Loading...
05-0540 Review letter No 4 090707City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 September 7, 2007 Michael N. Antonoff, P.E. 3316 Deer Island Drive E Lake Tapps, WA 98391 RE: McCammant Fourplexes -City of Yelm Project No. SPR-05-0540-YL Civil Plan Review #4 Mr. Antonoff: The City of Yelm has completed the 4th Civil Plan Review of the proposed subdivision. Your application included: • Engineer Response Letter • Construction Plans • Aqua Swirl Manual We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Water: 1. Please use current details on the plans. These can be obtained from City of Yelm website. 2. Contractor is responsible for all taps on main, the City will not tap main for developer. Please change the call out on the plans. 3. The Building Official has approved the 2" fire sprinkler main to the building. This system will be required to have a water meter installed at the right of way line and a double check valve inside the building. 4. Hydrant locks are required and must be paid for by the developer before project is approved. 5. The call outs for all water meters need to be consistent for all locations and callouts. Sewer: 1. The Step Pump Control Panels not mounted to buildings must be mounted utilizing Hot Dipped Galvanized Uni-Strut posts. 2. A hose bib must be installed within 50' of each Step tank for maintenance of each tank. 3. Please use most current most details in your drawings. (IE 7-9, 7-14,& 7-11) These details may be found at City of Yelm's website. 4. The City requires that only one tap be made to the main and a double connection be utilized to serve both tanks. Please see detail 7-2. (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us 5. The sewer main shown on the drawings is not shown on the correct side of Crystal Springs Rd. It is located on the opposite side of the road. 6. The call outs for all sewer connections need to be consistent on all locations and callouts. Planning Landscape Comments 1. The Landscape plans were approved in the previous review. The irrigation plans need to be updated to match the revised civil plans. The irrigation plans need to be resubmitted and reviewed. Please submit 8 sets of the irrigation plans. 2. Drip Irrigation is required within the planter strip on Crystal Springs Road. The irrigation system that you have proposed is acceptable. However, the City is striving to reduce the consumption of water and we would approve if you wanted to propose a drip irrigation system on the remainder of the site instead of sprinkler heads. Engineering 1. Please see mark ups and redlines on plan sheets. 2. Please show irrigation connection, irrigation meter and backflow devices on the civil plans. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports and 4 sets of landscape and irrigation plans. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. Bryan McCammant September 7, 2007 Page 2 of 2