Loading...
1 OF 2(Page 1 of 2 ) Washington State, Department of labor and Industries -Electrical Plan Review Worksheet Date 02116!2007 Fadlrty. Yeim Public Safety Building Fadlity Address. 204 2nd ST SE, Yelm Project Title:. New Bldg (inductee Palic~ & Court House The Equipment and conductor ratings, loads, and Load calculation have been reviewed. Installation of the conductors and equipment described in this worksheet is subject to the N.E.C., R.C.W,, and W.A.C. rules and approval of the electrical inspector. *~Note: the inspection process must determine the suitability of equipment and devices for the available fain current. (NEC 110.9, NEC 110.10), (E) =Existing (N) =New Equipment Contact person, (425} 822.9499 Sean Bollen Wood Harbinger ConsuQing Engineers INC ~,p,R,#; 542-01-0744 Inspn ice, Tumwater Plans Examiner: Mike Buettner (360)902.5253 _ Over6~ Vo9 Fee __.. $0.00 inlspectiort Fee Total = $1,318.00 Inspct'n Fee x 35% $461.30 (WAC 296-46B-905} + $58.00 Additional Hour - 0 Hours x $69.0 $OAO Pin Review Total = $519.30 (Handling} + $16.00 Plan Review Total = $535.30 Distribution Diagram From To voltage ~ Overcurrent Device Line Load Wire Sipe Rated Amps Load - - - • • - in - - • • • • -KVA ConnectediCalculatedlMetered Load Am s item Fee UTILITY XFMR CT ENCLOSURE 208 3 3 CU 1,260 375.69 364.71 1,014 120 600 Fees NIA CT ENCLOSURE MDP 208 3 1200 3 CU 1,260 375.69 364.71 1,014 $351.00 MDP RTU-2 DISCONNECT 208 3 175 per equip. 1 CU 115 57.70 57.70 160 $58.00 120D 200 (57.7 kva) 120 2!0 Feeder MDP RTU-4 DISCONNECT 208 3 45 per equip 1 CU 65 13.47 13.47 37 $46.00 1200 fi0 (13.47 kva) 120 6 Feeder MDP RTU-5 DISCONNECT 208 3 200 per equip 1 CU 200 11.43 71.43 199 $58.00 1200 200 (71,43 kva} 120 310 Feeder MDP EP1 via ATS-2 208 3 1D0 100 1 CU 115 7.78 8.85 25 $46,00 1200 100 120 2 Feeder vrww.Int.wa.govlTradesLicensinglelectrical 502-01-0704 (Page 1 of 2 )