Loading...
Outstanding issuesMarch 20, 2002 Doug Randles P.O. Box 1077 Eatonville, WA 98328 Re: Items required for completion of Canal Estates Dear Mr. Randles: Per your request, the Community Development Department reviewed the land use conditions of approval for Canal Estates, and find that there a few items that need to be completed before we will issue the final building permit. Landscaping in the restricted disturbance area, along the western property border needs to be restored and completed. This will require creating a minimum 3 to 1 slope and removing the sediment that has been placed there during construction. Following the grading this area shall be hydro-seeded and a straw cover placed over the slope. The silt fence must be restored until hydro-seed is established. The approved landscape plan calls for Lelandi Cypress to be planted inside the restricted disturbance area. These trees will also need to be planted. Landscaping in the stormwater facility needs to be completed. The western portion of the storm pond needs to be hydro-seeded and landscape planting completed around the pond. The planter strip adjacent to the west end of the stormwater pond needs to have sod installed. The perimeter fencing needs repaired. The previous repairs have not been adequate. You may need to install a different type of bracket, or some other solution, to prevent it from falling again. The stormwater catch basins will need cleaned prior to final building permit issuance. During construction and home buildout the catchbasins have been filled with sediment from the street stormwater runoff. If you have any questions, please feel free to contact me. I can be reached at (360) 458-8438. Sincerely, Jim Gibson Development Services Engineer cc: Todd Hansen Gary Carlson, Building Official