Loading...
05-0770 Crystal Springs Water Land Use 112906THE From: Edward Smith Sent: Wednesday, November 29, 2006 4:09 PM To: Jim Gibson (jimg@ci.yelm.wa.us) Cc: Kevin Ray; Steve Harrington; Tim Peterson Subject: Crystal Springs Planned Residential Development Plan Review.doc           THE PROJECT’S NAME: Crystal Springs Planned Residential Development Date: 29/Nov/2006 1.   Three stories buildings are required to have a BACK FLOW DEVICE ASSEMBLY behind the water meter for premise isolation. 2.   Is the RECLAMIED WATER going to be used for the irrigation on this project? If it is, all the water meters on this project will need a REDUCE PRESSURE BACKFLOW ASSEMBLY to protect the domestic water system, behind the meters. 3.   At units 1-6 is the water meters going too be placed over the SEWER MAIN? They need too have a ten foot separation. 4.   Where are the water meters for units 19-25 going to be installed at? 5.   What are the water details and water main size? 6.   The well needs to be abandoned per DOH/DOE regulations. 7.   The new fire hydrant need to come off the new main, not the ten inch AC.main.                                                                Kevin’s 8.   Units 23-29 will require a REDUCE PRESSURE BACKFLOW ASSEMBLY. I have observed standing water during the heavy rains of the winter of 2005 – 2006. 9.   The parks area will require a double check valve assembly at the water meters.