Loading...
SPR-05-0091-YL Approval Letter 08-07-09 (2) City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   August 7, 2009 Mike Beach Pacland 606 Columbia St NW Olympia, WA 98501 RE: Wal-Mart – COY Project Number SPR-05-0091-YL Approval of Revised Step Tank System Mr. Beach: We have reviewed the construction plans and engineers response letter for compliance with the City of Yelm Development Guidelines, the Department of Ecology Criteria or Sewage Works Design Manual and National Electrical Code. The City of Yelm has approved the civil plans for Wal-Mart Revised Step Tank. We will need the following package sent to our office: 4 sets of full size construction plans 1 set of 11”x17” construction plans 1 CD with the AutoCAD drawings and all xrefs included in a separate directory and PDF’s of the approved signed plans. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Sincerely, Steve Harrington Engineering / Civil Inspector