Loading...
Appeal 09-02-05 - MDNS Conditions1 ~/ \~ YEL1Vt WASHINGTON City of Yelm Community Development Department NOTICE OF APPEAL C.~ i Fee Date Received ~ ~ L U ~ By File No. -US i y~-- Fee: Staff Decision - $50.00 Hearing Examiner Decision - $100.00 (In addition, any professional service charges per Resolution #358) A Closed record appeal may follow either an open record hearing or an open record administrative decision on a project permit application when the appeal is on the record, and no or limited new evidence or information is allowed to be submitted. Appeals on Category 18 II project decisions are heard by the City Council. Appeals on Category III & IV project decisions as well as Category I & II decisions which have been appealed to the City Council go to Superior Court and follow the judicial review process set forth in RCW 366.70C. A Notice of Appeal must be filed within 14 days of Notice of Final Decision. PROJECT CASE NUMBER BEING APPEALED ~5~~ O~ D% ~ `~ y L DATE OF NOTICE OF FINAL DECISION ~c~c-~s~ /~~, 2c~c S APPELLANT(S). ~~~C' ~ ~ C Mailing Address ~~ O • r3~t;x ~'~ City, State and Zip ~/~Gc.~~.~.5~~ ~ Telephone G ~ ~~'S' , Z Z i EMAI L G ~ ~? ~y~ •~~ ~z~~~ z--~ : C~i7y7 SPECIFIC ITEMS OF DECISION BEING APPEALED (attach additional sheet if necessary): ~5c c~rrr~n~E~ . I affirm that all answers, statements and information contained in and submitted with this application are complete and accurate to the best of my knowledge. I also affirm that I am the owner of the subject site or am duly authorized by the owner to act with respect to this application. Further, I grant permission from the owner to any and all employees and representatives of the City of Yelm and other governmental agencies to enter upon and inspect said property as reasonably necessary to process this application. I agree to ay all fees of the City that apply to this application. Signed ~ -----..Date ~~ ~' D~ - ~ - V ]05 Yelm Avenue West PO Box 979 Yelm, WA 98597 (360) 958-3835 (360) 458-3149 FAX u~u~w.ci.yelm.wa.us ti ~~ SAN 4.~ ~ ?(I{?ri CITY OF YELM :~~~ ELI t~ .. ,''^' ~-sFr~ (j ~ , ~ r% F ~~ ~ Mr. Grant Beck, Community Development Director ~. , Date: 31 August 2005 City of Yelm S~;~a `' 105 Yelm Avenue W. P.O. Box 479 Yelm, Washington 98597 Re: Appeal of the Mitigated Determination of Non-Significance File Number SPR-OS-0160-YL and BSP-OS-0197-YL This letter is to formally appeal specific items identified in the published document of "Mitigated Determination of Non-significance" File Number SPR-OS-0160-LY and BSP-OS-0197-YL, signed by Grant Beck, City of Yelm Community Development Director. The following comments are an appeal of items 3 a, b, c and d as stated in the "Mitigating Measures'' of the published document: Item number 3 states that the Civil plan submission shall include an updated preliminary stormwater plan that meets or exceeds the standards in the 1992 stormwater Manual as adopted by the City of Yelm. The stormwater plan shall include the following elements: a. Alternative technologies are not accepted. The City of Yelm has allowed alternative technologies for treating stormwater in past projects, most recently the Yelm High School, Yelm Middle School and Ridgeline Middle School. Alternatively, Thurston County, City of Olympia, City of Tumwater and City of Lacey have all allowed "Alternative Technologies" to be used for the treatment of stormwater prior to infiltration. The proposed Vortechnics unit meets or exceeds many of the traditional means of removing pollutants and would be suitable in this application. We are requesting the City consider the use of effective alternative technologies that are currently being employed and approved with other projects in the City of Yelm and its neighbors. b. The elevation of the bottom of the infiltration gallery shall be a minimum of six feet above the elevation of the high ground water area as identified by Thurston County (approximate elevation 33~), and must be ~0 feet horizontally, or 2 feet vertically away from the High Ground water area, which ever distance is less. 1. The 335 elevation was not disclosed during the pre-submission conference with the City of Yelm. 2. How was this elevation determined, and what datum was this elevation derived from? r ,~ 3. The 1992 DOE stormwater manual indicates that three (3) feet of separation is required between the bottom of the infiltration facility and the seasonal high ground water as determined from soil logs. J.W. Morrissette and Associates conducted 3 separate soil logs on site (see Preliminary Drainage & Erosion Control Report) and did not observe any evidence that would suggest that the ground water was any higher in elevation than 100" below existing grade. This was recorded in the test hole lowest in elevation. 4. Has the City formally adopted Salmon Creek Standards within the Yelm Creek area? This additional criteria was not disclosed at the pre-submission conference. c. Separate water quality treatment for roof runoff shall be provided. The Drainage Manual does not require that roof runoff be treated prior to infiltration. Is this criteria adopted by the City of Yelm? Previous projects within the City of Yelm have not required separate treatment of roof runoff. d. The stormwater system shall be designed to accommodate stormwater generated by required frontage improvements. Currently there is a stormwater collection system along West Road. We understand that the City's system was designed to handle the stormwater requirements for area located within the street right-of--way and includes a treatment and disposal component. Would the City consider the additional runoff for the improvements located in the street to be conveyed into the established collection system situated along West Road? Please feel free to contact me if you have any questions. Messages can be left at either 360-894-2296 or 360-458-3277. Sincerely, /- L-Er ~ g it a 3 & C LLC PO Box 875 Yelm WA 98597