05-0091 Revised Step Review No 1 022508 From: Jim Gibson
Sent: Monday, February 25, 2008 5:32 PM
To: 'Mike Beach'
Cc: Grant Beck; Tim Peterson; Jon Yanasak
Subject: Wal-Mart Step Tank Review
Attachments: Parametrix Peer Review Letter 020608.pdf
?Mike -
Sorry it took a little while to get the participants to together to discuss the review comments from the City and Parametrix. We have included them in the attached document for
a consolidated review. I think the letter addresses all the comments that both the City and Parametrix had.
The only remaining question that we briefly discussed was how to hook up the step system to the generator or using a disconnect switch and connection. The City wants the system
to be connected to the Wal-Mart Generation System. Given this we will need to have some drawings on how this is going to be connected. I did here some discussion by
Gary Carlson that he was informed that this was already connected to the generator system. If this is the case we will need to verify the connection and that should meet the intent
of the code.
Please let me know you need anything further.
Jim Gibson
P.E.
City of
Yelm, Development Review Engineer
PO Box 479
Yelm,WA. 98597
Ph. 360.458.8438 Fx. 360.458.3144
jimg@ci.yelm.wa.us