Loading...
05-0750 Sewer Review No 1 072707 CITY OF YELM SEWER DEPARTMENT July 27, 2007 Re: Tahoma Terra Multi- Family Housing A gate valve is needed at the connection point to the existing sewer main. An Air Release Assembly is required at the high point approx STA # 2+00.97 of this main line An “End of Line Clean-Out” is required at the end of this main line. The Step Table item # 10 refers to a detail on sheet C7.2 for service Connections. This is not on sheet C7.2 The Step Table item #12 refers to City of Yelm Std. Drawing 7-12, for service connections. 7-12 is a drawing of an Air Release Assembly. Please show the location of all Pump Control Panels. Please show the location of hose bibs within 50 feet of each tank for servicing tanks etc. Please show all Side sewers and Clean-outs. All Side Sewers enter the tanks at the end of the tank, not the side. Details need to be shown for Duplex pump systems not simplex.