Loading...
Sewer Wal-Mart as-built review November 29 2007IPM.Note Sewer Wal-Mart as-built review November 29, 2007 Roberta Allen Jon Yanasak Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY Wal-Mart as-built review November 29, 2007 EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN Jon Yanasak EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY Roberta Allen Sewer Wal-Mart as-built review November 29, 2007 Here you go ---- Jon Yanasak City of Yelm Sewer Dept. Mgr Po Box 479 Yelm Wa 98597 Phone 360-458-8411 Fax 360-458-8166 jony@ci.yelm.wa.us <DC90029353CCCD468AA2A2858FFCD8F5397E0A@server1.ci.yelm.wa.us> Sewer Wal-Mart as-built review November 29, 2007.EML Jon Yanasak Roberta Allen 11.0 Wal-Mart offsite as-built review November 29, 2007 Wal-Mart offsite as-built review November 29, 2007 Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen r_allen@ci.yelm.wa.us r_allen 458-3835 Community Development Roberta Allen Roberta Allen Wal-Mart offsite as-built review November 29, 2007.doc CITY OF YELM SEWER DEPARTMENT November 29, 2007 Re: Review Wal-Mart offsite As-Builts The Air Release Assembly shown at Sta. 67+85 was deleted during construction. The “End of Line Clean Out” shown at sta. 67+94 is not shown correctly. A 2” service line (no gate valves) is shown incorrectly at Sta. 67+32. At Sta. 57+70 on Yelm Ave, the drawing shows steel casing, C900 pipe was used. The plan also shows No Open Cuts. An open cut was used and backfilled with CDF. The 22.5 degree bend at Sta. 52+70 was changed to 11.5 degrees. This needs to be changed on the as-builts. The gate valve installed at Sta. 52+65 was moved to the other side of the 45 and 11.5 degree bend in the main line. The Yelm Ave mainline crossing at Sta. 177+00 is shown incorrectly. The pipe was sleeved with C-900 and backfilled with CDF. At Sta. 168+25, 2, 6” gate valves, a 6” “T” and a 6” future capped ‘stub out’ was installed. This is not shown correctly. .doc WAL-MA~1.DOC Wal-Mart offsite as-built review November 29, 2007.doc