Loading...
8265-0717-BusseyJuly 17, 2001 Mr. Bob Bussey 157 Lemieux Lane Tenino, WA 98589 RE: Approved Clearing and Grading Permit Longmire Meadows Dear Mr. Bussey: I have reviewed and approved the clearing and grading permit for Longmire Meadows. This permit will allow the removal of trees, grubbing of the stumps and rough grading of the site. This permit has been issued and is subject to the following conditions: A preconstruction meeting will need to be scheduled before tree removal. It would be best to schedule this after the tree protection is installed and tesc measures are in place. All temporary erosion and sedimentation control measures will need to be installed. All tree protection fencing will be installed before any clearing will be allowed Installation of fencing or equivalent along tax parcels 22719231103 and 22719231102 to delineate the edge of your project. This approval does not preclude the review comments that will address the complete civil plan set. If you rough grade the ponds at this time, it will be at your own risk. The approvals of the pond locations and specifications have not been approved under this permit. It is my understanding that the trees to be removed will be used for personal use and will not exceed 5,000 board feet. This letter serves as your clearing and grading permit. Please keep this on-site and available for review as required. Respectfully, Jim Gibson Development Review Engineer 8265-0717-Bussey