City of Yelm Inspection Form # 1 Tahoma Golf & Country Club Working on Storm System City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 6/19/07 Day: Tuesday Time: 4:00 p.m.  Project Name: Tahoma Golf & Country Club Project Number LID NO.2 Phase 1  Project Description: Tahoma Golf & Country Club Frontage Improvements Contractor's Name: Contractor: RGD  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, warm,: Soils are firm. RGD is on site working on Storm system in parking lot and long Mosman Ave.  2. Contract Time: Last Working Day Charged (Date) Remaining Working Days No Work Day / No Charge  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) RGD is working on the storm system as part of the frontage improvements and parking drainage. Discovery of a septic tank was uncovered. Roger has called to have a vacctor truck vac out septic and RGD will de-commission the tank.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material)  5. Sketch or Paste Pictures Below:    Date 6/19/07 Typed or Printed Name and Title Steve Harrington Signature