial guarantee must be in place for the maintenance of the stormwater system, perimeter and parking lot landscaping and the building must be in place. Not Completed
The chain link fence on SR 507 must be painted green to match the street lights. Not Completed
The Street Lights must be painted green. Not Completed - This comment was addressed in separate emails with Pacland and Contractor but was not listed on previous letter.
Documentation
The following items are not required for the opening of the store, but within 45 days of the issuance of a certificate of occupancy.
Water line and sewer line and STEP tank easements must be recorded, including a general access easement across the property to access the City owned improvements covered by the easements.
Bill of Sale for all water and sewer system infrastructure to be dedicated to the City, including water mains, sewer trunk lines, and STEP tanks.
Dedication of all water and sewer system infrastructure to be maintained by the City, including water mains, sewer trunk lines, and STEP tanks.
The stormwater maintenance and operations agreement must be recorded.
As-built plans must be submitted to the Community Development Department.
Dedication of the SR 510 Loop Right of Way area. New Comment missed from the first letter.
While City staff will continue to monitor your progress, it would be appropriate for you to schedule a final inspection when you believe that all punch list items have been addressed.
Sincerely,
Grant Beck, Director
Community Development Department
c. Mike Beach, PACLAND
Alton Lewis, Bird Construction
Lori Cole, Architects BCRA