City of Yelm Inspection Form # 2 Tahoma Golf & Country Club Working on Storm System
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 6/28/07
Day: Thursday
Time: 4:30 p.m.
Project Name:
Tahoma Golf & Country Club
Project Number
LID NO.2 Phase 1
Project Description:
Tahoma Golf & Country Club Frontage Improvements
Contractor's Name:
Contractor: RGD
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, warm,: Soils are firm. RGD is on site working on Storm system in parking lot and long Mosman Ave.
2. Contract Time: Last Working Day Charged (Date) Remaining Working Days No Work Day / No Charge
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) RGD is working on the
storm system as part of the frontage improvements and parking drainage. Discovery of a septic tank was uncovered. Roger has had a vacctor truck vac out septic and de-commission the
tank. Report is going to be faxed to CDD office.
Summary of Field Testing (Note failing tests and any retests. Condition of material)
5. Sketch or Paste Pictures Below:
Date
6/28/07
Typed or Printed Name and Title
Steve Harrington
Signature