School Cost Estimate
Engineer's Estimate -Combined SR 507 /CARTER-BRIGHTON (YELM COMMUNITY SCHOOLS) SPEC # ITEM UNIT QUANTI UNIT TOTAL 1 1-07 Sill Prevention Plan L.S. 1 $1,000.00 $1,000.00 2 1-09 Mobilization L.S. 1 $31,000.00 $31,000:00 3 1-10 Pro ect Tem ora Traffic Control L.S. 1 $18,000.00 $18,000.00 4 2-02 SawCuttin Existin Pavement L.F. 2,170 $2.00 $4,340.00 5 2-02 Removal of Structures and Obstructions L.S. 1 $5,000.00 $5,000.00 6 2-03 Roadwa Excavation Incl. Haul C.Y. 1,450 $35.00 $50,750.00 7 2-03 Gravel Borrow Incl Haul Ton 555 $15.00 $8,325.00 8 2-03 Unsuitable Foundation Excavation Incl Haul CY 180.00 $40.00 $7,200.00 9 2-11 Trimmin and Cleanu L.S. 1 2500 $2,500.00 10 4-04 Crushed Surfacin Base Course TON 1,330 $20.00 $26,600.00 11 5-04 HMA CI. 1/2-In. PG 58-22 TON 910 $100.00 $91,000.00 12 7-04 Concrete Inlet EACH 1 $1,425.00 $1,425.00 13 7-04 Profile Wall PVC Storm Sewer Pi e, 12" Diameter L.F. 750 $40.00 $30,000.00 14 7-05 Catch Basin T e l EACH 3 $1,500.00 $4,500.00 15 7-05 Ad'ust Catch Basin EACH 1 $1,000.00 $1,000.00 16 7-05 Solid Metal Cover for Catch Basin EACH 1 $700.00 $700.00 17 8-01 Seedin , Ferfilizin ,and Mulchin A.C. 0.270 $1,200.00 $324.00 18 8-01 Water Pollution/Erosion Control L.S. 1 $8,000.00 $8,000.00 19 8-04 Cement Conc. Traffic Curb and Gutter L.F. 1,175 $15.00 $17,625.00 20 8-04 Extruded Curb L.F. 25 $20.00 $500.00 21 8-14 Cement Conc. Sidewalk S.Y. 65 $35.00 $2,275.00 22 8-14 Cement Conc. Sidewalk Ram T e 1 B EACH 3 $1,200.00 $3,600.00 23 8-20 Beacon Assembl EACH 2 $10,000.00 $20,000.00 24 8-21 Permanent Si nin L.S. 1 $10,000.00 $10,000.00 25 8-21 Illumination S stem L.S. 1 $33,775.00 $33,775.00 26 8-22 Paint Line L.F. 5,625 $0.30 $1,687.50 27 8-22 Plastic Wide Line L.F. 1,960 $0.35 $686.00 28 8-22 Plastic Traffic Arrow EACH 8 $100.00 $800.00 29 8-22 Plastic Sto Line L.F. 35 $6.00 $210.00 30 8-22 Plastic Crosswalk Line S.F. 195 $5.00 $975.00 31 8-22 Plastic Bike S mbol EACH 5 $200.00 $1,000.00 32 8-22 Stri in Removal L.F. 4,990 $0.40 $1,996.00 Construction Total= $386,793.50