DRAFT 05-0091 Review Ltr 060308
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
June 3, 2008
PACLAND
Mike Beach
606 Columbia Street NW, Suite 106
Olympia, WA 98501
RE: Wal-Mart - SPR-05-0091-YL
Initial Review of SR 510 Extension Roadway Improvements
Mr. Beach:
The City of Yelm has completed the initial review of the asbuilts for the Wal-Mart in Yelm. Your application included:
Construction Plans
Drainage Report
Illumination Photometric Analysis
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following
comments need to be addressed before the plans may be approved for construction. Our comments are summarized below:
WATER COMMENTS:
1. There are NO water plans in this set of prints. There should be a ten inch water main going from where Wal-Mart put in the ten inch main going to 103rd. The water main from Wal –
Mart should be extended to 103rd.
SEWER COMMENTS:
T
ENGINEERING COMMENTS:
Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project
engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will
significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us.
Community Development Department
Respectfully,
Jim Gibson P.E.
Development Review Engineer