Yelm Wal-Mart Super Store Storm Water System Test ReportIPM.Note
Yelm Wal-Mart Super Store Storm Water System Test Report
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Yelm Wal-Mart Super Store Storm Water System Test Report
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jim Gibson
Yelm Wal-Mart Super Store Storm Water System Test Report
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Jim: Here is a copy of the report I made for the storm water system test that was completed on 7/10/07 at Wal-Mart. I put this in the project file folder.
Thanks,
Steve
<DC90029353CCCD468AA2A2858FFCD8F528F83A@server1.ci.yelm.wa.us>
Yelm Wal-Mart Super Store Storm Water System Test Report.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
City of Yelm Inspection Form 1 Wal-Mart Functional Test of Electrical - Control - Panel and Storm Water System
City of Yelm Inspection Form 1 Wal-Mart Functional Test of Electrical - Control - Panel and Storm Water System
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
City of Yelm Inspection Form 1 Wal-Mart Functional Test of Electrical - Control - Panel and Storm Water System.doc
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 7/10/07
Day: Tuesday
Time: 8:45 a.m. Project Name:
Yelm Wal-Mart Super Store Project Number
SPR-05-0091-YL Project Description:
Wal-Mart Retail Store Contractor's Name:
Contractor: Pac Land / Bird Construction / Wood & Son Construction / Paco Pumps / Hawkes Electric 1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, warm and clear. Wood & Son Construction, Paco Pumps Corey Rasmussen and Mark and Hawkes Electric Representative on site 9:10 a.m. We are on site to perform a functional test on
the storm water system. Test will be performed on control panel, pumps and floats to verify operation and performance limits.
2. Contract Time: Last Working Day Charged (Date) Remaining Working Days
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Paco and
Hawkes Electric are performing the test on the storm water system located in the Yelm Wal-Mart Super Store parking lot.
Test # 1: During the testing of the small manhole pumps (Roof drain m.h.) to the infiltration system, a loud rattling noise was coming from the pumps. The pumps were not getting a
good reading at the control panel; they were running at only 30%. It was discovered the pumps were not wired correctly in the control panel, they were wired backwards. This was corrected
by wiring the pumps correctly in the control panel they are now running at 100%.
The floats signal and alarm were tested at various stages, they were found to be working correctly at all levels.
Test # 2: During the testing of the larger manhole pumps (parking lot storm water drainage m.h.) to the storage system, a loud rattling noise was coming from the pumps during this test
also. The pumps were not getting a good reading at the control panel; they were running at only 30%. It was discovered the pumps were not wired correctly in the control panel, they
were wired backwards. This was corrected by wiring the pumps correctly in the control panel they are now running at 100%.
The floats signal and alarm were tested at various stages, they were found to be working correctly at all levels.
In conclusion: Testing was completed around 10:15 a.m. All test performed showed lights, signals, alarms, floats and pumps were all functional and working satisfactorily.
Wood & Sons Rep, Roland Gorgas said we may want to do a visual test again during a rain storm when ther is suffient storm water in the vaults.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
All testing of system complete and running.
5. Sketch or Paste Pictures Below: Date
7/10/07 Typed or Printed Name and Title
Steve Harrington Signature
.doc
CITYOF~1.DOC
City of Yelm Inspection Form 1 Wal-Mart Functional Test of Electrical - Control - Panel and Storm Water System.doc