05-0770 Review No. 3 032808arch 26, 2048
Jeff McInnis
Petra Engineering
535 Dock Street, Suite 21
Tacoma, VVA 984Q2
RE: Samantha Ridge- City of Yelm Project No. PRD-05-007?-L.
Third Review of Civil Construction Documents
r. McInnis:
The City of Yelm has completed the second review of the proposed Planned Residential
Development. Your application included:
~ Transmittal
* Comments regarding Initial Review letter from City of Yelm
• Full Size Plans
~ Drainage and Erosion Control Report
• Postmaster Approval
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the
Dt~E Stormwater Manual and general standards of civil engineering practice. The following
comments need to be addressed before the plans may be approved for construction.
irainage and Erosion Control Report:
1. I have discussed the Stormwater report with you on the phone and additional detail will
be added clarifying the pre and past development basins and verifying the calculations
are revised based on the basins.
{aso) ~~s-s:~~s
~~so} ass-~r=r~ ~~
rctuJUr,ci avel,wa.rss
Planning Review:
11. Landscape and Irrigation plans have not been included in the construction drawings..
Please submit irrigation plans with the next submittal.
12. The last review indicated that drip irrigation would be required along the frontages of
Crystal SpringsfEdwards.
Community Development Department
Respectfully,
--,
AMJim Git1SOn P.E.
evelopment Review Engineer
cc, Jack Long, 115 5th Street E, Auburn, A 9$002
March 26, 2408 Page 2 of 2