05-0091 Sewer Asbuilt 073108CITY OF YELM SEWER DEPARTMENT
July 31, 2008
Re: Wal–Mart Off Site As-Built review
At Sta. # 168+25, the 6” gate valve in the 6” mainline for future use is next to the “T” not at the end of the pipeline.
At Sta. # 167+38, the 4” mainline for future use does not exist.