Loading...
Hall Retaining Wall 062102June 24, 2002 Greg Hall 15807 90th Ave SE Yelm, Washington 98597 RE: Retaining Wall Approval and Conditions Located at Lot 16 of Canal Estates - 15807 90th Ave SE Dear Mr. Hall: This letter serves as an approval for the proposed retaining wall at the above referenced location. You will be allowed to continue the construction of the concrete wall with the following conditions: The footing of the wall must be moved. All parts of the wall must be located outside the 10’ undisturbed area as shown on the final plat of Canal Estates. If the retaining wall’s height is greater than 4 feet a building permit will be required. This measurement is taken from the bottom of the footing to the top of the wall. If a building permit required please contact Gary Carlson at (360) 458-8407. Before placing the concrete for the footing, a footing inspection will be required to verify that all portions of the retaining wall is outside the buffer area. Please call (360) 458-8407 24 hours in advance. If there are any further questions of concern please do not hesitate to call me at (360) 458-8438 or email me at jimgibson@ywave.com. Respectfully Community Development Department James Gibson Development Review Engineer Cc: Grant Beck Gary Carlson