Loading...
City of Yelm Inspection Form Tahoma Terra FairWay Multi-Family#11 City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 5/05/08 Day: Monday Time: 4:15 p.m.  Project Name: Tahoma Terra / FairWay Multi-Family Project Number SPR-05-0750-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development / KPFF  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Clear, Cool, Sunny  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. DeRainscription of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor RGD is working on the new water main tie for TT Fairway Multi-Family project, this tie-in will connect water line from Nisqualy Meadows Development to Tahoma Terra through Fairway Multi Family to Vintage Greens. Contractor is also working on garding some of the area where the water line went in.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor RGD is working on the water main tie-in.  5. Sketch or Paste Pictures Below:    Date 5/5/08 Typed or Printed Name and Title Steve Harrington Signature