Loading...
Proposed Recreational Facilities 001P ETRA ', ENGINEERING Crustal Springs Proposed Recreational Facilities The proposed Crystal Springs Planned Residential Development will incorporate three park /open space azeas (please see attached drawing). Park #1 will be located on the north side of the development, approximately 11,820 s.f. This will be the developments main active pazk, consisting of picnic tables, a childreds play ground, as well as open space. pazk #1 will be accessed by a 6 foot wide gravel path staz[ing from anoff-street parking lot then leading to the pazk. pazk #1 will contain a large grass field in closed by a landscaping buffer. - PARK #2 pazk #2 located approximately in the center of the proposed development, will be a passive pazk consisting of 578 s.f. of open space. As mentioned this pazked is centrally located for easy access by al] residents. Park #2 will be well landscaped for passive activities by residents. pazk #3 located on the south end of the development will be an active /passive recreation azea containing 5,634 s.f. including a child's play ground and open space which will be heavily landscaped with trees, bushes, and groundcover.