Loading...
Storm Drain Report 001ni?aizoos Is:a2 Fax znszsaazon saav a oaooeue CITY OF YELM THURSTON COUNTY WASHINGTON l9 or~,iu~o Q~~~~M~NP~~ STEVENS STREET NW ROADWAY IMPROVEMENTS STORM DRAINAGE TECHNICAL INFORMATION REPORT (TIR) G&O #06436 NOVEMBER 2006 Greg ~ Osbo~e, Imo. CONSULTING ENGINEERS )pl pExiFA •KNUE NORM SNS 300 YX~1LE, MRNM4IIIN 98109 ~ (IOq IDX-OCM NOV-29-2006 17:17 2062833206 96% P.02 11/29/2V06 16[32 FAN [0628332QC BRAY fi OS69RIIE CITY OF YELM THURSTON COUNTY WASHINGTON STEVENS STREET NW ROADWAY IMPROVEMENTS STORM DRAINAGE TECHNICAL INFORMATION REPORT (TIR) GBcO N06436 NOVEMBER 2006 Gray ~ Osbo~e, Imo. GONSULPNG ENGINEERS ion oEVrz9 nKNUE xoviN wire zoo $CAiRE. WnSHINLION 9!109 .($9fi) 1E1-9E60 NGV-29-2006 I7: 17 2062033206 96Z 1~ or~3/020 P.03 11/29/20 GS 1b 33 FHX :46-^_833Gn6 i3FAY F OGBURIIE TABLE OF CONTENTS PROJECT OVEAYIEW ........................................................................................................ ...1 Drainage BasinS .................................................................................................... ...2 Site Hydrology ...................................................................................................... ...2 Infiltration Design ..................................................................................... ...4 Water Quality Treatment ...................................~...,,.......,......................... ...5 CONDITIONS AND REQUIREMENTS SDMMARY ................................................................ ...6 Mitdmum Requuement #1 - Prepazation of Stormwater Site Plans .................... ...6 Minimum Requrement #2 -Construction Stormwater Pollution Prevention Plan (SWPP) .........................................~...,..................................................... ...7 Minimum Requirement #3 -Source control of Pollution .................................... ...7 Minimum Requirement #4 - Preservation of Natural Drainage Sys[ems and Outfal]s ...........................................~..,,..................................................... ...B Minimum Requirement #6 - On-Site Stormwater Management .......................... ... 8 Minimum Requirement #6 -Runoff Treatment BMPs ........................................ ...8 Water Quality System ..............................~.,.....,........................................ ...8 Minimum Requirement #7-Flow Control ........................................................... ...8 Design Criteria-Performance Standards ................................................ ...8 Flow Control System ................................................................................ ...8 Conveyance System Analysis and Design ................................................ ...9 Minimum Requirement #8 -Wetlands Protection ............................................... ...9 Minimum Requirement #9 - Basin/W atershed Planning ..................................... ...9 Mimimum Requirement # ] 0 -Operation and Maintenance ................................. ...9 Optional Guidance #] -Financial Liability ......................................................... ...9 Bond Quantities, Facility Summaries, and Declaration of Covenant....... ...9 Optional Guidance #2 -Off-Site Analysis and Mitigation .................................. ...9 SPECUL REPORTS AND STUDIES ..................................................................................... .lO OTHER PERMRS .............................................................................................................. . 10 LIST OF TABLES No. Table Paee t Parameters Used for bfodeling and Resulrs ............................................................4 2 Detention Model Results for Roadway Improvements ...........................................6 3 Bioswale Design .................................................~....,...........,...................................6 LIST OF FIGURES No, Fieure Follows Paee 1 Location Map ...........................................................................................................1 2 Drainage Basins ..................................................... ..........................1 NOV-29-2006 1?:1B 2062833206 96Z 00a/O.p P.04 11/29/20V6 16:35 FAX 2V E2K33'.g6 ORh1' 6 OSHONNE i9 x'45/020 LIST OF APPENDICES Appendix A - Sto[mwa[er Modeling (SBUH) Appendix B - Stonnwater Modeling (W WHM) Appendix C -Design Drawings NOV-29-2006 17:18 2062833206 96'/. P.05 11/29/2006 18:33 FAH 2~i n'293320d GRAY ® OS60RaE I¢j 045/V.V PROJECT OVERVIEW The Stevens Sveet NW Roadway Improvements comprise approximately 9501ineal feet of road improvements from NW Edwards Svee[ to North 1" Sveet (see Figure 1). The project is sepazated into a northwest Bagmen[ and a southeast segment for stormwe[er modeling. This Technical Information Reporl (TIR) is for both segments. The notthwestem segment is approximately 7501ineal feet from N W Edwazds Sveet to the former railroad crossing. The southeast segmrnt is approximately 2001ineal feet from the former railroad crossing to North 1"Street. This project provides for the roadway reconstruction and includes storm drainage improvements, curbs, gutters, sidewalks, landscaping, illumination, and water system improvements. The segment of Stevens Street NW evaluated ih this study lies in the Yelm Creek watershed. Surface flows generally drain northeasterly m Yelm Creek. The road is in flat terrain, and crosses one high point at the former railroad tracks (Ste. 8+10). This rise creates two separate subbasins within the project. The two subbasins associated with the project aze shown in Figure 2. Based on the geotechnical investigation, the land in the area consists of cobbley sends end gravels. Because of the relative flat slopes N and adjacent to the project, and the porous soils, there is little offsite flow onto the project comdor. Currently off-site surface water adjacent to the project generally infiltrates. Runoff from an existing paved pazking lot on the northeast side of the project flows away from Stevens Street and runoff from a parking lot near the Stevens Sveet /Railroad Sveet intersection flows into an existing off-site storm system, with some flows also i~(vating. Runoff from the gravel/paved mini-storge lot (southeast subbasin) cutrently flows onto North la Street, then easterly towazds Yelm Creek via existing storrtt pipes and/or existing roadside ditches. There is no existing on-site storm collection, conveyance, vestment, or detention facilities. Runoff from the existing roadway (northwest subbasin) infilvates into the ground adjacent to the roadway. The project consists of reconstructing the roadway to create a 32-foot wide, paved road with curbs end 5-foot sidewalks on each side. Planter strips will also be located along a majority of the project. In accordance with the DOT Highway Runoff Manual, ]992 Depamnent of Ecology Stormwater Management Manual, end the 2001 DOE Stormwater Management Manual the improvements will require both vestment and detention. The existing road is typically I S feet wide, with some sections of narrow gravel shoulder on either side. The increase in impervious area that creates the detention requirement comes from both the widened pavement and the sidewalk. The project adds 20,251 squaze feet of impervious area. This means the project will have to comply with Minimum Requirements #1 through #9, which include detention and water quality vestment. The City of Yelm has directed that the requirements of the 2001 Washington State Department of Ecology Stormwater Management Manual for Western Washington will be applied to this project The project proposes adding more then 5,000 square feet of new impervious area; therefore, Minimum Requrements #1 through #10 apply. Initial modeling was completed using accepted methods for the Highway Runoff Manual and City aJYelm 1 Sfeveru Sbeef NW Roadway lmprovementa Storm Drainage TJR November 2006 NOV-29-2006 17:10 2062033206 96: P.06 71/?9/2ppg 18:"u3 FaX FVG26332u6 ii R.4V fl OSEOFIIE lei 967/r~20 CITY OF YELM STEVENS STREET IMPROVEMEN75 FIGURE I VICINITY MAP ~ !l QM9 ~~~~ TID NOV-29-2006 37:18 2062833206 96% P.07 11/f@/200E 1&_33 FAX 2062933206 6F.4Y F 6S809HE ~ pq9/0?0 9 ®~~yyp~~ U p e. a«....n ww 6G ' I - y ' I L~3~vJV1 N1bOM ' I I ie/(~ I I I 1 I ' I __ I ' I I I f I ~~ ii ° = I ~ I ~ / ~o~ba ~ I II` ~~ P - -_ i ~ i_ _ ~I ~! ~ ~'1 I -- I I ~ 1- I I ~ I ' c~Y~ it I Q -. ~f I ,~ ~ i ~s _ ii I , ~' I I ~ ~ ~s~xs ~ j ~ gFm ~ '4 I y ' I 6 ¢} ®G i 6 Ja woy~~ m €` I I -- go ~, v 193bLB 8 M03 MN ~ ~ ' ' I NOV-29-2006 17: SB 2062833206 9fiZ P.08 11 /23/20u8 18[33 FAR 2V 62833248 6fl AY ~4 U°BOFIIE ~J u03~0?0 Gray & Osborne, Ina, Conru/zing Eng7neers the 1992 DOE manual (SBUH model). The fatal facility design was modeled ruing the model adopted in the 2001 DOE Manual (W WfIIvQ. This report uses the outlino of the 2001 DOE manual for the following minimum requirements. The City of Yelm has permit authority for the projec[ for general permits. DRALNAGE BASINS This report identifies two subbasins, northwest and southeast. The Stevens Street NW Roadway Improvements are included completely in these two segments and are discussed in this report, These two drainage basins are identified through topographic and existing conveyance informatien for this portion of the project. These basins are described es follows: The northwest basin is shown in Figure 2. The northwest bazin is approximately 1.05 acres total, with approximately 0.01 acres westerly of Stevens Sueet NW contributing off-site flow to the project. Stotmwater runoff flows generally to the east toward Yelm Creek. Surface flows at the northwest end of the project are collected by the existing system of catch basins in NW Edwards Street prior to flowing into the projec[ area. This existing storm system flows easterly towards Ye1m Creek. The southeast basin is shown in Figure 2. The southeast basin is approximately 0.22 acres, with approximately 0 acres contributing off-site flow to the project. Stormwater runoff flows generally to the southeast towards North First Street. Surface flows are collected in catch basins and roadside ditches and wnveyed to Yelm Creek. SITE IdYDROLOGY Design storms areaway to characterize and quantify the likelihood of a rainfall event. Different models use different methods to determine these events. Two methods used for modeling in Washington State are the single event method and a continuous record method. The single event method employs a 24-hour storm event and is derived from the azea NOAH atlas. A certain amount of precipitation over a 24-hour period is related to the probability of that event happening based on historical precipitation data. For Yelm, the statistical likelihood of having a storm event with _ inches of rainfall in a 24-hour period is once every 2 years. 'T'his then is known az a 2-year, 24-hour event. The computer model commonly used far the single-event method is called the Santa Barbara Urban Hydrograph (SBUH) and is based on the Soil Conservation Service mode] TR-55. The continuous record method does not limit the thne to 24 hours or any other set "event" timeframe. Instead, the continuous method examines historical precipitation records and determines the statistcal likelihood of wet weather conditions that may last for several days, or for less then 24 hours. This requires more detailed datA input for precipitation records and much more computing power. The continuous record model used by the 2 Ciy ofYelm Novembv 1006 Srevenr Street NW Roadway lmprovemenrr Storm Drainage T1R NOV-29-2006 14:10 2062833206 96Z P.09 11/29/20 V6 10'.33 FAX Pun'2633209 GRPY & 0£FO6HE V70101~~~~ Grey R~ Osborne, Inc., Coruuhing Engineers 2001 DOE Manual is the Western Washington Hydrology Model (W WHM) and is a version of the Hydrologic Simulation Program Fortran (HSPF). Current regulations may use one or the other, or both. Initial planning and design for this project was completed using the SBUH model. Modeling far final design was completed using W WHtvf. A Santa Bazbaza Urban Hydrograph (SBUH) s[ormwater modeling program war used to initially siu the infiltration facilities. The program takes impervious surface, soil type, slope, length of flaw path, rainfall amount and rainfall pattem, end determines the peak runoff rates. The slope of the subbasins ranges from 0.5 to 3 percent, and averaged approximately 2 percent, The rainfall pattem in the northwest cozresponds to a Type 1 A storm hyetograph. This has a gradual inuease at first, followed by a spike when it reins heavily for ao hour or two, and then tapers off to a low level of rain for the remainder of the 24 hours. The Soil Conservation Service developed the distribution of rainfall over the period of the 24-hour storm from actual rainfall data. Based on the precipimtion charu in the 2001 Westem W ashing[on DOE Manual, a 2-year, 24-hour storm in the Ciry of Yelm is _ inches of rain; a 10-yeaz, 24-hour storm drops _ inches of rain; and a 100-year, 24-hour storm drops _ inches of rain. See the table below for the input parameters. To comply with the 2001 DOE mauuel, the basins were modeled using the Westem Washington Hydrology Mode] (W WHM) developed by DOE. For front design, modeling data from both methods are presented below. Ciry oJYelm 3 Srcrent StreerNWRoadwcy lmprovemenrr Storm Drainage T/R November70a6 NOV-29-2006 17:18 2062833206 96: P.10 71/29/^. sH~n 18:Oa F.9X 2V62833.ri8 eHAY A 6SBUfiHE ~9 011l~iP4 Groy & Osborne, Inc., Consulting Engineers TABLE 1 Parameters Used for Modeling and Results In171tration Desfgo The infilvation requirement limits flows for various storm design events. The developed project 2-year flow is limited to one-half the predeveloped project 2-year flow. Off-site flows ere included in the routing but are not pan of sizing detention facilities. The 4 Clry ofYelm November 2006 Stcoenr StreerNWRoadway Improvements Slarm Drainage TfR NOV-29-2006 17:1n 2062833806 96': F.11 As well as calculating peak runoff rates, stormweter modeflng programs route the design storms through a specified i~ltraticn facility. The SBUH model was used for initial sizing and the final design was routed through W WHM to assure compliance with the 2001 DOE Manual. 11/T3/2006 16.90 FAX 206?d"u3206 6P.A1' 9 OS50HNE UO 012/U2a Gray & Osborne, Inc., Com'ulting Engineers developed 10- end 100-year flows ere limited to the predeveloped respective design events. Detention in the northwest subbesin is designed to use storage capacity in the infiltration pipes and voids in the gravel backfill. The infiltration pipes will typically be located below the treatment swales in the planter strips. Calculations for the detention suing ere included in Appendices, TABhE 2 Detection Model Results for Roadway Improvements Since the road is typically crowned at the center, end surface water flows to both sides, each side of the road must have a bioswale for atormwater treatment For modeling purposes, this Swale typically will be a standard 10-inch-deep, 2-foot, 6-inch-wide ditch. with the fore slope of 3:1, end the back slope being 2:1 (or flatter) as shown on the plans. The biosweles are required to treat the peak flow from the 6-month storm. The peak 6-month storm flows for each subbasin were determined using the SBUH model. Table 3 shows the calculations for the quantity of water each bioswale is required to treat. The required bioswale dimensions were calculated using the design procedure outlined in the 2001 Western Washington DOE Manual which is equivalent or more stringent than [he WSDOT Highway Runoff Manual. I[ was assumed that the grass would be S inches tall. The runoff can be up to 2 inches below the height of the grass, making the maximum depth of water in the Swale 3 inches. Manning's n, a constant that accounts for flow retardance was selected to be 0.25 because a Swale is a straight, vegetated channel. The slope of the swales were taken to be 2 perccnt. Water must remain in the swales for _ minutes to receive adequate treatment. Using the velocity of the water, the retention time was used to determine the required length of the swales. The necessary bioswele length and width was calculated for the north cad south slopes of the basin. Bioswales will be required on both sides of the road, and each is required to have the dimensions listed below. City ojYelm 5 Stevens So-eerNW Roadway /mprovementr Srorm Drainage TlR November 2(106 NOV-29-2006 19:19 2062933206 96: P.12 Water Quality Treatment 1 U28/[OGS lbn'. 3a FnX [V6-'_63G[OE i3NA1' & 0360FHE I~ P73/u[4 Gray & Osborne, /nc., Comv(ting Engineers TABLES Bioswale Design The Wazhington State Department of Transportation Highway Runoff Manual requires that the peak flow from [he 6-month, 24-how storm, of 64 percent of the volume of the 2-year, 24-hour storm, be treated prior to discharge into surface waters. This applies to pollution generating impervious surface runoff Impervious surface is defined az "A hazd surface area which either prevenu or retards [he entry of water into the soil. Common impervious surfaces include roof tops, walkways, patios, driveways, pazking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled suffaces," Because the road and shoulder are used by motor vehicles, they will be classified az pollution generating. The WSDOT Highway Runoff Manual Minimum Requirement 4: Water Quality Control requves that "a project adding new impervious surface shall achieve a net gain in the level of water quality treatment" and [hat the designer shall "investigate the practicability of providing water quality veatment for runoff from any existing impervious areas." Based on the findings of that investigation, "BMPs for existing impervious runoff will be implemented whenever the investigation demonstrates that it would be more practicable az demonstrated in the practicability analysis." In the absence of a practicability analysis, it was assumed that the entire existing impervious area will require treatment. The City of Yelm has directed that the requirements of the 2001 Washington State Department of Ecology Stormwater Management Manual for Wcstem Washington will be applied to this project. The project proposes adding more Shan 5,000 square fee[ of new impervious area; therefore, Minvnum Requirements #1 tfuough #10 apply. Initial modeling was completed using accepted methods for the Highway Runoff Manual and the 1992 DOE manual (SBUH model). The final facility design was modeled using [he model adopted in the 2001 DOE Manual (W WHM). This report uses the outline of the 2001 DOE manual for the following minimum requirements. The City of Yelm has pemit authority for the project for general permits. MINIMUM REQUIREMENT #1 - PREPARATION OF STORMWATER SITE PLANS The project has a total of new and existing impervious surface that exceeds 5,000 square fee[ and therefore must prepare a Stormwatez Site Plan for local government review. The Stormwater Site Plan must prepared in accordance with Chapter 3 of the 2001 DOE 6 Clry oJYelm November 1006 Steven Smeet NW Roadway Imprwemen(s Storm Drainage T1R NUV-29-9006 17:19 2062933906 96Z P. 13 CONDITIONS AND REQUIItEMENTS SUMMARY 17/2 A/20p6 16:3u FAX _062833206 GP.AY h OSBOFIIE ~j rile/C24 Cray & Osborne, Inc.. Consuhing Engineers Manunl. This TIR along with the plans and speci&cetions for the project include the information required in a Stormwater Site Plan which includes the following: • Project Overview • Existing Conditions Summary • Off•Site Analysis Report • Permanent Stotmwater Controls • Operation and Maincenance Requirements • Bond Quantity Worksheet MINIhIUM REQUIREMENT #2 -CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPP) The project is a redevelopment project and therefore must comply with Conswction SWPP Elements #I through #]2. The elements include the following: • Element #1: Mazk Cleating Limits • Element #2: Establish Constction Access • Element #3: Convol Flow Rates • Element #4: Install Sediment Convols • Element #5: Stabilize Soils • Element #6: Protect Slopes • Element #7: Protect Drain lnlers • Element #g: Stabilize Channels end Outlets • Element #9: Convol Pollutants • Element #10: Control Dewatering • Element #1l: MainteinBMPs • Element #12: Manage the Project Convect documents will require the convector to submit plans meeting the minimum elements and erosion and sediment convol requirements prior [o begiming Conswction. The City will approve these plans. Clearing and grubbing ofthe-right-of-way is anticipated for this project. The City is in the process of obtaining all the required right-of-way for the project. Work will be performed within the fight-of-way. Best management practices will be used to convol runoff from the project area Please see the plans far specific best management practices employed for the project. MIMMUM REQUIREMENT #3 -SOURCE CONTROL OF POLLUTION Source control of pollution will be included in the best management practices during Conswction. No new potential polluting sources will result from this project. Water Ctry ofYelm 7 Sfevenr Smeef NW Roadway lmyravemenh Storm Drainage 77R November 1006 NOV-29-2006 17:19 2062833206 96Z P.14 11/?9/2ri0F 18[3J FAX ".VC?833?ug 6flAV 5 OSEOFNE 10015/0?0 Gray & Osborne, Ina. Coruuldng Engineerr quality vestment is being provided for stormwater runoff from the roadways and is discussed in greater detail under Minimum Requirement #4 below. MINIMUM REQUIREMENT #4 -PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND OUTFACES All proposed collection end conveyance systems will continue to use the natural drainage system for the basin. No alteration of natural drainage patterns will occur. MINIMUM REQUIREMENT #5 - ON-SITE STORMWATER MANAGEMENT This requirement includes the use of i~ltration, dispersion, or retention of stotmwater on site to the maximum extent feasible without causing flooding or erosion impacts. On-site stormwater management will be used for this project given the underlying soil types and nature of the project. MINIMUM REQUIREMENT #6-RUNOFF TREATMENT BMPS Water Qualify System The project includes more than 5,000 squaze feet of pollution generating surface in each of the two threshold dischazge areas (subbasins) which requires treatment facilities and onsite stortnwater BMPs. Treatment of the stormwater runoff occurs in roadside bioswalw and before infiltration and/or discharge. On-site BMPs include construction erosion and sediment convol facilities as directed by the project plans end specifications and regular road maintenance and litter convol. MIMMUM REQUIREMENT #7 -FLOW CONTROL Design Criteria -Performance Standards Per the 2001 DOE Manual, the project must provide flow convol to reduce the impacts of increased stormwater runoff from new impervious surfaces end land cover conversions. W star quantity convol requires detention for all rmoff from new impervious surfaces. Detention must reduce the peak developed outflow to 50 percent of the runoff from the existing site during a 2-year, 24-hour storm, and maintain the existing level of discharge during the 10-yeaz, 24-hotu and 100-year, 24-hour storms. Flow Control System New storm pipes provide detention. Required storage was determined through use of the Santa Bazbara Urban Hydrogreph (SBUH) method u outlined in the 1992 DOE Manual and verified to meet the requiremenrs of the 2001 DO£ Manual using the W WHM. Modeling was completed for the off-site basins incorporated into the final design. The northwest basin has approximately 0.01 acres of off-site contribution. The project will g Clry ofYelm November 1006 Stevera StreefNW Roadway lmprwemenu Smrm Drainage TlR NOV-29-3006 17:19 2062033266 96Z P.f6 t l/23/2006 16'.3a F.1H 2062933206 GRAY n 9S60FIIE X7016/920 Grog & Ot6ome, Inc., CouuUing Engrneerr detain stormwater flows to the preexisting conditions before discharge. The southeazt basin has no off-site contributing area. The prof act will increase peak flows by approximately `cfs for the 100-yeaz event. The detention system exceeds the flow requirements and allows existing base flows to continue their existing hydrology. Conveyance System Analysis and Design All conveyance for the system was sized using minimum flow criteria based on Manning's Equation for flow in pipe and minimum slopes based on the Washingtnn Srate Department of Ecology Criteria for Sewage Works ([he Orange Book). A Maming's number of 0.013 was used for all pipes. The minimum proposed pipe size is 12 inches in order to meet City standazds and maintenance requirements. "Rte lazgest proposed conveyance pipe is 12 inch. MINIMUM REQUIREMENT k8 - WETLANDS PROTECTION Existing surface flows feed wetlands in the vicinity of Yelm Creek. These wetlands will no[ be impacted by the project. MINIMUhf REQUIREMENT N9 -BASIN/VI'ATERSHED PLANNING No basin plan exists for the Yelm Creek drainage area. MINIMUM REQUIREMENT tF10 -OPERATION AND MAINTENANCE The storm drainage improvements will be maintained in accordance with the City of Yelm standards. The treatment biofiltration systems will be maintained in accordance with the DOE Stormwater Management Manual for Western Washington (Volume 4, Chapter 9). OPTIONAL GUIDANCE Hl -FINANCIAL LIABILITY Bond Quantities, Facility Summaries, sod Declaration of Covenant Not applicable. OPTIONAL GUIDANCE k2 -OFF-SITE ANALYSIS AND MITIGATION Modeling was completed for the entire off-site basins an incorporated into the final design. The northwest basin has approximately 0.01 acres ofoff-site contdbudon The project will detain stormwatei flows to the preexisting condidons before discharge into existing conveyance systems. The southeast basin has no off-site contributing area. The project will increase peak flows by approximately _cfs for the 100-year event, The detention system exceeds the flow requirements and allows existing base flows to continue their existing hydrology. Ciry ojYelm 9 Steverv Stree(NW RaaQway lmprwemenn Smrm Dra/nage TJR Nwem[rer 1006 NOV-29-2006 17:19 2062833206 962 P. 16 11 /29L^ar~5 13'.3a FAX 2G020332Ob 6RP.V 3 OSBONHE I~J017/l2V Gray & Osborne, Inc., Coruulfing Engfneers SPECIAL REPORTS AND STUDIES No basin plan exisu fot the Yelm Creek drainage azea. OTHER PERMITS No basin plan exisu for the Yelm Creek azea. The Ciry of Yelm has permit suthoriry for the project for general permits. t 0 C!ry oJYelm November 3006 Sseveru SneerNWRoadway lmpro~emenh Storm Droinage TlR NGV-29-2006 17:19 2062033206 96Z P. 17 11/20/[995 76'.35 FAX 2U62b832ob 5RA1' E iii6GflOE ~ Vln/p 20 APPENDIX A STORMWATER MODELING (SBUH) NnV-29-2006 17:20 2062833306 962 P.1B 11/23/2008 18.35 FAX 20626332un 56A4 & GSBONIIE '~e7 ~'1'i ~ri20 APPENDIX B STORMWATER MODELING (WWHM) NriV-29-2006 17:20 2062033206 96% P.19 11/2~/200E 19'35 FAX 20 n'2b'33 JVE i3 H.qY d 9GB0 HIIE ~ 020/'>~~ APPENDIX C DESIGN DRAWINGS NOV-29-2006 17:20 20628'x3206 96X P. 20