Terry: I have been informed that I need to give you a date in which all
the remaining punchlist items need to be completed by. The completion
date is June 27, 2008. Please note that the first punchlist item,
concerning the fire suppression line has changed. Please read
carefully.
These items are as follows:
1. The fire suppression system for the gas station needs to be
recertified after the fire line was broken during construction.
Contact Fire Marshall for specific requirements. This item can be cut
at the area where the break occurred and capped if the owner of the
Shell gas station & store chooses not to maintain this system anymore.
This option was discussed onsite between the owner and City of Yelm
Building Official.
2. Asbuilt Drawings.
3. Bill of sale for Water and Sewer.
4. Easement for Water and Sewer.
5. Please provide ground cover over the landscape corner enhancement
per the approved plans.
6. Box for Double Check Valve Assembly needs to be raised to final
grade.
7. Replace broken valve marker, and straighten good one.
8. Ground in meter box area needs to be restored to condition before
work was started.
The sooner these items can be completed, the sooner we can finalize your
close out on this project.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
'cafeelite@msn.com'
SMTP
cafeelite@msn.com
cafeelite@msn.com
cafeelite@msn.com