Loading...
05-0770 Water Review No 1 083007 From: Edward Smith Sent: Thursday, August 30, 2007 4:14 PM To: Tim Peterson Cc: Deonne Hardy; Kevin Ray; Steve Harrington; Jim Gibson Subject: Samantha Ridge Plan Review Public Works.doc Samantha Ridge Plan Review #1 this was called something else at one time and has changed. ??? City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date: 30 August 2007                                                                   Page 1   Location: Samantha Ridge                                                           Department:  Water   Contractor:                                                                                     Rep: 1. The water main shall be C900 Class 150, not Ductile Iron. 2. The relocation of the existing ten inch water main will not be allowed. This will not give a ten foot separation from the sewer and reuse mains. 3. Need to show all gate valves at the tees. 4. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 5. Where water and sewer lines cross, if 18” of separation can not be maintained, the sewer should be sleeved. 6. Is there going to be an irrigation system for this project? There is a reuse main in the easement on the property. If a reuse irrigation system is , the potable water meters will be require to have Reduce Pressure Back flow assembly, behind each meter. 7. The well should be decommissioned per DOE/DOH regulations and a copy of the report sent to the City of Yelm Water Department.       Reviewed by:  Edward Smith, John I Signed by:    Edward Smith