05-0770 Revised Review No. 1 102307E~ctaer 23, 200'
Jeff c[nnis
Petra Engineering
535 Dark Street, Suite 213
Tacama, ~ 98402
m a anth idge- pity of el Project o. -05- .077. -Y~.
E ISE Initial eview o Ci~ril ~onstr~acion oc~ ants
r. clnnis:
The iffy of 1'elm has campleted the initiaB review of the prapased Planned Residential
Develapment. Yaur applicatian included:
e Drainage and Erasian Qantral Repart
C~peratian and aintenance Plan
Full Size Flans
e have reviewed the plans far campliance with the pity of Yelm Develapment Guidelines, the
C?E Starmwater anual and general standards of civil engineering practice. The fallawing
cements need to e addressed efare the plans may e appraved far canstructian. Qur
camments are summarized law:
(~sn~ <~+~~-s~~~
ta~u~zn. ci.yeLrsx.aa,~~. a€s
e~; cif 1:
24, In order to evaluate crossings, the water and searver should appear in the background an the
plan view.
~5. Please provide curve data for the horizontal curates.
eet Q '! 7:
33. You shoanr ~ street lights on Crystal Springs frontage. Please include all required details for
installation of these lights.
3w The pond detail does not shoanr the proposed access road. The access cannot e
constructed on a 2.1 slope. Please revise.
Octaber 23, 2007 Page 3 of 6
eet 1 e~# ~ ?:
35. The driveway access to the site should be designed using a concrete drive way approach
instead of a paced access to the development. The City uses the concrete driveway
approach to all private access roadways.
ee 12 of 7p
5th. It appears deflection is proposed for the construction of the ~T~ mainline. The City of
1`elm does not allow pipe deflection, please revise.
5~.. The labels on the length of the 1 inch force main are inconsistent between this sheet and
sheet 1.
C}otober 23, 2007 Page 4 of 6
isc, Cc~ ants:
7. The ~4.pro~red for onsfiruction Title Block on all sheets, rr~ust read "e~eloent Review
Bnineer".
77. Please calloufi and show the location for the ail Box duster. These must be CBU Univ.
h~lease coordinate with del Postrraaster for location.
C3ctaber 23, 2007
Page 5 of 6
~. I~lease include and show on plan views, the dry utility joint utility trench easement location
and callout the width of the trench, This needs to e shown on the plan sheets to be sure
there is enough roo for the installation of step tanks and the required building set backs on
site,
cc. Applicant
enclosure: Landscape flans
oc#ober 23, 20t?7
Page 6 of 6