Samantha Ridge Second ReviewIPM.Note
Samantha Ridge Second Review
Steve Harrington
Jim Gibson
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON
Samantha Ridge Second Review
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON
Steve Harrington
'jack long'; 'Jeff.mcinnis@petraeng.net'
Samantha Ridge Second Review
Jack and Jeff -
I have attached the second review for the above referenced project. I would suggest that we have a meeting about these comments before you revise the plans. I want to make sure the
comments are clear and you understand what the City is expecting with these comments. There is at least one comment that may have significant impacts to your site plan. Please let
me know when you would like to meet. I still have time on Friday or Monday to schedule a meeting.
Jim Gibson P.E.
City of Yelm, Development Review Engineer
PO Box 479 Yelm,WA. 98597
Ph. 360.458.8438 Fx. 360.458.3144
jimg@ci.yelm.wa.us
_____
From: jack long [mailto:jacklong@pacificfrontierllc.com]
Sent: Wednesday, January 23, 2008 11:32 AM
To: Jeff.mcinnis@petraeng.net; Jim Gibson
Subject: jack long
Jim,
Just checking on letter status.
Jack Long Jr
jacklong@pacificfrontierllc.com
www.pacificfrontierllc.com
<DC90029353CCCD468AA2A2858FFCD8F555C90C@server1.ci.yelm.wa.us>
<000001c85df6$a5940b60$0300a8c0@Sarah>
<000001c85df6$a5940b60$0300a8c0@Sarah>
Samantha Ridge Second Review.EML
Jim Gibson
Jim Gibson
11.0
05-0770 Review No. 2 012008
05-0770 Review No. 2 012008
'jack long'
SMTP
jacklong@pacificfrontierllc.com
jack long
'jack long'
jack long
'Jeff.mcinnis@petraeng.net'
SMTP
Jeff.mcinnis@petraeng.net
Jeff.mcinnis@petraeng.net
'Jeff.mcinnis@petraeng.net'
Jeff.mcinnis@petraeng.net
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
SMTP
steveh@ci.yelm.wa.us
Steve Harrington
STEVEH
05-0770 Review No. 2 012008.pdf
(360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 January 20, 2008 Jeff McInnis Petra
Engineering 535 Dock Street, Suite 213 Tacoma, WA 98402 RE: Samantha Ridge-City of Yelm Project No. PRD-05-00770-YL Second Review of Civil Construction Documents Mr. McInnis: The City
of Yelm has completed the second review of the proposed Planned Residential Development. Your application included: ?? Transmittal ?? Comments regarding Initial Review letter from City
of Yelm ?? Full Size Plans ?? Drainage and Erosion Control Report ?? Operation and Maintenance Plan We have reviewed the plans for compliance with the City of Yelm Development Guidelines,
the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. I would
recommend we have a meeting to discuss these comments before you revise and resubmit the plans. Drainage and Erosion Control Report: 1. The report does not include the correct predevelopment
storm event summary. It appears that the post development summary was included with the wrong header. 2. The stormwater report does not include the disturbed pervious area of the project.
Please include this area in the calculations. 3. The report shows 3 stormwater basins included in the basin map. Please include information on all stormwater basins. This should include
calculations and assumptions that have been made with these basins. 4. The report should include a level pool routing that includes the routing of the post developed storms and the predeveloped
release rates. It appears that each storm has been routed in the hydrograph starting at elevation 330.00. Typically the 10 year storm level should be starting at the top of the 2 year
storm. 5. The report should include the orifice sizing calculations. 6. The stormwater design should include an overflow for the pond that has been sized to accommodate the 100 year
design flow.
January 20, 2008 Page 2 of 3 7. The City of Yelm conditions of approval require you to get a Department of Ecology Discharge Permit for discharging to Yelm Creek. In the past Department
of Ecology has questioned the Vortechs treatment device. It currently does not meet the DOE requirements of basic treatment. It is approved for pretreatment only. 8. Please provide conveyance
calculations for the level spreader piping. 9. It appears that there are many utilities under the stormwater pond. We can not maintain these pipes when they are under the pond. Sewer
Plan Review: 10. The number of tanks planned for this project (29) must be reduced. Please use larger tanks. This same comment was made on the 1st review when only 15 tanks were planned.
11. The tank sizes need to be shown on the drawings. The step tank sizing must be in conformance with Department of Ecology Criteria for Sewer Works Design Manual. 12. A 12” sewer main
is planned for future capacity (not shown on the drawings). This new main was to be installed next to the existing main. Please contact City to discuss installation coordination. 13.
Please include all updated sewer details pertaining to this plan. 14. Sta. 4+92.50 needs an end of line clean-out. 15. For clarity, all pressure lines going from the tanks to the main
are called “service lines”, not force mains. 16. Please show all gravity side sewers. 17. All Pump Control Panels will need to be mounted on remote posts. 18. Please show the location
of all service line valve boxes (Carson boxes). 19. Please show the location of hose bibs to enable servicing of the STEP Tanks. A hose bib is required to be within 50 feet of a tank.
20. The reclaimed water line is not labeled on the plan. It appears that there is a utility main running under units 5 and 13 and the stormwater facility. If this is actually the reclaimed
water main then you will not be allowed to construct the buildings on top of the main. This may also apply to the electrical easement that is along side of the 20’ utility easement.
Stormwater and Grading Plan Review: 21. Please revise stormwater table callouts for type 1 and type 2 catch basins. 22. The storm report states that the roof drains are going to be routed
to the stormwater system. Please show the roof drain leaders and connections to the stormwater system. 23. During review of the plans I was not able to find the min 2% call out for the
driveways. Water Plan Review: 24. When a property has a reclaimed water main running through it, all of the water meters will need a Reduced Pressure Backflow Assembly installed following
the water meter. 25. Sta. 2+17.39 -the sewer is too close to the water main. These must have 10 feet of horizontal separation and 18” of vertical separation. 26. From Sta. 0+54.45, the
new water main will need to be run straight to the existing main under Crystal Springs Road. The connection shall be a hot tap to the existing main. The project will need to cut and
cap or plug the old main at the gate valve under Crystal Springs Road. 27. The valves shown on the one inch service lines should be Corp Stops, not gate valves.
January 20, 2008 Page 3 of 3 28. The irrigation shows the backflow assembly before the water meter, this needs to be behind the meter. 29. Please label the water main for removal. I
was unable to locate the callout your response refers too. Irrigation Plan Review: 30. Irrigation plans have not been included in the construction drawings. Please submit irrigation
plans with the next submittal. Misc Comments: 31. The City of Yelm no longer allows individual mail boxes clusters. Only metal CBU’s are approved for use in City of Yelm. Please remove
the old City of Yelm detail and replace with CBU detail from manufacture. This location must also be approved by the Yelm Postmaster. Please submit a signed plan with the Yelm Postmasters’
approval on it. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports.
The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly
expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department
Respectfully, Jim Gibson P.E. Development Review Engineer cc. Jack Long, 115 5th Street NE, Auburn, WA 98002