Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
VanNorhop Estates Sewer Cost Estimate 042402
ITEM Sawcut Asphalt 3" PVC Pipe Locating Wire Sand Bedding Crushed Rock Asphalt Patching Asphalt Delivery Labor: 2 Laborers 1 Excavator w/operator Count LF LF LF TON TON SF HR HR DAY Cost Per 0.5 0.8 0.1 7 7 3.65 80 30 600 Amount 320 180 180 37 24 540 2 16 1 Total 160 144 18 259 168 1971 160 480 600 3960