Loading...
05-0091 Review 3 Ltr 092508 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   September 25, 2008 Mike Beach Pacland 606 Columbia St NW Olympia, WA 98501 RE: Wal-Mart – COY Project Number SPR-05-0091-YL 3nd Review of STEP Tank System Mr. Beach: The City of Yelm has completed the third review of the proposed Wal-Mart Step Tank revisions. Your application included: Construction Plans Engineers Response Letter Transmittal We have reviewed the construction plans and engineers response letter for compliance with the City of Yelm Development Guidelines, the Department of Ecology Criteria or Sewage Works Design Manual and National Electrical Code. Review Comments: The new 6000 gal. tank must have hold downs similar to the existing STEP Tank The New 6000 gal tank must have a baffle wall separating the solids end from the pump chamber configured to 2/3 – 1/3 volume. The new 6000 gal tank shall have 3 risers, 1 over the inlet “T”, the 2nd over the opposite end of the solids portion of the tank, and the 3rd over the pumps. Please review the above comments. We would like to schedule a meeting with you and your sub consultant as soon as possible to discuss these comments and agree upon a solution. You may contact me with some dates that you are available for the meeting. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Respectfully, Steve Harrington Civil Inspector