Loading...
Yelm WA Wal-Mart #3705 - STEP Tank meeting on siteIPM.Note Yelm, WA Wal-Mart #3705 - STEP Tank meeting on site Steve Harrington Mike Beach Steve Harrington SMTP mbeach@pacland.com Yelm, WA Wal-Mart #3705 - STEP Tank meeting on site EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Microsoft Mail Internet Headers Version 2.0 Received: from psmtp.com ([64.18.0.112]) by server1.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.3959); Fri, 20 Jun 2008 17:00:38 -0700 Received: from source ([66.162.141.202]) by exprod5mx288.postini.com ([64.18.4.10]) with SMTP; Fri, 20 Jun 2008 16:58:54 PDT Content-class: urn:content-classes:message MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----_=_NextPart_001_01C8D331.97FD5ECE" X-MimeOLE: Produced By Microsoft Exchange V6.5 Subject: Yelm, WA Wal-Mart #3705 - STEP Tank meeting on site Date: Fri, 20 Jun 2008 16:58:53 -0700 Message-ID: <0F31CAB046FF094C8452BD677F563E9BD95587@MAIL.PacificLandDesign.com> X-MS-Has-Attach: X-MS-TNEF-Correlator: Thread-Topic: Yelm, WA Wal-Mart #3705 - STEP Tank meeting on site thread-index: AcjTMZca0byWkgoIRTO6w1dHfcWy9Q== From: "Mike Beach" <mbeach@pacland.com> To: "Grant Beck" <grantb@ci.yelm.wa.us>, "Allen Seay" <Allen.Seay@wal-mart.com> Cc: "Steve Harrington" <steveh@ci.yelm.wa.us> X-pstn-neptune: 0/0/0.00/0 X-pstn-levels: (S:99.90000/99.90000 CV:99.0000 R:95.9108 P:95.9108 M:97.0282 C:98.6951 ) Return-Path: mbeach@pacland.com X-OriginalArrivalTime: 21 Jun 2008 00:00:38.0437 (UTC) FILETIME=[D66CC550:01C8D331] ------_=_NextPart_001_01C8D331.97FD5ECE Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_001_01C8D331.97FD5ECE Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_001_01C8D331.97FD5ECE-- Mike Beach SMTP mbeach@pacland.com Steve Harrington Grant Beck; Allen Seay Yelm, WA Wal-Mart #3705 - STEP Tank meeting on site Grant, As a follow up to our site visit this morning: Allen Seay, Sherlita Kennedy, Dave Jensen, Steve H, and I walked through the entire store and it is pretty apparent that the only place the paper towels could be coming from is the public restrooms near the front of the store. The remainder of the store either utilizes grease traps or does not have a direct connection to the sanitary system. After discussing the situation on site, it looks like there are two approachable options for resolving the paper towel issue: 1) The first would be to remove the current towels within the restrooms and install hand dryers. The store manager has indicated that the customers will be unhappy with this approach as she currently has many complaints if the restrooms run out of towels. I’m sure you can understand that unhappy customers could result in fewer customers and less return. 2) This option would include the installation of the new tank downstream of the current tank. The pumps will be removed from the current tank and installed in the new tank. Once the new tank is installed, the first tank would be monitored and we would then be able to determine if the solids are settling and the tank may need to be pumped less often. With this option Wal-Mart would enter into an agreement with the City to maintain (pump) the settling tank, while the City still maintains the pumping tank. Obviously, reading through the options you could ascertain that we may end up with a hybrid of both in the end and really it will be determined with time and the installation of the additional tank. Wal-Mart is currently working on the analysis to determine the most cost effective approach on the paper towel issue as well as determining a overall solution to the problem. One other item to note was the presence of latex gloves in the existing tank and the store manager indicated that she will inform the cleaning staff that those are no longer to be flushed and are to be put into the solid waste receptacles. Allen, please feel free to add to this if you see necessary. Please let me know if you have any questions on today’s meeting or the above information. Regards, Mike Beach PACLAND 606 Columbia Street NW, Suite 211 Olympia, WA 98501 Office: (360) 786-9500 Fax: (360) 786-5267 TURNING VISIONS INTO REALITY *Confidentiality Disclaimer* This communication is the property of PACLAND and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. <0F31CAB046FF094C8452BD677F563E9BD95587@MAIL.PacificLandDesign.com> Yelm, WA Wal-Mart %233705 - STEP Tank meeting on site.EML Steve Harrington urn:content-classes:message Grant Beck EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GRANT Grant Beck Grant Beck SMTP grantb@ci.yelm.wa.us Allen Seay SMTP Allen.Seay@wal-mart.com Allen Seay Allen Seay Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH steveh Steve Harrington SMTP steveh@ci.yelm.wa.us