Loading...
Project Narrative 001Crustal Sorines Project Narrative The Crystal Springs project will involve 29 proposed multi-family units and the retention of one single-family residence. The proposed units will be developed as several multi- family buildings of not more than 6-units per building. None of the units, including the existing house, aze proposed to be on their own lots but will remain on the parent pazcel. The lot lines shown on the site plan are intended to depict the siting of the buildings in relation to a yard area, and not to depict proposed lot lines. In order to achieve the density stated above, the Planned Residential Development process is being utilized per the City of Yelm Code 17.60. As the density will slightly exceed the allowed density per the PRD code, the bonus density of 20% allowed in Section 17.60.140 is also being sought. As the project is adjacent to Yelm Creek, precautions have been taken to minimize the affect on this water of the state. Densities have been calculated within the setback and do not exceed the required 2 units/acre. Additionally, the environmental processes required for development within the buffer have been undertaken and aze included with this submittal package. The project will require stormwater detention, treatment, and release to Yelm Creek per the City of Yelm requirements and the requirements of the 1992 Department of Ecology Surface Water Manual for the Puget Sound Basin. Sanitary Sewer will be provided by way of a STEP system as depicted on the civil engineering plans submitted under sepazate cover, and domestic water and fire systems will also be provided and are shown on the referenced civil engineering plans.