1 OF 2(Page 1 of 2 )
Washington State, Department of labor and Industries -Electrical Plan Review Worksheet
Date 02116!2007
Fadlrty. Yeim Public Safety Building
Fadlity Address. 204 2nd ST SE, Yelm
Project Title:. New Bldg (inductee Palic~ & Court House
The Equipment and conductor ratings, loads, and Load calculation have been reviewed.
Installation of the conductors and equipment described in this worksheet is subject to
the N.E.C., R.C.W,, and W.A.C. rules and approval of the electrical inspector.
*~Note: the inspection process must determine the suitability of equipment and devices
for the available fain current. (NEC 110.9, NEC 110.10),
(E) =Existing (N) =New Equipment
Contact person, (425} 822.9499 Sean Bollen
Wood Harbinger ConsuQing Engineers INC
~,p,R,#; 542-01-0744
Inspn ice, Tumwater
Plans Examiner:
Mike Buettner (360)902.5253
_
Over6~ Vo9 Fee __..
$0.00
inlspectiort Fee Total = $1,318.00
Inspct'n Fee x 35% $461.30
(WAC 296-46B-905} + $58.00
Additional Hour - 0
Hours x $69.0 $OAO
Pin Review Total = $519.30
(Handling} + $16.00
Plan Review Total = $535.30
Distribution Diagram
From To voltage ~ Overcurrent Device
Line Load Wire
Sipe Rated
Amps Load - - - • • - in - - • • • • -KVA
ConnectediCalculatedlMetered Load
Am s item Fee
UTILITY XFMR CT ENCLOSURE 208 3 3 CU 1,260 375.69 364.71 1,014
120 600 Fees NIA
CT ENCLOSURE MDP 208 3 1200 3 CU 1,260 375.69 364.71 1,014 $351.00
MDP RTU-2 DISCONNECT 208 3 175 per equip. 1 CU 115 57.70 57.70 160 $58.00
120D 200 (57.7 kva) 120 2!0 Feeder
MDP RTU-4 DISCONNECT 208 3 45 per equip 1 CU 65 13.47 13.47 37 $46.00
1200 fi0 (13.47 kva) 120 6 Feeder
MDP RTU-5 DISCONNECT 208 3 200 per equip 1 CU 200 11.43 71.43 199 $58.00
1200 200 (71,43 kva} 120 310 Feeder
MDP EP1 via ATS-2 208 3 1D0 100 1 CU 115 7.78 8.85 25 $46,00
1200 100 120 2 Feeder
vrww.Int.wa.govlTradesLicensinglelectrical 502-01-0704 (Page 1 of 2 )