Loading...
Revised Storm Report~r~;'~` February 22, _2007 Proponent: Mr. Jack Long Contact: Jack Long Pacific Frontier The One Eleven. Building Prepared by: Jeff McInnis, P.E. Petra Engineering, LLC 1306 North I Street Tacoma, WA 98403 Ph: (253) 752-7617 ( STREET E "I~AG0141A; L~"A f 98403 ~ PHC7NE {231752--1#il l 1 ~r'1k {2~3}7b1-8582 i WV4nrV.PETR~ENG.ty ET TABLE OF CONTENTS STORMWATER MANAGEMENT AND EROSION/SEDIMENTATION CONTROL REPORT Section 1-Proposed Project Description .................................................................................................................. 4 Section 2 -Existing Hydrology .................................................................................................................................. 4 Section 3 -Developed Hydrology ............................................................................................................................... 4 Section 4 -Hydrologic Analysis ................................................................................................................................. 5 Section 5 -Conveyance System Analysis &Design .................................................................................................. 5 Section 6 -Special Reports & Studies ....................................................................................................................... 5 Section 7 -Other Permits ........................................................................................................................................... 5 Section 8 -ESC Analysis &Design ............................................................................................................................ 5 Section 9 -Bond Quantities, Facility Summaries, & Declaration of Covenant ..................................................... 6 Section 10 -Conclusions .............................................................................................................................................. 6 Appendix ...................................................................................................................................................................... 7 2 I hereby state that this Drainage and Erosion/Sediment Control report for Crystal Springs has been prepared by me or under my supervision and meets the minimum standards of care and expertise which is usual and customary in this community for professional engineers. I understand that The City of Yelm does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities designed by me. ' ~~. ~" ~ :~~ 4C i Wt's, ~.' ~ ~ ,: ,~ ,.x` I ~'~ ~f" "r: .y, k~ d ~~® X77 ~-'C? N~~~, ,~ ~ ~ S'T'E= \~ au ti EXPlR~S_ p5-24- ~ Stormwater Management and Erosion/Sedimentation Control Report Section 1 -Proposed Project Description This report accompanies the Planned Residential Development (PRD) submittal for the development of the 29 unit mulit-family project named Crystal Springs on Crystal Springs Road in Yelm, WA. The site is located east of Crystal Springs Road in the northern extremity of the City of Yelm, directly across from the intersection between Crystal Springs and Coates Street in Section 19 of Township 17N and Range 2E. The project involves the creation of 29 residential units on 6 lots, approximately 17,000 Sq. Ft. of associated private roads, and the associated recreation tracts and open space areas to satisfy the PRD requirements of the City of Yelm. Section 2 -Existing Hvdrolo The appendix contains apre-developed hydrology map showing the site as it exists today. As can be seen from that map, the site remains undeveloped and covered in grasses and a small number of trees. The overall site proposed for development is 180, 790 Square Feet, or 4.15 Acres. Although the overall parcel is significantly larger than 4.15 acres, the western portion of the site is being segregated through a Boundary Line Adjustment process and sold to a third party. The site is sloped to the east, fairly steeply at the western portion and fairly shallow farther to the east. The site is entirely contributory to the small. creek bed known as Yelm Creek. This creek bed has been dry during the duration of this project, but historically has flowed through the rainy season. There is an associated floodplain to elevation 330 which is noted on the plans submitted with this report. Yelm Creek is considered a Critical Area. A Critical Areas Report has been compiled and submitted by Talasaea Consultants under separate cover. This Critical Areas Report will address the reduction of the CAO buffer to accommodate the proposed design. Section 3 -Developed Hvdrolo In the developed condition, we are proposing the installation of a 22' wide internal road system consisting of approximately 14,622 Sq. Ft. of new impervious. In addition, the building pads will comprise approximately 31,776 square feet of impervious area, with the driveways encompassing approximately 10,247 square feet of impervious area. When tallied, the impervious area created by the project will tofal 56,645 square feet, or 1.30 acres. .The proposed storm drainage system, designed to comply with the 1992 DOE Stormwater Management Manual for the Puget Sound Basin, will include a detention pond at the eastern portion of the project site. This storm pond has been sized to receive runoff from the site. The developed Z, 10, and 100-year storms have been estimated using the SBUH methodology using the Stormshed® software. The pond was then sized to reduce flows to the pre-developed flows of 50% of then-year, and the 10 and 100-year flowrates. Prior to entering the storm pond, the flow will be routed through a Vortechs Model 2000 for stormwater treatment. Once through the water quality device and attenuated by the 6,700. cubic foot storm pond, the stormwater will be released to the Yelm Creek system through a spreader trench system located just outside of the 100-year flood plain elevation. Section 4 -Hydrologic Analysis A hydrologic analysis of the developed conditions has been completed using StormShed software and the SBUH methodology using a Type 1A hyetograph. On-site soil has been classified as Hydrologic Soil Group C as a result of the on-site soil exploration compelted by Gary Flowers, LEG. Although the SCS mapping (included in appendix) shows the site as containing both Spanaway and McKenna soils, the on- site exploration did not turn up any infiltratable soils on the site. The results of the detention analysis, showing the expected runoff values from the impervious areas contributing to the WQ and detention systems, are tabulated below: Event Pre-Develop Flow (cfs) Developed Flow (cfs) Attenuated Flow (cfs) 2-yr/24-hr .1960 (50% - .0980) .6074 .0990 10-yr/24-hr .4183 .9366 .4179 100-yr/24-hr .6667 1.2448 .6660 The detention pond sizing was performed utilizing the rates presented above and is presented in the appendix. The appendix contains the hydrology calculations as well as pre and post-development maps, Section 5 -Conveyance System Analysis & Design The on-site conveyance systems (pipes, and roof drain tightline) have been designed to convey the 25- year peak flows in accordance with the 1992 DOE manual. The simple mannings pipe conveyance analysis is provided in the appendix. As no conveyance issues are anticipated due to the steepness of the site, a backwater analysis has not been performed. Section 6 -Special Reports & Studies A geotechnical report was prepared by Gary A. Flowers, PLLC for this project and has been submitted under separate cover. This report was prepared only for use by the design engineer in designing pavement and for exploration of the feasibility of on-site infiltration. Also a Hydrogeologic Assessment was prepared by GeoEngineers addressing potential; high groundwater flood hazard areas on or around the site. This report was submitted under separate cover. Section 7 -Other Permits Building Permits will be obtained to construct the buildings. Section 8 -ESC Analysis & Design Erosion and sediment control will be provided through the use of silt fence, Catch Basin Protection, and a stabilized construction entrance. Since the site slopes to the southwest, silt fence will be concentrated on the southwest portion of the site. With the soil types .present on the site, a sediment pond is neither practical nor preferred, as runoff will not reach it prior to infiltration. Instead, treatment at the point of .runoff is preferred and will be employed oh this project. The ESC features employed on this project include: • Stabilized construction entrances • Catch basin inlet protection • Silt fence 5 Track-walking and hydro-seeding as necessary. It is important to note that the responsibility for erosion control rests with the contractor, as only he can respond to changing site conditions. The measures included on the ESC plan should be considered a starting point, only. Section 9 -Bond Quantities, Facility Summaries, & Declaration of Covenant These Items will be supplied at the time of complete CD submittal, as will the declaration of covenant. Section 10 -Conclusions The storm drainage system, as designed, will control stormwater runoff quantity and quality and will work well with the proposed residential PRD and the surrounding areas. The detention system will operate in accordance with the requirements of the City of Yelm and the 1992 DOE manual. This system will be designed in accordance with the standards of care and quality typical in this area for projects of this type. 6 Appendix Exhibits 1, Soils Map and description 2. Pre-Developed Hydrology Map 3. Developed Hydrology Map 4. StormshedT"" Calculations, including pond sizing 5. Conveyance Analysis 7 ~~~ / / ~ G~ (,; 1/ i I 1 I !Y / ~/"s>y ~~~ ~ ,i 0 O "' o I o ~ ~ ~ o_ ,II r+~ U ^~ O ~ ~ ~aW Z~~ °a ~ Q ;`` 000 ~ ~ w ° ~ ~t .. m ~,. °~,~ ~~ ,' ~;~ , ~ ~ , ~~ z ~v fii"' < ~ ~ ~ ~~, ~~ ~. ~ v 4 , ~ ~ ,, ^^ VJ ~ ~~ ` S ~,~.. II ~ ~r I f \~_~5~ ~ ~i• ~~, y l ` ~f ~ I ~ A, 1 { i / Y r ~ y f -~. `fi r' ,~ /; ~ ' ~ ~~ ~ :i:S,, i ~ ,,~~ '. ., ~r '~~ . .. *. _ Appended on: 07:13:54 Tuesday, September 12, 2006 Post 100-year Event Summary v nt , Peak Q (cfs) ;Peak T (hrs) ~Hyd Vol (acft) Area (ac) :Method Raintype 6-month 0.3386 7.83 0.1078 1.3000 SBUH TYPElA 2 year 0.5991 7.83 :~ 0.1922 ~ 1.3000 ~. j SBUH TYPElA' 10 year 0.9235 7.83 0.2999 ~ 1.3000 ~ SBUH TYPElA' __ _~ 25 year :_ ~ _ ~ _ 1.0844 _ ~~~ _._ ~ __ . 7.83 _::~ ~ e _ . _ _ m_ ~ 0.3539 ~ ~W: ~ ____ _ 1.3000 ~~ _ _~____ ~ _.. e~ SBUH TYPEIA W __ 100 year __. _ 1.2448 ..__.... ~ 7.83 .__ . 0.4079 _.__ __. 1.3000 :. _...:a __.._._~..... ,SBUH TYPElA Record Id: Post 100-year Method SBUH ____ TYPElA !Hyd Intv 10.00 min ;Peaking Factor 484.00 ;Abstraction Coeff 0.20 ;Pervious Area (AMC 2) 0.00 ac ~DCIA 1.30 ac Pervious CN _ ~ 0.00 ;DC CN ~ 98.00 .;Pervious TC ~ 0.00 min ADC TC 0.56 min Directly Connected CN Calc _ _ _ __ ~~~~~~~~~~~~~~~~~~~ ~~Description ~ ~ ! SubArea Sub cn _ __ .~..._.~.~. ________~~ ~ ._~e ~-__....a.~ ~ _.._ Impervious surfaces (pavements, roofs, etc) 1.30 ac 98.00 __._ ~ _,..__„_DC Composited CN (AMC 2) __,________ _„~~__ ~~~~~ ~ ~ 98.00 Licensed to: Petra Engineering, LLC Appended on: 07:14:05 Tuesday, September 12, 2006 Post 10-year Event Summary _ Event __ __ :Peak Q (cfs)'~Peak T (hrs)Hyd Vol (acft) ,;Area (ac) .;Method Raintype ~ ___. 6-month. : 0.3431 7.83 0.1078 ~~ 1.3000 ~ SBUH ~TYPEIA 2 year 0.6074 7.83 ~ 0.1922 ` 1.3000 'SBUH ;TYPElA _ ~ 10 year 0.9366 ~ ____ 7.83 _ erg _~ ~ 0.2999 _ ___ 1.3000 ~~ SBUH _._~ ~ ~ _. TYPElA 25 year __ 1.0998 _ ____ 7.83 ,- _ .~ _w..._.__ . 0.3539 ... ..._ 1,3000 _ __ SBUH _.~~ __m TYPElA ~._ 100 year w_____ __...~ _ 1.2626 ...._. _____. 7.83 ;___.. __ 0.4079 _ 1.3000 _r....._ SBUH . _...._ TYPEIA Record Id: Post 10-year w ~_ ?Design Method ~ ~ _ ~ _ ~_ ___ _____.~. , SBUH ___ ~. __ _.._... __..__ 'Rainfall type . __ TYPElA~ _~.__ ~ Hyd Intv m.____~ww_ ~_.___..~.,., 10.00 min ~~_~M .._.__~~~:;: .__.;. jPeaking Factor ..._.~.._.. ____..~~: 484.00 ___..___._._.___.....~....__ .._.. __..___. ____ Abstraction Coeff _~ m . __ ~~~ 0.20 ~~~ ~. E ~~.._..._ .......................~.~..,,..,.. _:~ ___.._.._._ _ ,Pervious Area (AMC 2) _~ ...~ ~ 0.00 ac .. _ _.____T _ ~ __._. . ~__~ ~ ; C A ...: 1.30 ac __ ~W_____ ;Pervious CN ~. _.._~~~_ ~__ ~ ~_ ; 0.00 _ _; C N~ _ ___..~.-_~ ._ T.~T_~_____ 98.00 ;Pervious TC _:.__ _--__.:~~ . ~ ___ ~ 0.00 min _ w _ .___.__ __ DC TC __. ~:~.._..~~w 0.86 min Directly Connected CN Calc ` Description SubArea Sub cn ~mm_ Impervious surfaces (pavements, roofs, etc ~ 1.3 w~ 0 ac _ ,_ne~ _._.~ 98.00 _. ~._ _ ~.._... ..._ '; _.~...._. ~__._._ .__.__._~ _ ~ _ .~._.__w _ __.......___..._ ......_._..._ _-__.___ DC Composited CN (AMC 2) ~ ~ _._.._._._ .... 1 98.00 Licensed to: Petra Engineering, LLC Appended on: 07:14:15 Tuesday, September 12, 2006 Post 2-year Event Summary Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) ___ ;Area (ac) ;Method ~Raintype ~6 month : 0.3431 7.83 0.1078 ~ 1.3000 ,3 SBUH TYPElA 2 year 0.6074 7.83 0.1922 1.3000 ;SBUH TYPElA'. _ 10 year 0.9366 ~ 7.83 0.2999 1.3000 ~ SBUH q.~__ TYPEIA' i~ 25 vear : 1.0998 a_~ 7.83 . _ ~; _ ~ 0.3539 __~~ ~~~ 1.3000 . A~_~ _SBUH ~ .. =TYPElA'' 100 year, 1.2626 7.83 0.4079 1.3000_...; SBUH TYPElA Record Id: Post 2-year _~~ _.~ ~ ~ jDesign Method _~ SBUH ~ _.._.~~ __~-W _._~~ iRainfall type ___~~ TYPElA ~Hyd Into 10.00 min Peaking Factor 484.00 '~ _~. ~ ~~ ';Abstraction Coeff 0.20 i~Pervious Area (AMC 2) 0.00 ac DCIA _ 1.30 ac ..?Pervious CN 0.00 DC CN ~ 98.00 Perv ious TC 0.00 mm ADC TC .0.86 min Directly Connected CN Calc .... .._ ...... ~._ _. ~ _. ~____ __...... ~ ~ ~ ~ _...me _...~ ( Description SubArea ~ Sub cn ~ ~ ~ ~~ ~ __~ ~ rt....m ._.~ _.~ a~~ ~ __~ Impervious surfaces (pavements, roofs, etc) 1.30 ac 98.00 DC Composited CN (AMC 2) 98.00 'i'' Licensed to: Petra Engineering, LLC Appended on: 07:14:29 Tuesday, September 12, 2006 Post 6-month Event Summary Event Peak Q (cfs) ,P eak T (hrs) Hyd Vol (acft) :Area (ac) Method Raintype 6-month ; 0.3386 '' 7.83 0.1078 1.3000 :SBUH ~TYPElA 2 year ~ 0 5991 :~ ~ 7.83 :e 0.1922 ~ ~ ~ 1.3000 ;SBUH ~TYPElA __ 10 year ~ _. _ -- 0.9235 ~ ____ __. 7.83 ~ . _.__, ._ ~ 0.2999 .._ ~ ~ 1.3000 _ ~ _~~ ~__. ,SBUH TYPElA -m.~ 25 year _~ ens _~ 1.0844 ; ~. 7.83 ~ _._~. ..~._ 0.3539 ~_.~ 1.3000 . ~~_~ ___ Mm. 3 SBUH ETYPElA' 100 year 1.2448 _ 7.83 0.4079 ! 1.3000 'SBUH ~TYPEIA Record Id: Post 6-month ;Design Method ~ SBUH :Rainfall type TYPElA ~Hyd Inty 10.00 min €Peaking Factor ___ ~ 484.00 ~~,..._. .._._..:mm_.~.__..~~~._ __...__._.._W ~----_~______.~...._.._.~.._ ?Abstraction Coeff ~ ~ _ ~~____ 0.20 3Pervious Area (AMC 2) 0.00 ac 'DCIA 1.30 ac ;Pervious CN ~ . _ 0.00 DC CN 98.00 . ;_ __ ;Pervious TC r 0.00 min DC TC 0.56 min ` Directly Connected CN Calc ': z, e.m~ ~ .,.~ _. e~ ~ ~~ __-_m__ Description SubArea ,. Sub cn ;; ~., ~: ~~. Impervious surfaces (pavements, roofs, etc) 1.30 ac 98.00 DC Composited CN (AMC 2) 98.00 Licensed to; Petra Engineering, LLC Appended on: 07:14:38 Tuesday, September 12, 2006 Pre-100-Year Event Summary Event :Peak Q (cfs) ;Peak T (hrs) s~Hyd Vol (acft) ;Area (ac) Method ;Raintype ii=6-month _ :.m: 0.0526 ; ;:::: 8.17 ~ 0.0374 _ _ ~ 1.3000 „SBUH .TYPElA' _.v~. 2 year _. .._. 0.1960 .__ 8.17 ? _ 0.0981 _ ~~~ ___.T_~ 1.3000 4 .._ ~ ~ ___. ;SBUH ~TYPElA' 10 year _ . ~ 0.4183 -_ 8.00 ~ 0.1884 1.3000 ,SBUH :TYPEIA . . 25 year _ e ~ ___ , 0.5409 ~ :::: ~ ~ 8.00 ~ P .~ ~ 0.2364 .~ ~ 1.3000 . ~ ~~. ~:~:. SBUH TYPElA' _._..___ ~. 100 year ~......_ _._.._,_ __. ~ 0.6667 _.._ ~ ~_.._.__ 8.00 ~ ~ ~v.__~~: 0.2856 .... W.:~_r .::: 1.3000 ...__. ~ ~ _~ ~ ::~.._ ;SBUH ;TYPElA Record Id: Pre-100-Year ~Desi n Metes _._ __~ _ ~~ g hod _~ ~ __~.~_ _ .._w ~ SBUH ... Rainfall type TYPElA Hyd Intv ~ ~ 10.00 min ;Peaking Factor 484.00 ~ Abstraction Coeff ! 0.20 ;Pervious Area (AMC 2) __ _.. _ 1.30 ac DCIA 0.00 ac _ _ .._ ___~ _ Pervious CN ___-___ 87.00 ~ ~ ~~ . DC CN v_.__~~ 0.00 ___ ~. _______ :Pervious TC r-._. 19.32 min _~ _.. ~ ~ ~ _ _.... r ADC TC ~ __ 0.00 min __ ~ Pervious CN Calc ~~ _~. _~~_ ~~_~___:~ _~~.. ~~ :: .::~ _ ~ W:_.~. __-~ ___-~ Description ~ SubArea Sub cn '` Herbaceous 1.30 ac ~ 87.00 '~` Pervious Composited CN (AMC 2) 87.00 `? Pervious TC Calc _~. ~~ n_~ ~.~ Type ~ Description E Lengt~~ ~~ ~~ ~~~~~ ~ ~~ h ~ Slope ~ Coeff MLSC ~ TT __.__~ ._._ ~mm _._~_.. ~__. _~.__.~ _W.:~ __.~W ._ ____..: ,__ _::.~..__._~~.~.._~ Sheet ;Dense grasses :0.24 X50.00 ft $22.00% ''0.2400 X2.00 m ;3.97 min ~_._._~ _ _w .....~~ .....__~ ...... ~__ ~ . ~._.__.....__ Sheet Dense grasses :0.24 ;100.00 ft (3.00% ~0 2400 (2.00 m 15.35 min Pervious TC 19.32 mm Licensed to: Petra Engineering, LLC ~~ ~~~~~ Appended on: 07:14:47 Tuesday, September 12, 2006 Pre-10-Year Event Summary ~ Event ; Peak Q (cfs) ;Peak T (hrs)Hyd Vol (acft) ;Area (ac) MethodRaintype __ ',6-month; 0.0526 E 8.17 0 374 1.3000 ~ SBUH TYPElA 2 year 0.1960 _ 8.17 0.0981 1.3000 SBUH TYPElA _ 10 year ~ _ ~_ 0.4183 ~ ~- _ - ~ ; 8.00 ~ ~ ~:._. __._:~:. 0.1884 : : .. _ .. _._.~:: 1.3000 __ :: -.::::.: SBUH ~~:_e~ - :...::...._... TYPEIA'' - ___ 25 year _ _~___ 0.5409 e... 8.0 0 . __-_-_ _.. 0.2364 _~ 1.3000 _ _ SBUH _. ~ TYPEIA F100 year; 0 6667 8.00 0.2856 1.3000 SBUH _TYPElA Record Id: Pre-10-Year Desi ~n Method ~~ g ~~ SBUH Rainfall e _ typ , ___..~ ~ TYP E l A Hyd Into 10.00 min Peaking Factor ~ 484.00 ~ ~ ,A raction Coeff ~ 0.20 ;Pervious Area (AMC 2) 1.30 ac DCIA 1 0.00 ac ;Pervious CN 87.00 DC CN ~~ ~ 0.00 . ~ _~.. ~ n._.._._ _._ Pervious TC __ ____.~ 19.32 min _.._ ~.___ _...~ DC TC ___. ~_ ___v _~~ 0.00 min ~ :: ~W W Pervious CN Calc :- ~ ~:: . . _ _ ` Description ~~ ::W ~ ~ _ ~ _ _ _ ~~ m:m ~ ~- e~ _ ~ SubArea a . ~d - ~ ~e ~__ Sub cn ~ , __..m _____._ ( Herbaceous __. .A. _ m _. ~.._ ~ ~ 1.30 ac _.em _~_~ 87.00 Pervious Composited CN (AMC 2) 87.00 __ ~ _.~:T.~__ _ _ ~ ~ - ~_ ~ _ Pervious TC Calc _____ ..~ m~ ---._~ ~~m ~ Type Description _~.~ ~~ ~ _ m_~ i Length Slope ;Coeff ~s ~ Misc ~ ~~ e~,~ ~~ TT _._..~ _ __._~ ~ ._ ._...~.~ ._.. ~ Sheet Dense grasses :0.24 ~ , ~ ~.._....~ _ ~. 50.00 ft X _.._.~u ~_.~:.n _. ~ 22.00% 0.2400 '=.2.00 m ~w ..____ ... ~._.._ ; 3.97 min =Sheet Dense asses :0.24 ~ gr =100 00 ft X3.00% :0.2400 2.00 in , ..~... ~~15.35 min ~ Pervious TC =19.32 min '' Licensed to: Petra Engineering, LLC Appended on: 07:14:56 Tuesday, September 12, 2006 Pre-2-year Event Summary != Event ;Peak Q (cfs) £ ak T (hrs) Hyd Vol (acft) ;Area (ac) ;Method Raintype _. ~6-month 0.0526 _ 8.17 ~ 0.0374 ~ 1.3000 SBUH _TYPElA 2 _. year W~.~ 0.1960 8.17 0.0981 :.3000 ~ SBUH TYPElA 10 year ___ ~ ; 0.4183 ~ w_e _ ~ 8.00 ~ _ _.Pe~ ~ 0.1884 _ _. ____ 1.3000 ~ _____a_ m ~ SBUHTYPElA 5 year - __ _~- 0.5409 ~_ m~ .: ~ 8.00 _~ _. ~ 0.2364 I :~ _.ne 1.3000 __ ~ _~ _~ SBUH TYPElA' 100 year 0.6667 8.00 0.2856 1.3000 'SBUH 'TYPElA Record Id: Pre-2-year Design Method ~ SBUH Rainfall type ~ TYPElA #Hy I tvm~ ___.,_~~__,_. _. 10.00 min `Peaking Factor 484.00 ;Abstraction Coeff 0.20 ;Pervious Area (AMC 2) t x 1.30 ac , ~DCIA 3 0.00 ac _ Pervious CN _ _ _ 87.00 __ _ _ _ ___ =DC CN 0.00 Pervious TC _ .__..:m ~ _ _ 19.32 min _ _w ~: m~ _ _ _ DC TC ~ _____:- ___.. ~ ~_ 0.00 min _. _. ~, ~~ Pervious CN Calc ~ ~ Description ~ 1 ~~ SubArea Sub cn ~_~ _ ~~~~~~ Herbaceous ~_~~ ' ~ ~~ 1 3.0 ac ~~~ ~~~~ 87.00 ~~_~~' ~ __~~ ._.__.__ _ ~ _~ ___ ~:.._.. ~..w~__.__._~~ ___. ~ _ : _.~:~: __.~.. ~~mm .~ Pervious Composited CN (AMC 2) ~ ~ £ _ _. _~ _...~:_._._. ~ ~, 87.00 } W Pervious TC Calc _ _.m_ Type Description ~ Length ~ Slope Coeff ~ Misc TT ''' =Sheet ,Dense grasses :0.24 ~ ?50.00 ft ,22.00% :;0.2400 2.00 m ;3.97 min }Sheet ;Dense grasses :0.24 €100.00 ft X3.00% .;0.2400 ;2.00 m ;15.35 min Pervious TC 19.32 min Licensed to: Petra Engineering, LLC Appended on: 07:15:07 Tuesday, September 12, 2006 Record Id: MH Release Descnp. ;Prototype Structure :Increment ;0.10 ft Start El.~~ 100.0000~ft Max El.~ ;105.0000 ft` Onf Coeff :0.62 ;Lowest Orif El. (_ _~ _ _ _ 98.00 ::Lowest Diam' 1.5820 in ;Dist to next (2.2300 ft , ED2 ~ ~ 5.0684 in :;Dist to next ' 0.3100 ft~.~ _...~~_. _ ...._W:_~__.... ~._..~:~w _____~:~ _ ~ ~_ _.., _ ....~ D3 ;0.5859 in ,Dist to next '..0.0000 ft ~I02.3000 ft -.:0.2874 cfs :1114.9000 ft 1.3037 cfs' ._._ ._ ..._...~. .._,._~ ....._. _m:.: _..,...:_ _.._. ::3.02.4000 ft 0.3926 cfs -105.0000 ft :l .3267 cfs =102.5000 ft0.4696 cfs :145.1000 ft 1.3493~cfs! _. _._...~~~ rv, ~ __ ~~ ~1~5.0000 ft_1.3267 cfs Licensed to: Petra Engineering, LLC Appended on: 07:15:15 Tuesday, September 12, 2006 Record Id: N-001 '=Descrip: Prototype Record.:Increment :0.10 ft '`Start El. _ ;100.0000 ft mm Max El. '105.0000 ft ;Storage Node Pond Discharge Node MH Release Record Id: Pond ~Descrip: :Prototype Record ;Increment X0.10 ft ;Start El ;100.0000 ft ;Max El.103.0000 ft' __ __ __ ~.__ ;Length ;17.3300 ft Width :50.0000 ft ,,Length ssl ;3.OOh:ly jLength ss2 ~ 3.000Oh:ly ssl 3.OOh:lyWidth ss2 3.000Oh:1 Record Id: MH Release ,(Descrip: __ ;Prototype Structure _ Increment ;0.10 ft Start EI _ _ __._......_ 100.0000 ft S __ ~_ _ _ .. _. . Max E1. ..~ _.m._..~ ~' 105.0000 ft i ~m Onf Coeff _ _ _._.. ~0 62 ...__ ~ ___ ~ _ ._.... :~.~~ 'Lo west Onf El '98.00 !Lowest Diam ;1.5820 in _ ;Dist to next ~.~.._.~W ~ ._..: 2.2300 ft _ ~D2 ~~ ~_ .__ 15.0684 in ~._~._--____~~. ;Dist to next ...x_.~..~_..... X0.3100 ft ~.~..._ _.~ ..~~ =D3 ...._._..~__m.m_ 0.5859 in _ ~_.~. _ ~__._.~ Dist to next , X ~ ..____... _..._. 0.0000 ft .~..~ Licensed to: Petra Engineering, LLC PIERCE COUNTY STORMWATER MANAGEMENT and SITE DEVELOPMENT MANUAL 6.5.9 Correction Factor to Pond Volume When designing runoff quantity control facilities, the Engineer shall apply a correction factor to the design volume when using a unit hydrograph method to model 24-hour storm events. The correction factor is shown in Figure 6.1 and shall be used to increase the proposed pond volume by the applicable percentage, i.e., 10,000 c.f. + 30% = 13,333 c.f.. The pond depth may not be increased and the orifi may not be changed. This factor is based on site impervious cover. If the facility is to serve for water quality also, the pond depth cannot be increased beyond the criteria established in Chapter 7. NOTE: This factor does not apply to infiltration facilities or facilities sized with a continuous simulation model such as HSPF however, the design engineer is encouraged to incorporate an appropriate factor of safety based upon the level of detail included in the model. FIGURE 6.1 Volume Correction Factor to be Applied to Runoff Quantity Control BMPs Based on Site Impervious Cover ~` .~ 6-10